Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
The Ecstall StoryBy R. D. Mollison
"Ecstall Mining Limited was formed to operate the Kidd Creek mine, discovered by Texasgulf Incorporated in 1961 the orebody is geologically very complex, containing rich values of zinc, copper, silver
Jan 1, 1974
-
Rapid determination of corrosion rates of permanent-mold cast copper-base alloysBy V. S. Sastri, M. Elboujdaïni
"Corrosion rates of silicon brasses, highzinc yellow brass, low-zinc yellow brass, leadedtin bronze and silicon bronzes in both permanent-mold and sand-cast conditions were determined in soft water of
Jan 1, 1997
-
Implementation of New Technology at Barrick GoldBy N. M. Stubina, P. J. Lind
Barrick Gold is in the process of building several new mines and implementing new processes at existing mines for which metallurgical technology is of key importance. The roles of the company's S
Jan 1, 2011
-
Testing and Implementation of a Fatigue Monitor System for Haul Truck OperatorsBy Mark W. Bartlett
Program Objectives ??Identify and implement a tool for haul truck drivers that: -Reduces or eliminates fatigue-related injuries and fatalities -Reduces accidents and equipment damage ??Following
May 1, 2011
-
Near-Term, Low-Cost and Secure PGM and Base Metal ProductionAn Attractive Investment ?Near term low cost and secure PGM producer ?restricted supply legislated demand ?strong pipeline of resource development ?Building Canada?s largest undeveloped PGM-Cu res
May 1, 2010
-
Uranium extraction from saline solutions using weak base anionic resinsBy K. Soldenhoff, M. Fainerman-Melnikova
The use of strong base resins for uranium recovery is severely affected by the presence of chloride ions in solution. In areas where high-quality process water is not readily available, the use of sal
Jan 1, 2012
-
Thunder Bay Terminals Ltd. Site Selection to Operation - The Management FunctionBy P. R. Cook
Thunder Bay Terminals' plant, now in operation, cost about 70 million dollars and was completed on time and under budget. The paper is the project manager's account of this accomplishment. F
Jan 1, 1979
-
The Role of Rock Mechanics Studies and Instrumentation in Balaghat Underground Mine of Moil - A Case StudyBy G. G. Manekar
MOIL Limited (formerly Manganese Ore India Limited), a Government Enterprise, under the Ministry of Steel, Government of India, produces about 1.1 million tonnes (T) of manganese ore annually from thr
Aug 1, 2013
-
Development of a Water Quality and Stability Index for DC Casting ProcessBy G. Girard, A. Larouche, J. Colbert, G. Doyer
"The Direct Chill (DC) casting process uses water to extract heat from molten aluminium and helps to control the solidification process. Many factors such as the water flowrate, water distribution ar
Jan 1, 2016
-
Acid mine drainage research in CanadaBy M. P. Filion, K. Ferguson, L. L. Sirois
Acidic drainage is the largest single environmental problem facing the Canadian mining industry today. Technologies to prevent acidic drainage from occurring in wasterock piles and tailings sites, and
Jan 1, 1990
-
Isotopic and Fluid Inclusion Constraints on the Origin of Vein Au Mineralization at Bousquet Township, QuebecBy Lawrence D. Hoy, Armand Savoie, Pierre Trudel, Ghislaln Tourigny, Robert Crépeau, Lao Kheang
"Recent fluid inclusion and stable isotopic studies in the Bousquet mining district have identified spatial and temporal trends in mineralization temperatures and isotopic compositions of vein forming
Jan 1, 1990
-
Estimating Rock Mass Properties and Seismic Response Using Higher Order, Discontinuous, Finite Element ModelsBy D. A. Beck
The load-deformation response of discontinuous rock under static and dynamic loading conditions has been simulated using Explicit Finite Element models. The intent of the analysis was to investigate t
May 1, 2009
-
Super Fine Grinding of Copper Concentrates for Pressure Leach Processing by Phelps DodgePhelps Dodge has recently operated a commercial scale, super fine grinding circuit of copper concentrates for use in a medium-temperature pressure leaching process. Two 355 kW vertical stirred mills w
Jan 1, 2007
-
Modelling a semi-batch reactive precipitation of ferrihydriteBy W. R. Richmond, T. S. Li, D. Ilievski
The reactive precipitation of ferrihydrite was studied in a laboratory semi-batch precipitator, where a highly concentrated sodium hydroxide solution was fed into an iron nitrate solution. Instantaneo
Jan 1, 2005
-
Contexte geologique et genese des gites d'amiante du sud du QuebecBy Robert Y. Lamarche
On exploite le chrysotile dans le sud du Quebec depuis plus de cent ans. Au cours des dernieres decennies, cette variete d'amiante est devenue une des principales substances minerales produites au Que
Jan 1, 1984
-
Development Of Wasteless Technology Of Copper Extraction From Sulphide OresBy G. S. Ospanova
The results of complex processing sulphide copper ore and advantages of recovery of copper by vat and heap leaching, sorption, cementation and electrolytic solutions processing and utilization of wast
Jan 1, 2007
-
Hydro-Fracturing Versus Hydro-Shearing: A Critical Assessment of two Distinct Reservoir Stimulation MechanismsBy V. S. Gischig, G. Preisig
Hydraulic stimulation of deep reservoirs is an essential procedure for developing engineered/enhanced geothermal systems (EGS), but also in other Geo-energy contexts. The goal is enhancing permeabilit
Jan 1, 2015
-
A Model to Predict Wear Rate of Shell Liners in Tumbling Mills - The Sarcheshmeh Copper Complex and the Gol-E-Gohar Iron Ore Company Sag Mill CasesBy Z. Bibak, S. Banisi, A. Ghasemi, E. Nematollahi
"The use of large AG/SAG mills in the mineral industry has been on the rise recently due to a significant reduction in the capital and operating costs for achieving significant increases in plant thro
Jan 1, 2016
-
Optimization of the Damang MineBy Charles Amoah
Abosso Goldfields Limited has been optimizing the comminution circuit at the Damang Mine Operation for the treatment of 100% primary ore. The optimization process started at a base rate of 343 tph whe
Jan 1, 2012
-
An analytical approach to the design of coal pillarsBy K. Barron
"A computer program is described which will analyze the stability of coal pillars. The extent of the peripheral failed zone and the central elastic core of the pillar, the stress distribution across t
Jan 1, 1984