Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
Integrating Ground Control And Mine Site Data Through A Geographic Information SystemBy Douglas C. Peters
Part of the ground control research at the U.S. Bureau of Mines is involved with improving ground control data collection and analysis methods. A geographic information system (GIs) is being used with
Jan 1, 1990
-
High Capacity Tensioned Cable Bolts For Tailgate SupportBy Stephen C. Tadolini
A joint research program was designed and conducted at Lodestar Energy?s Baker Mine to investigate the performance of a high-capacity tensioned cable supported gateroad. The secondary system consisted
Jan 1, 2000
-
Microseismic Monitoring of Mountain Bumps and Bounces: A Case StudyBy J. L. Condon
The Bureau of Mines, through in-house and contract research, monitored mountain bump-prone areas of the Olga #2 Mine, near Welch, WV, using microseismic techniques for 15 months during 1985 and 1986.
Jan 1, 1987
-
Ground Control Practice at Leeville Underground MineBy Changshou Sun
The geotechnical properties of mining zones at Leeville Underground mine (or simply called Leeville mine through this paper) are different from one zone to another. The typical ground condition is poo
Jan 1, 2013
-
Stability of a Gateroad Used Simultaneously for Two Retreating Longwall FacesBy Stanislaw Prusek
In this paper, results of underground measurements conducted in gateroad 3, seam 615, at the Bobrek-Centrum Colliery are presented. The Bobrek-Centrum Colliery is owned by Kompania Weglowa, the larges
Jan 1, 2014
-
Experience With The Boundary Element Method Of Numerical Modeling As A Tool To Resolve Complex Ground Control ProblemsBy George J. Karabin
The Roof Control Division of the Pittsburgh Safety and Health Technology Center, MS HA, is routinely involved in the evaluation of ground conditions in underground coal mines. Assessing the stability
Jan 1, 1994
-
Influence Of Partings In A Coal Seam On Long Term Pillar StabilityBy K. Biswas
So far, all pillar design methods or approaches consider the coal seam as a uniform structure From some mine visits in northern Appalachian Region. it is found that some coal seams have binder or part
Jan 1, 1995
-
Modern Shield Technology: Better Than Ever But Still Not PerfectBy Thomas M. Barczak
A survey of the longwall industry was conducted to examine the performance of modern shield technology. The results of this survey indicate that state-of-the-art shields perform better and last longer
Jan 1, 1999
-
Geotechnical Investigation For A Single Entry Design For Longwall MiningBy Madan M. Singh
Currently longwall coal mining operations require at least 3 entries on both the headgate and tailgate ends because of ventilation and safety requirements. Driving of entries, however, is a slow and c
Jan 1, 1982
-
Analysis of Cutter Roof Using the Boundary Element MethodBy Mikko Ahola
This paper describes recent innovative analyses conducted by the Bureau of Mines to demonstrate the application of the boundary-element method in evaluating the effectiveness of caving chambers or sac
Jan 1, 1987
-
Enhancing Mine Subsidence Prediction and Control MethodologiesBy Michael Karmis
During the last 25 years, technological advancement and subsidence research have resulted in more accurate and diverse prediction capabilities. The work presented in this paper focuses on the developm
Jan 1, 2008
-
The Role Of Engineering And Geology In Analyzing Ground Control ConditionsBy David A. Newman
Severe roof control problems have plagued a West Virginia underground mine since its initial development in the late 1970's. Adverse roof conditions in the Eastern portion of the reserve result f
Jan 1, 1999
-
Alternatives For Controlling Cutter Roof In Coal MinesBy Nicholas P. Kripakov
The unpredictable massive collapse of roof in openings developed under apparently safe and stable roof conditions in coal mines of the United States has been of much concern for many years. One type o
Jan 1, 1982
-
Design Of Roadway Support Using A Strain Softening ModelBy Jamal Hematian
Understanding the behaviour of rocks in a high horizontal stress field, such as that in Australia, is critical when analysing the stability of underground structures. This paper addresses the signific
Jan 1, 1994
-
Performance and Safety Considerations of Hydraulic Support Systems (eb62774d-dbca-420f-b228-950711bafbce)By Thomas Barczak
Hydraulic cylinders are used in several roof support systems, such as longwall shields and mobile roof supports, to provide critical ground control Many state-of-the-art hydraulic support system opera
Jan 1, 1998
-
Aerostatic Support System For Underground Coal MinesBy R. J. Morrell
The Bureau of Mines developed a ground support system for use with an underground coal auger. The system consists of inflatable airbags that are inserted in the holes as they are drilled, and then gra
Jan 1, 1988
-
Effect of High Horizontal Stress on Coal Mine Entry Intersection StabilityBy K. Hanna
This manuscript describes an extensive ground control study at the Inland Steel No. 2 Mine near McLeansboro, IL, conducted by the U.S. Department of the Interior's Bureau of Mines (USEM) in coope
Jan 1, 1986
-
Shield Monitoring To Forecast Severe Face Weightings At The South Bulga Colliery, NSW, AustraliaBy Jim Sandford
The South Bulga Colliery longwall operation, owned and operated by Cyprus Coal Australia. Oakbridge Pty. Ltd., and located near Singleton, NSW, is currently operating under an average 80-ft-thick (24-
Jan 1, 1999
-
Application Of A Static And Geophysical Monitoring System For Detection Of Stability ProblemsBy Maleki. Hamid
The U.S. Bureau of Mines implemented an inte¬grated static and geophysical monitoring program in a southern Wyoming mine to study changes in seismic wave propagation properties in roof strata. The pur
Jan 1, 1993
-
Controlled Thrust And Torque Placement Of Mechanical Anchor Bolts And Their Relationship To Improved Roof ControlBy Anil Mahyera
Under contract to the Bureau of Mines, a roofbolting machine has been developed which will: control torque on the bolthead to within 4 percent of a set point, control thrust to a low level (150 lbf),
Jan 1, 1981