Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • SME-ICGCM
    Integrating Ground Control And Mine Site Data Through A Geographic Information System

    By Douglas C. Peters

    Part of the ground control research at the U.S. Bureau of Mines is involved with improving ground control data collection and analysis methods. A geographic information system (GIs) is being used with

    Jan 1, 1990

  • SME-ICGCM
    High Capacity Tensioned Cable Bolts For Tailgate Support

    By Stephen C. Tadolini

    A joint research program was designed and conducted at Lodestar Energy?s Baker Mine to investigate the performance of a high-capacity tensioned cable supported gateroad. The secondary system consisted

    Jan 1, 2000

  • SME-ICGCM
    Microseismic Monitoring of Mountain Bumps and Bounces: A Case Study

    By J. L. Condon

    The Bureau of Mines, through in-house and contract research, monitored mountain bump-prone areas of the Olga #2 Mine, near Welch, WV, using microseismic techniques for 15 months during 1985 and 1986.

    Jan 1, 1987

  • SME-ICGCM
    Stability of a Gateroad Used Simultaneously for Two Retreating Longwall Faces

    By Stanislaw Prusek

    In this paper, results of underground measurements conducted in gateroad 3, seam 615, at the Bobrek-Centrum Colliery are presented. The Bobrek-Centrum Colliery is owned by Kompania Weglowa, the larges

    Jan 1, 2014

  • SME-ICGCM
    Ground Control Practice at Leeville Underground Mine

    By Changshou Sun

    The geotechnical properties of mining zones at Leeville Underground mine (or simply called Leeville mine through this paper) are different from one zone to another. The typical ground condition is poo

    Jan 1, 2013

  • SME-ICGCM
    Experience With The Boundary Element Method Of Numerical Modeling As A Tool To Resolve Complex Ground Control Problems

    By George J. Karabin

    The Roof Control Division of the Pittsburgh Safety and Health Technology Center, MS HA, is routinely involved in the evaluation of ground conditions in underground coal mines. Assessing the stability

    Jan 1, 1994

  • SME-ICGCM
    Influence Of Partings In A Coal Seam On Long Term Pillar Stability

    By K. Biswas

    So far, all pillar design methods or approaches consider the coal seam as a uniform structure From some mine visits in northern Appalachian Region. it is found that some coal seams have binder or part

    Jan 1, 1995

  • SME-ICGCM
    Modern Shield Technology: Better Than Ever But Still Not Perfect

    By Thomas M. Barczak

    A survey of the longwall industry was conducted to examine the performance of modern shield technology. The results of this survey indicate that state-of-the-art shields perform better and last longer

    Jan 1, 1999

  • SME-ICGCM
    Geotechnical Investigation For A Single Entry Design For Longwall Mining

    By Madan M. Singh

    Currently longwall coal mining operations require at least 3 entries on both the headgate and tailgate ends because of ventilation and safety requirements. Driving of entries, however, is a slow and c

    Jan 1, 1982

  • SME-ICGCM
    Analysis of Cutter Roof Using the Boundary Element Method

    By Mikko Ahola

    This paper describes recent innovative analyses conducted by the Bureau of Mines to demonstrate the application of the boundary-element method in evaluating the effectiveness of caving chambers or sac

    Jan 1, 1987

  • SME-ICGCM
    Enhancing Mine Subsidence Prediction and Control Methodologies

    By Michael Karmis

    During the last 25 years, technological advancement and subsidence research have resulted in more accurate and diverse prediction capabilities. The work presented in this paper focuses on the developm

    Jan 1, 2008

  • SME-ICGCM
    The Role Of Engineering And Geology In Analyzing Ground Control Conditions

    By David A. Newman

    Severe roof control problems have plagued a West Virginia underground mine since its initial development in the late 1970's. Adverse roof conditions in the Eastern portion of the reserve result f

    Jan 1, 1999

  • SME-ICGCM
    Alternatives For Controlling Cutter Roof In Coal Mines

    By Nicholas P. Kripakov

    The unpredictable massive collapse of roof in openings developed under apparently safe and stable roof conditions in coal mines of the United States has been of much concern for many years. One type o

    Jan 1, 1982

  • SME-ICGCM
    Design Of Roadway Support Using A Strain Softening Model

    By Jamal Hematian

    Understanding the behaviour of rocks in a high horizontal stress field, such as that in Australia, is critical when analysing the stability of underground structures. This paper addresses the signific

    Jan 1, 1994

  • SME-ICGCM
    Performance and Safety Considerations of Hydraulic Support Systems (eb62774d-dbca-420f-b228-950711bafbce)

    By Thomas Barczak

    Hydraulic cylinders are used in several roof support systems, such as longwall shields and mobile roof supports, to provide critical ground control Many state-of-the-art hydraulic support system opera

    Jan 1, 1998

  • SME-ICGCM
    Aerostatic Support System For Underground Coal Mines

    By R. J. Morrell

    The Bureau of Mines developed a ground support system for use with an underground coal auger. The system consists of inflatable airbags that are inserted in the holes as they are drilled, and then gra

    Jan 1, 1988

  • SME-ICGCM
    Rockburst Control Measures at INCO's Creighton Mine

    By P. Oliver

    Rockburst conditions were first encountered at Inco's Sudbury area operations in the mid 1930's when mining advanced to below the 610 m (2000 ft.) horizon. Now, mining is being carried out a

    Jan 1, 1987

  • SME-ICGCM
    Effect of High Horizontal Stress on Coal Mine Entry Intersection Stability

    By K. Hanna

    This manuscript describes an extensive ground control study at the Inland Steel No. 2 Mine near McLeansboro, IL, conducted by the U.S. Department of the Interior's Bureau of Mines (USEM) in coope

    Jan 1, 1986

  • SME-ICGCM
    Shield Monitoring To Forecast Severe Face Weightings At The South Bulga Colliery, NSW, Australia

    By Jim Sandford

    The South Bulga Colliery longwall operation, owned and operated by Cyprus Coal Australia. Oakbridge Pty. Ltd., and located near Singleton, NSW, is currently operating under an average 80-ft-thick (24-

    Jan 1, 1999

  • SME-ICGCM
    Application Of A Static And Geophysical Monitoring System For Detection Of Stability Problems

    By Maleki. Hamid

    The U.S. Bureau of Mines implemented an inte¬grated static and geophysical monitoring program in a southern Wyoming mine to study changes in seismic wave propagation properties in roof strata. The pur

    Jan 1, 1993