Connecting Three Pump Stations, with Tunnels, on an Island, in Charleston, SC - NAT2022

- Organization:
- Society for Mining, Metallurgy & Exploration
- Pages:
- 9
- File Size:
- 5527 KB
- Publication Date:
- Dec 1, 2022
Abstract
Expansion of the Plum Island Wastewater Treatment Plant requires interconnection of three operating pump stations using only two existing 10-ft diameter shafts for access. These two existing shafts require additional support to allow access 130 feet below grade. Interconnection requires rehabilitation of an existing tunnel, excavation of two new tunnels, and abandonment of additional existing tunnels. Construction has discovered unexpected conditions at all three connection points. The CMAR contracting method has effectively accommodated project team discussion, value engineering decisions, and allocation of risk during preconstruction and construction phase services.
Citation
APA:
(2022) Connecting Three Pump Stations, with Tunnels, on an Island, in Charleston, SC - NAT2022MLA: Connecting Three Pump Stations, with Tunnels, on an Island, in Charleston, SC - NAT2022. Society for Mining, Metallurgy & Exploration, 2022.