Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
Test Work on High Throughput Diamond Tracer Recovery from Alluvial Recovery Tailings with a Containerised Optical Sorter Under Real Production ConditionsTest Work on High Throughput Diamond Tracer Recovery from Alluvial Recovery Tailings with a Containerised Optical Sorter Under Real Production Conditions Worldwide alluvial diamond deposits are tradi
Sep 13, 2010
-
Design of Large and Shallow Caverns of New York Second Avenue SubwayBy Verya Nasri
The proposed Second Avenue Subway Project in New York City is approximately 8.5 miles long, up to a depth of 120 feet beneath grade and runs the length of the eastern side of the island of Manhattan f
Jan 1, 2008
-
Sustainable Carbon in Steel Making - Plant Trials at the Sydney Steel MillOneSteel and BlueScope Steel have been working with the CSIRO to develop sustainable carbon fuels and reductants which are suitable for use in the iron and steel industry. One of the initial focuses o
Jun 1, 2010
-
Gold in Tailings - Mineralogical Characterisation and Metallurgical ImplicationsBy C A. Fleming
Gold extraction is largely driven by mineralogical factors, which often cause gold losses to various tailings. Mineralogical factors affecting gold recovery include grain size and shape, surface coati
Jan 1, 2007
-
SAG Mill Operation at Cortez: Evolution of Liner Design from Current to Future OperationsBy Raj K. Rajamani, Sanjeeva Latchireddi, Dave Plummer, Stieger. Julius
"The Cortez SAG mill liner design was recently modified to improve the mill operating energy efficiency. In addition to the expected benefits, the design change unexpectedly played a significant role
Jan 1, 2007
-
Deformation analysis for the middle pier of the Permanent Ship Lock of Three Gorges ProjectBy H. Zhu, F. Xu, T. Wang
Abstract : The deformation monitoring data of the middle pier of the in permanent ship lock in Three Gorges revealed several interesting deformation phenomena. Conclusions and explanations are made co
Jan 1, 2003
-
Rapid Mine Drifting & Tunneling, A Review of the Current Situation at some Selected Mines and Civil Projects from around the WorldBy Gunnar Nord
Introduction ??Atlas Copco has customers both amongst Miners and Contractors ??We believe that the contractor's approach to tunnelling is worthstudying ??For a tunnel contractor the incenti
May 1, 2009
-
MBTA Silver Line Phase III?Completes Boston?s Newest Transit LineBy Gregory Yates
INTRODUCTION Project Description The Silver Line is a Bus Rapid Transit (BRT) Line and is Boston?s newest transit service. Silver Line Phase I extends along Washington Street entirely on the surface
-
Alternative Final Cavern Linings For The East Side Access Transit ProjectBy Colin Barratt
The East Side Access (ESA) project is the largest underground rail infrastructure project under construction in New York City, USA. The Manhattan segment of the project is to be mined through rock and
-
Function Analysis of Stemming DevicesBy Carl Lubbe, Ron Frye
Numerous articles have been written regarding the effects of blast control plugs in an attempt to quantify stemming ejection rates, air overpressures, fragmentation’and other parameters measured using
Jan 1, 1998
-
Hierarchical Systems Analysis Of Potential Environmental Impacts Of Aggregate Mining ActivitiesBy K. E. Kolm, W. H. Langer
Developing natural aggregate resources (sand, gravel, and stone) creates environmental impacts. A systems analysis method has been designed to characterize the components of the environmental system,
Jan 1, 2001
-
OFR-133(2)-81 Study Energy Absorption Characteristics Of A Pit Bottom Buffer - Vol. IIBy F. A. Penning
An experimental and analytical investigation was conducted on a recoverable pit bottom buffer. Work was conducted at the Colorado School of Mines using the U.S. Bureau of Mine-s free fall test tower.
Jan 1, 1980
-
Repair the Fan, Save MoneyBy Thomas J. Kuli, Tim Rape
When a fan or blower breaks down or becomes worn, customers have two choices. They can replace it or they can have it repaired. In the past, replacement was the preferred option, especially when the
Jan 1, 2005
-
OFR-17-72 Measurement Of Temperature Profile Around Coal Mine OpeningsThis work presents: 1.) the results obtained from measurements of temperature profiles in pillars and at working faces of three coal mines located in Colorado and New Mexico, 2) a comparison of the ex
Jan 1, 1972
-
-
Extracción de Arsénico, Antimonio y Obtención de Plata de Concentrados Complejos de Cobre (Tetraedrita - Tennantita)By Roberto Vargas
"El presente Trabajo de Investigación, tiene por objeto describir la tecnología, la operación del Proceso en la Planta que implementa dicha tecnología así como los resultados obtenidos en dicho Proces
Sep 1, 2017
-
Crane Boom Loadings From Pile DrivingBy Alan G. MacKinnon
Loads and stresses from pile driving are increasing from heavier piles and more powerful hammers. Stresses can be dangerous to equipment stability. Equipment developer MacKinnon tells how to compute s
Jan 1, 1986
-
OFR-61-81 The Impact Of Eliminating Safety Fuse From Metal/Nonmetal MinesBy Dipak Sengupta
This study analyzes the safety, technology, and economic impact of eliminating safety fuse from metal/nonmetal mines, based on operation and manufacturer experience over the past five to ten years. If
Jan 1, 1980
-
Potential linkage between thermal degradation and mineral magnetic properties of Cu-rich chimneys in the Southwest PacificBy Jai-Woon Moon, Wonnyon Kim
Deep-sea hydrothermal vents (hereafter chimneys) are commonly found on the new crust forming along divergent plate boundaries. Related to the chimney cycle from birth to death, it is hard to define th
Sep 1, 2014
-
Bearing Capacity Of Piles Using Cavity Expansion Theory ? SummaryBy R. Bellotti
The theory of cavity expansion in an infinite frictional soil mass whose strength is represented by a curved Mohr-Coulomb failure envelope has been used to predict with some confidence the cone resist
Jan 1, 1987