Stability of a Gateroad Used Simultaneously for Two Retreating Longwall Faces

- Organization:
- International Conference on Ground Control in Mining
- Pages:
- 7
- File Size:
- 1654 KB
- Publication Date:
- Jan 1, 2014
Abstract
In this paper, results of underground measurements conducted in gateroad 3, seam 615, at the Bobrek-Centrum Colliery are presented. The Bobrek-Centrum Colliery is owned by Kompania Weglowa, the largest hard coal producer in the European Union. Yearly production at the colliery, including the longwall system, is about 2 million tonnes. Gateroad 3 was used simultaneously for two retreating longwall faces, No. 1 and No. 2. This working was also employed for the conveyor belt for longwall No. 1 and served as a transport road for longwall No. 2. Approximately 100 meters of gateroad 3 was maintained behind the face of longwall No.1 and then, with the progress of longwall No. 2, it was liquidated. In this paper, we present the results of underground measurements of vertical and horizontal convergence in gateroad 3. We also present the results of numerical modeling for deformation of the working. Finally, we analyse the accuracy of the numerical calculations by comparing them to the actual deformation of gateroad 3.
Citation
APA:
(2014) Stability of a Gateroad Used Simultaneously for Two Retreating Longwall FacesMLA: Stability of a Gateroad Used Simultaneously for Two Retreating Longwall Faces. International Conference on Ground Control in Mining, 2014.