Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • SME
    Exploration Of P.T. Inco's Nickel Laterite Deposits In Sulawesi, Indonesia

    By H. O. Harju

    In July 1968, P.T. Inco Indonesia was granted a Contract of Work to explore and develop the nickel laterite resources on the southeastern peninsula of the island of Sulawesi. Since 1970, exploration h

    Jan 1, 1979

  • SME
    Characterisation Of Olivine-Rich Industrial Rocks Of Vourinos Complex, Northern Greece

    By A. Iordanidis

    Mining activities have recently been taken place in Vourinos mountain, northern Greece, exploiting the so-called ?olivinite?. A representative sample was collected from this mining area. Mineralogical

    Jan 1, 2006

  • SME
    An Improved Mechanism For Large Flotation Cells

    By E. L. Smith

    The development of larger size flotation machines, which started in the 1950's and 1960's, is still proceeding. The largest mechanical flotation machines avail-able today have unit volumes i

    Jan 1, 1983

  • SME
    Minerals Processing Fundamentals

    By S. K. Kawatra

    Three International Symposiums-the 14th International Minerals Processing Congress, the 17th APCOM, and the SME-AIME Fall Meeting special symposium on Design and Installation of Com¬minution Circuits-

    Jan 5, 1983

  • SME
    Trailing Cable - Getting Your Money's Worth

    By Cliff Holloway

    The past year has been difficult for Canada's primary industries. The mining, oil and forestry industries have been hit by low prices and a reduced demand for natural resources. Foreign competiti

    Jan 1, 1999

  • SME
    The Geology Of Georgia Kaolin Deposits--Progress And Problems

    By Sam H. Patterson

    This paper is concerned primarily with the kaolin deposits extending northwestward from Macon, Ga., which is in the western part of the Irwinton district (fig. 1). These deposits are in a belt of kaol

    Jan 1, 1977

  • SME
    Connecting Three Pump Stations, with Tunnels, on an Island, in Charleston, SC - NAT2022

    By Justin Kolster, Donald Benjamin, Kyle White

    Expansion of the Plum Island Wastewater Treatment Plant requires interconnection of three operating pump stations using only two existing 10-ft diameter shafts for access. These two existing shafts re

    Dec 1, 2022

  • SME
    Design and Construction Challenges at the Potomac River Tunnel in Washington DC - RETC 2021

    By Moussa Wone, Martino Scialpi, Colin LaVassar, Carlton Ray

    The Potomac River Tunnel (PRT) is the next major phase of the DC Clean Rivers Program. The design-build PRT project includes a 5.5-mile-long, 18-foot-internaldiameter tunnel, seven shafts, and two und

    Jun 13, 2021

  • SME
    Evaluation of U.S. Coal Mine Emissions

    By John C. LaScola, Gerald L. Finfinger, Michael A. Trevits

    Methane gas is an ever-present problem facing the underground coal mining industry. Mine operators are mandated by law to maintain safe concentrations of methane gas within the mine environment. Venti

    Jan 1, 1991

  • SME
    Risk Management Strategies for Southern Nevada Water Authority’s Lake Mead Intake No. 2

    By Steven W. DeCou, Marcus R. Jensen, Stephen Navin

    The Lake Mead Intake No. 2 is a project constructed for the Southern Nevada Water Authority which includes a 12-foot diameter lake tap and intake shaft constructed in over 225 feet of water; 1650 feet

    Jan 1, 1999

  • SME
    Urban Costs: The Contractor's Viewpoint

    By Patrick B. Kenny

    Generally speaking, it is safe to address this conference as a conclave of Engineers, Owners' Agents, Governmental Representatives, and Contractors. As a group, we have assembled here to learn of

    Jan 1, 1979

  • SME
    Construction of the Newell Creek Dam Inlet/Outlet Replacement Project - RETC2021

    By David Chastka, Isidro Rivera, Shawna Von Stockhausen, Idit Zarchi

    The City of Santa Cruz Water Department is replacing the existing Newell Creek Dam inlet/outlet works at Loch Lomond Reservoir in the San Lorenzo Valley. The project will improve the City’s overall op

    Jun 13, 2021

  • SME
    Maintenance Manpower Audit And Development

    By Myles E. Altimus

    One responsibility of a manager is to improve his human organization. Some executives believe a manager should be measured and compensated accordingly on the basis of his ability to improve the qualit

    Jan 1, 1966

  • SME
    HPGR rolls surface wear: In-line scanning of a laboratory-scale HPGR

    By Raj K. Rajamani, Samira Rashidi

    Wear is an extremely important topic when considering high-pressure grinding rolls (HPGR) for any new application. Given the inevitable variations in ore properties throughout a mine’s life, it is dif

  • SME
    Escalante Silver Mill: Project Approach And Performance Analysis

    By Randolph E. Scheffel

    Mill design and project execution are very demanding and interactive processes requiring the dedication and cooperation of many parties. The development philosophy which lead to the successful complet

    Jan 1, 1983

  • SME
    Gold Leaching with Organic Nitriles

    By J. E. Murphy, R. Y. Wan, K. R. Sandgren, M. C. Fuerstenau

    As part of a U.S. Bureau of Mines program to evaluate alternatives to sodium cyanide in gold leaching, three organic nitrile compounds were tested for their effectiveness as gold lixiviante. The organ

    Jan 1, 1993

  • SME
    Resistance Of Fan Drifts - A Model Study ? Introduction

    By G. B. Misra

    Though installations of main mine fans vary widely, the commonest installation is of a surface exhaust fan connected to an upcast shaft some distance below its collar by a horizontal fan drift bending

    Jan 1, 1980

  • SME
    Reverse Flotation Of Diaspore From Aluminosilicates By A New Cationic Organosilicon Quaternary Ammonium Collector

    By Xinyang Yu

    The flotation of diaspore, kaolinite, pyrophyllite, illite and the diaspore-kaolinite mixture were studied with a new cationic organosilicon quaternary ammonium collector entitled QAS222. The acting m

    Jan 1, 2010

  • SME
    In soft ground, adaptable muck removal is key

    By Desiree Willis

    At 6 percent downgrade to a low point beneath California?s Sacramento River, the Lower Northwest Interceptor Sewer was a difficult project from the outset. Project owner Sacramento County Regional Sa

    Jun 1, 2010

  • SME
    Improving Productivity in Thin-Seam Continuous Mining at Tanoma

    By Scott G. Britton

    Thin-seam mining presents unique challenges when management or economic conditions require significant productivity increases. These challenges can be further amplified depending on such factors as la

    Jan 1, 1991