Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
Grinding Circuit Mill Design For Florida PhosphatesBy Craig M. Sams
Phosphate mines in Florida are continuing to encounter higher dolomitic content host rock with the phosphate pebbles(1) necessitating a change in grinding conditions and/or circuits, One of these chan
Jan 1, 1986
-
Practical Aspects Of Corrosion In The Wear Of Grinding Media (ebe1c47f-9c23-4521-96fe-efbad9f5616a)By M. J. Meulendyke
An extensive program of marked ball wear testing (MBWT), laboratory corrosion studies, and worn ball surface analyses has been used to gain insight about the role of corrosion in the overall wear proc
Jan 1, 1984
-
Selection of agglomeration process variables for increasing the LTD and reducibility of a magnetite-based acid pelletBy P. D. Nora, M. G. Ranade
A statistically designed pot grate-kiln test program was conducted to determine the agglomeration process variables necessary for increasing the low temperature disintegration resistance (LTD) and red
Jan 1, 1987
-
A Discrete Fracture Network Model for Prediction of Longwall‑Induced Permeability (Mining, Metallurgy & Exploration)By E. Watkins, S. J. Schatzel, V. Gangrade, K. M. Ajayi, Z. Khademian
Longwall-induced deformations could jeopardize the mechanical integrity of shale gas well casings positioned in the abutment pillar of a longwall mine. The in situ and induced fracture networks surrou
Jun 17, 2022
-
The Design of a Laboratory Apparatus to Simulate the Dust Generated by Longwall Shield AdvancesBy M. R. Shahan, W. R. Reed
A laboratory apparatus (shield dust simulator) was designed and constructed to simulate the dust generated during the advance of longwall hydraulic roof supports, or shields. The objective of the stud
Jan 1, 2019
-
Strategic Cost ManagementCapital budgeting and investment analysis have, to this point, been beyond the scope of this text. However, a recent conceptual development by John K. Shank and Vijay Govindarajan in the capital budge
Jan 1, 1999
-
Simple Options For Preventing Acid Mine Drainage From Heap Leachable Sulfide Gold OresBy G. E. McClelland
In recent years exploration and development of low-grade sulfide precious metal ore deposits has increased. Low- grade ores are usually processed using conventional heap leach cyanidation methods. The
Jan 1, 1996
-
In-Situ Measurements Of Copper And Moisture In An Operating Heap Using Advanced GeophysicsBy K. Lang
A test section of the upper most lift and underlying lifts of a large scale copper heap leach operation was instrumented and monitored with advanced wireline geophysics, fiber optics and resistivity e
Feb 23, 2014
-
Representation Of The U.S. Coal Industry In Context Of Integrated Long-Range Energy ModellingBy L. A. Rapoport
This paper outlines the methodology and results pertaining to the simulation of the U.S. coal industry in the context of an integrated, time-dynamic model of Long-Range Energy Developments and Supplie
Jan 1, 1977
-
Using Dry Iron Process To Produce Value Added Iron UnitsBy F. G. Rinker
The world demand for metallized iron continues to increase, keeping pace with steelmaking requirements for lower cost hot metal. Virgin iron ore and in-plant oxide fines can be reduced to direct reduc
Jan 1, 1999
-
Use Of Specialty Additives For Improved Mineral ProductsBy M. M. Carpenter
Specialty chemicals are widely used in the industrial minerals process industry for many different purposes including beneficiation, filtration, flocculation, dispersion and biological control. Optima
Jan 1, 1999
-
Analysis Of Truck Dispatching Strategies For Surface Mining Operations Using SIMANBy J. M. Mutmansky, B. Kolonja
A PC-based simulation model using the software packages SIMAN and CINEMA was developed to simulate and animate truck-shovel operations. The model is capable of simulating one mathematical dispatching
Jan 1, 1995
-
Kaolin For The Paper Industry - Introduction and SummaryBy K. J. Hartman
The term kaolin is derived from "kauling". a Chinese word meaning high ridge, which was the name of a hill in China where kaolin was first mined several hundred years ago.(1) Other common names used t
Jan 1, 1986
-
New kriging method for estimation from strings of data in a finite domain - SME Transactions 2009By C. V. Deutsch, O. Babak
A longstanding problem in geostatistics is that kriging usually assigns significantly greater weights to end samples in strings of data than it does to central samples. These weights are theoretically
Jan 1, 2009
-
Pyrometasomatic Deposits Of The Washington Camp -Duquesne District, Santa Cruz County, ArizonaBy Norman E. Lehman
INTRODUCTION The Washington Camp - Duquesne mining district is located on the east flank of the Patagonia Mountains, 98 kilometers south of Tucson and within 5 kilometers of the International border
Jan 1, 1977
-
Application Of The Taguchi Orthogonal Array Design To Cr (VI) Solvent ExtractionBy M. Kul
In this study, the effects of various extraction and stripping parameters, such as equilibrium pH (7.0, 8.5 and 10), extractant concentration (5, 10 and 20 volume %), organic-to-aqueous (O/A) ratio an
Jan 1, 2010
-
Bacteria In Hydrogeochemical ProspectingBy V. Price
Abstract: Action of certain strains of bacteria has been implicated as a significant factor in the oxidation of ore deposits. Other bacteria are thought to be significant in the formation of syngeneti
Jan 1, 1972
-
Photoelastic Analysis Of A Composite ModelBy R. K. Agarwal
In this paper a simple three-layered medium is considered. A circular hole is centrally located in the intermediate layer. The layered sheet is loaded uniaxially perpendicular to the stratification. T
Jan 1, 1968
-
A Database Application For Long Term Production Scheduling At LKAB's Kiruna MineBy Mark Kuchta
A new database application for long term production scheduling has been developed for LKAB's Kiruna mine. The scheduler uses a new block data structure whereby the monthly production data for thr
Jan 1, 2002
-
Distributed digital control at CuajoneBy S. Donges, P. L. Dunstan, B. J. Huls
The commissioning of a distributed digital control system for the grinding circuit at Cuajone was completed by mid-August 1985. Development of a successful strategy, excellent operator acceptability,
Jan 1, 1988