Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
Non-Destructive Testing Methods for Drilled Shaft and ACIP Piles (34748882-cb96-4081-9967-58c48901bc15)By George Piscsalko
"Quality control of drilled shafts and ACIP piles is greatly dependent upon the practices of the site personnel. In many applications it is difficult to properly inspect the shaft prior to concreting,
Jan 1, 2017
-
Non-Destructive Testing Methods For Drilled Shaft And Acip Piles (6922d0e7-932e-4be1-a810-c6fa95777bc9)By George Piscsalko
Quality control of drilled shafts and ACIP piles is greatly dependent upon the practices of the site personnel. In many applications it is difficult to properly inspect the shaft prior to concreting,
-
Design Practice Of Circular Diaphragm Wall Structure With Large Diameter ? SynopsisBy X. Y. Hou
The design practice of several circular underground projects with large diameter is summarized. By taking the advantages of load-bearing of circular structure, a rational annular tensile bar support s
Jan 1, 2010
-
Wireless Site Data Collection In Construction And Its Impact On The Business ProcessBy Jason N. Scott
It is now possible using low-cost wireless technology and rugged hand-held devices to record data on site electronically and for that data to be instantly available to others. This could potentially e
Jan 1, 2006
-
Drilling And Grouted Pipe Pile Foundation For Department Of Energy Spallation Neutron Source Target Building, Oak Ridge, Tennessee ? IntroductionBy Ronald E. Walkington
The U.S. Department of Energy (DOE) is building the world's newest accelerator-based, pulsed-neutron system, called Spallation Neutron Source (SNS). The facility, located in Oak Ridge, Tennessee,
Jan 1, 2001
-
Construction Of A Bicycle And Pedestrian Path West Of The Henry Hudson PWYBy David Coleman
This paper presents a case history involving the installation of drilled in piles with rock sockets for the Bicycle and Pedestrian Path project located west of the Henry Hudson Parkway within the Rive
-
The Theory Of The Expansion Of Cavities Applied To Pile Installation ? SynopsisBy D. A. Ponniah
The installation of a pile is considered analogous to the expansion of a cylindrical cavity of a diameter equal to that of the pile. Using Vesic's theory of the expansion of cavities the effect o
Jan 1, 1987
-
Foundation Code8 And Linit 8tatb Partial Factoring - SynopsisBy W. G. K. Fleming
The codification of foundation design and construction is a subject of extensive discussion in Europe and all current code proposals are based on limit state partial factoring. For simplicity, it is c
Jan 1, 1996
-
Risk Management For Dam Rehabilitation ProjectsBy Dave Paul
Dam rehabilitation involves a range of design, construction, and operation risks, some of which are not encountered in new dam construction. These risks can have significant impact on project schedule
-
High Capacity Drilled Piles in BrooklynBy Ahmed Elmekati, Frederick C. Rhyner, Steven R. Lowe
"The current phase of the Pacific Park development (formerly, Atlantic Yards) in Brooklyn involves constructing buildings on a platform over an existing LIRR rail yard. To preserve the maximum amount
Jan 1, 2016
-
Diplomacy And Innovation: Octakong And The Hong Kong-Zhuhai-Macau Bridge ProjectBy David White
When finished (projected completion in 2016) the Hong Kong-Zhuhai-Macau Bridge Project will comprise three cable-stayed span bridges and a 4.15 mile immersed tube tunnel - linking Hong Kong to Macau a
-
Diplomacy and Innovation: Octakong and the Hong Kong-Zhuhai-Macau Bridge ProjectBy David White
"When finished (projected completion in 2016) the Hong Kong-Zhuhai-Macau Bridge Project will comprise three cable-stayed span bridges and a 4.15 mile immersed tube tunnel - linking Hong Kong to Macau
Jan 1, 2017
-
Seismic Rehabilitation Of Seattle's Pier 69By David Pierce
The Port of Seattle, one of the largest on the west coast of North America, made a strong statement regarding their support for reusing existing structures when a decision was made to rehabilitate Pie
Jan 1, 1992
-
Effects Of Environment On Deep Foundation Elements - SynopsisBy Subhash B. Bhide
Deep foundations are affected by the presence of sulphates, chlorides, organic contents and water currents present in the soil. The sulphates in soil and ground water interfere first with setting of c
Jan 1, 1996
-
Analysis And Design Of A Piled Foundation For A Tall Tower ? SynopsisBy I. K. Ozaydin
Analysis of piles groups loaded with large bending moments and both vertical and batter piles can be best performed by matrix analysis. In this paper, a case history about a tall marine control tower
Jan 1, 2010
-
The Realities Of Resolving Conflicts During Construction ? SynopsisBy J. S. Ward
In a well-written set of contract documents, the probability of conflicts arising during the course of construction is minimized. However, no matter how complete may be the technical language in the c
Jan 1, 2010
-
Deepest Ever Large Diameter Pipe Pile Installation Demonstration Project New East Span San Francisco-Oakland Bay BridgeBy Saba Mohan
For the three full-scale pile installations, two different high-energy hydraulic hammers were selected for the installation. However, these hammers may not have sufficient energy to drive these large
Jan 1, 2002
-
The Behavior And Design Of Piled-Raft Foundations Under Lateral LoadingBy Serge Borel
An efficient design method is proposed for "piled-footing" and "piled-raft" foundation under lateral loads. It combines the methods used for the displacement design of shallow and deep foundations and
Jan 1, 2002
-
The Use of Bentonite in Underground ConstructionBy Hector Simchas
"1. BENTONITE: THE CRUCIAL CONSTITUENT OF SLURRYSuspensions of bentonite and water are used in a variety of applications in underground engineering. For the construction of underground elements like s
Jan 1, 2015
-
S21-Berlin – Design And Underwater Construction Of A Covered Contrustion Pit Without Direct Accessibility From AboveBy Grischa Dette, Thomas Schröder, Holger Merski
For the construction of the tunnel for the new Berlin S21 light rail line, a construction pit had to be built below the crossing B 96 federal road. For this purpose, the construction pit M’ has been b
May 1, 2022