Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    Unravelling the Factors Impacting on Concentrate Quality by Geometallurgical Data Analysis at Fortescue Metals Group’s Iron Bridge Magnetite Mine

    By A Manfrino

    The Iron Bridge magnetite mine and infrastructure project is currently in development as a joint venture between Fortescue Metals Group, Formosa and Baosteel. It is supported by an extensive database

    Jul 13, 2015

  • AUSIMM
    Variographic case study for designing, monitoring and optimising industrial measurement systems – the missing link in Lean and Six Sigma

    By O Bøckman, E Thisted, K H. Esbensen, U Thisted

    Process industry measurement systems, once installed, are often interpreted as static black boxes delivering correct values as long as not proven otherwise. After first implementation and set-up with

    May 9, 2017

  • AUSIMM
    Sampling Quality Assurance and Quality Control Requirements for Mining Projects

    The creation of an accurate and precise enough database requires the collection of many representative samples, subsampling and assaying them without destroying their integrity. The selection and impl

    Mar 1, 2010

  • AUSIMM
    Control of Water Discharge From Mine Ventilation Shafts

    Problems caused by water discharge from surface mine ventilation shafts can be significant and are usually unforseen. The discharged water is often hyper-saline or acidic and can cause environmental d

    Jan 1, 2002

  • AUSIMM
    Improving Production Drilling and Blasting in the Kim South Orebody at Agnew Gold Mine

    By T A. Carter

    In 2010 Agnew Gold Mine (AGM) struggled to produce the required tonnages from its stopes. The longhole rises used to create void in stopes were unreliable and often failed to gain the designed rise he

    Mar 24, 2014

  • AUSIMM
    A risk-based approach to drainage design standard selection for mine rehabilitation and relinquishment

    By A Densten, C Gimber

    Surface water management and drainage is a key aspect of mine rehabilitation and closure planning. In the authors’ experience, drainage related problems are amongst the most common forms of failure in

    Jul 25, 2018

  • AUSIMM
    Application of Ground Magnetic Surveys over Heavy Mineral Sand Strands to Increase Confidence in the Interpreted Continuity of the Modelled Resources

    By V O’Brien

    The suitability of magnetic surveys flown at low altitudes to identify buried heavy mineral (HM) strands has long been accepted. This is despite the low intensity magnetic response often obtained from

    Oct 5, 2011

  • AUSIMM
    Statutory Compliance of Sealing Plans and Information Required by Queensland Industry Regulators

    Following the Moura No 2 Wardens Court of Inquiry and subsequent changes to the Queensland Mining Legislation there is a requirement in Queensland coal mines for: a person with the recognised competen

    Jan 1, 2005

  • AUSIMM
    BHP Port Hedland wind fence – innovations in dust control

    By R Peiffer, L van Wyk

    The Port of Port Hedland is the largest bulk export terminal in the world and is one of Australia’s most important pieces of economic infrastructure. BHP is the largest Port user to support the export

    Sep 18, 2023

  • AUSIMM
    Measured Resources and Proven Reserves – Are they still Relevant?

    By S Juras

    The terms measured resources and proven reserves denote the highest level of estimation confidence in all of the major classification schemes. But what do they really bring to today’s project or mine

    Aug 22, 2011

  • AUSIMM
    Effects of Using Electronic Initiation Systems on Blast Improvement

    With the iron ore industry in Australia producing hundreds of millions of tonnes of ore per annum, the associated costs of these operations extend into the billions. It is no surprise in the current e

    Jan 1, 2009

  • AUSIMM
    A Black Canvas – Planning a Greenfield Coalmine in New South Wales

    By T W. C Stambolie

    Coalmines, like any other mine, generally involve the classic three-staged approach to mining studies; namely concept, pre-feasibility study (PFS) and feasibility studies (Cusworth, 2012). Subsequent

    Jun 28, 2016

  • AUSIMM
    Ventilation monitoring using fibre optics

    By G B. French

    Post a serious heating event underground, and at the direction of the State Mining Safety Authority, a mining company needed to demonstrate the use of cutting-edge technology to mitigate future events

    Oct 12, 2022

  • AUSIMM
    Digital geological mapping – pay-offs, pitfalls and pathways to successful mapping digitalisation

    By N Anderson

    The world-class Golden Mile gold deposit in the Eastern Goldfields of Western Australia is part of the Kalgoorlie Consolidated Gold Mines (KCGM) operation, which is wholly owned by Northern Star Resou

    Mar 22, 2022

  • AUSIMM
    Gold Mineralization at the Porgera Gold Mine, Papua New Guinea, in Response to Fluid Mixing

    By Heinrich CA, Wall VJ, Walshe JL

    The Porgera Gold Mine, located in the highlands of Papua New Guinea, has produced over 5 million ounces of Au, since its opening in late 1990. The deposit is located within Upper Cretaceous Papuan Pl

    Jan 1, 1995

  • AUSIMM
    Computer Simulations to Enable Continuous Blending to Two Plants at Sishen Mine From the Medium-Term Point of View

    Sishen uses a state-of-the-art tracking system to track material from its position in blast blocks through various stockpiles and crushers. Qualities are blended directly to the crusher as opposed to

    Jan 1, 2005

  • AUSIMM
    Mining through Sandfill Using Spiling Bars

    By D Carroll

    Mining of the zinc, lead and silver deposit at the Broken Hill Southern Operations site has been occurring for over 100 years. As a result of this, a significant amount of high-grade ore is now taken

    Nov 5, 2014

  • AUSIMM
    Analysis of Stability and Design of Face Support for Cross Passages – Waterview Connection Tunnels, Auckland, New?Zealand

    By M G. Wansbone, R Bhargava

    The inferred ground conditions for the proposed mined cross passages at the northern end of the Waterview Connection tunnels consist of an overburden of alluvial and residual soils, with mixed face ge

    Sep 17, 2014

  • AUSIMM
    Technology integration for tailings storage facility construction

    By A R. Hollis, M Heddon

    The safe life cycle of a Tailings Storage Facility (TSF) is founded on the fundamentals of proper design, construction, operation and closure. Leinster Nickel Operations (Leinster) utilises four activ

    Jul 1, 2021

  • AUSIMM
    Insights from evidence-based safety analyses

    By M Hassall

    There is a plethora of activities that have been, and continue to be, performed to improve the health, safety and well-being of workers involved in resource industry activities. These activities inclu

    Apr 16, 2024