Connecting Three Pump Stations, with Tunnels, on an Island, in Charleston, SC - NAT2022

Society for Mining, Metallurgy & Exploration
Kyle White Donald Benjamin Justin Kolster
Organization:
Society for Mining, Metallurgy & Exploration
Pages:
9
File Size:
5527 KB
Publication Date:
Dec 1, 2022

Abstract

Expansion of the Plum Island Wastewater Treatment Plant requires interconnection of three operating pump stations using only two existing 10-ft diameter shafts for access. These two existing shafts require additional support to allow access 130 feet below grade. Interconnection requires rehabilitation of an existing tunnel, excavation of two new tunnels, and abandonment of additional existing tunnels. Construction has discovered unexpected conditions at all three connection points. The CMAR contracting method has effectively accommodated project team discussion, value engineering decisions, and allocation of risk during preconstruction and construction phase services.
Citation

APA: Kyle White Donald Benjamin Justin Kolster  (2022)  Connecting Three Pump Stations, with Tunnels, on an Island, in Charleston, SC - NAT2022

MLA: Kyle White Donald Benjamin Justin Kolster Connecting Three Pump Stations, with Tunnels, on an Island, in Charleston, SC - NAT2022. Society for Mining, Metallurgy & Exploration, 2022.

Export
Purchase this Article for $25.00

Create a Guest account to purchase this file
- or -
Log in to your existing Guest account