Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    Drainage Research at Mount Isa Mines Limited 1992 - 1997

    By Chend J

    Research conducted into backfill drainage at Mount Isa Mines since 1992 is described. Piping in draining backfilled scopes has been the primary cause of bulkhead failures and emphasis is placed on r

    Jan 1, 1998

  • AUSIMM
    Influence of Cognitive Biases on Project Evaluation

    By S Love, M Anderson, M Boland

    "The high rate of failure of new mine developments to meet feasibility study expectations has been the subject of many fine technical papers. Yet failure rates remain stubbornly high.Similarly, the co

    Mar 8, 2016

  • AUSIMM
    Computerised Orebody Modelling and Mine Design for Chiria Iron Ore Deposit

    By Sen A. K

    The Chiria Iron Ore deposit falls within the well-known Horse-shoe-shaped Singhbhum-Bonai-Keonjhar belt in India, where most of the deposits supplying ore to various steel works of Steel Authority

    Jan 1, 1995

  • AUSIMM
    Resources of Mineral Sands, What of their Future?

    In 1985 BMR assessed Australia's economic demonstrated resources of mineral sands as follows: rutile 8.0 Mt, ilmenite 41.4 Mt, zircon 11.5 Mt, and monazite 229 000 tonnes. These resources are

    Jan 1, 1986

  • AUSIMM
    From paper to bytes – digital mapping implementation

    By A Whaanga

    The use of photogrammetry has greatly increased the accuracy of 3D mapping underground. However, this has not reduced the need or desire for geologists to produce plans and sections showing an interpr

    Mar 22, 2022

  • AUSIMM
    On-Belt Analysis at Sepon Copper Operation

    By T Arena

    To maintain copper recoveries and maximise production at the Sepon Copper Operation it is crucial to control the amount of copper entering the leaching circuit. This requires close control of blending

    Aug 8, 2011

  • AUSIMM
    Developments of the Mackie Vat Leaching Jig

    Traditional vat leaching has been done on a batch basis, which involves loading the vats, leaching, drainage, washing, draining again, and unloading. As a result of these many steps and the attenden

    Jan 1, 1991

  • AUSIMM
    Automating Communications between Laboratories and Mines – A Case from the Coal Industry

    By S Mundell, J Armstrong, M Evans

    "Automation is a common goal within the coal industry for reasons such as efficiency, reliability and sustainability. However, it requires standards and frameworks so business systems can communicate

    Aug 18, 2014

  • AUSIMM
    Planning Cost Efficient Underground Ventilation Networks

    By Ruston R

    When coal mining first commenced in Australia, the principle objective was low cost production with development directed toward recovery of 'easy' coal. Future expans- ion of these early m

    Jan 1, 1983

  • AUSIMM
    Moving mORE for Less

    By G Brudek, P Elestedt

    Schalker Eisenhütte und Maschinenfabrik GmbH, Nordic Minesteel Technologies and Bombardier Transportation have developed an evaluation tool that considers the main cost drivers of the rail, truck

    May 9, 2016

  • AUSIMM
    A Numerical Model to Simulate the Effectiveness of Remedial Measures Aimed at Reducing Acidity and Metal Concentrations in the Ngakawau River and its Tributaries Near Stockton Coal Mine, West Coast, New Zealand

    By P Lindsay

    A numerical model has been developed to simulate the effectiveness and costs of a number of conceptual remedial measures aimed at reducing acidity and metal concentrations in the Ngakawau River and it

    Jan 1, 2006

  • AUSIMM
    Mitigation of Post-blast Fume in Soft Ground and Wet Conditions

    By S S. Kanchibotla, E J. Sellers, L Julian, A Musunuri

    Fume events in coalmines are typically associated with wet conditions, soft ground and deep holes. An ACARP research project used laboratory and field testing combined with literature reviews, numeric

    Aug 24, 2015

  • AUSIMM
    A new cut-off grade method to maximise resource utilisation of underground metalliferous mining operations

    By M Nehring, M Kizil, P Knights, A Mousavi, F Sotoudeh

    A cut-off grade is used to distinguish an economically viable block of ore from non-economical ones in mining operations. In order to obtain a high Net Present Value (NPV), a strategic and precise det

    Nov 10, 2020

  • AUSIMM
    The RockDataAcademy – a new open-access knowledge base covering the ins and outs of using sensors to scan ores

    By M Dalm

    More and more mining companies are becoming aware of the potential benefits of sensor-based ore sorting and process optimisation. This is reflected by a growing number of analysers that are available

    Sep 1, 2024

  • AUSIMM
    The Dangers Associated with Uncontrolled Combustion in Coal Mines

    The diverse nature of inadvertent mine fires does not lend them to general treatment. But evolving from the unfortunate fires over past years is a simple principle in dealing with all fires to brin

    Jan 1, 1981

  • AUSIMM
    Application of Shuttle Radar Topography Mission Data in Hydrological Analyses of Super Pit and Griffin Coalmine

    By A K. Ghosh

    "Inrush of water is always an issue, especially for mines located in heavy rainfall areas. Nowadays, mining companies and research institutes have developed many advanced technologies for study and an

    Nov 15, 2016

  • AUSIMM
    Coal Resources of Western Australia

    Despite the large areas of sedimentary basins in Western Australia, the coal resources are very meagre., This is a serious problem for the State, which-at present-lacks any other alternate source o

    Jan 1, 1964

  • AUSIMM
    A Three-Dimensional Structural Interpretation of the Olympic Dam Deposit ù Implications for Mine Planning and Exploration

    By J, T C. McCuaig, J Hodgkison, T Fouet

    Olympic Dam is the eighth largest Cu deposit and the largest U deposit in the world, with approximately 35 million tonnes of contained Cu and 1.2 million tonnes of U. The most recent resource estimate

    Jan 1, 2004

  • AUSIMM
    Studies on Chlorination of Rutile and Struverite

    By Azizan A

    The paper presents the results of chlorination of beneficiated rutile and struverite (a tantalum-niobium bearing, rutile type mineral in alluvial tin deposits) by carbon tetrachloride in the range 6

    Jan 1, 1996

  • AUSIMM
    Current Billing Technology In Mineral Exploration

    By Emerson J

    Drilling has always been one of the most important parts of the exploration process with most companies spending around 25% of their budget on drilling. Although superficially there appears to be

    Jan 1, 1987