Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    Remediation of Wall Failure at Kalgoorlie Consolidated Gold Mines’ Golden Pike Cut-back 2016

    By J Darbritz

    "This paper details the events leading up to a slope failure that occurred at Kalgoorlie Consolidated Gold Mines (KCGM) and the remediation method executed using rope access specialists.n January 2016

    Nov 15, 2016

  • AUSIMM
    The Preparation of Pastefill and its Use at Some Canadian Mines (6e4bc1a5-4335-470a-b421-2dd830dbe3e2)

    Two key elements in the design of a pastefill or high density hackfill system are the preparation of the backfill material and its distribution underground. This paper examines these two areas. Owin

    Jan 1, 1998

  • AUSIMM
    Specification and Selection of Hand-held Gas Monitors (Detectors) for Underground Mines

    By D J. Brake

    There are many sources of gas in underground mines including development and production blasting, strata gases, spontaneous combustion, diesel equipment, chemicals used for a wide range of functions,

    Aug 31, 2015

  • AUSIMM
    Accounting for Vegetation Dynamics in Landform Evolution Modelling

    By G R. Hancock, S Grant, T Whiteside, J B. C Lowry, J Boyden, T J. Coulthard

    Physically-based landform evolution models (LEM) provide a spatial framework to forecast the long-term geomorphic stability of post-mining landscapes. When used to test the relative stability of diffe

    Jun 28, 2016

  • AUSIMM
    Building Sustainability Into a Project

    Organisations are starting to develop processes for achieving sustainability principles they have defined for their organisation. The foundation for these principles is now well accepted. The definiti

    Jan 1, 2004

  • AUSIMM
    Tunnel Boring Machine Excavation Stability – Double Shield Tunnel Boring Machine Advance with Partially Grouted Annulus

    By M Norbert, P Mok

    The mainline running tunnels for Legacy Way comprise of two-lane tunnel boring machines (TBM) driven tunnels. The length of the TBM tunnel section is approximately 4.2 km. The TBMs employed are double

    Sep 17, 2014

  • AUSIMM
    Designing Flotation Circuits for High Fines Recovery

    By D C. Curry, M F. Young

    Many flotation operations need to improve liberation to increase recovery, yet often plant operators are concerned that finer grinding will produce æslimesÆ with low flotation recovery. Yet simple cir

    Jan 1, 2005

  • AUSIMM
    Risk-Cost-Benefit Analysis of Early Warning Technologies Impact for Wall Failure Risk Management in Surface Mines

    By J Joy, A Bye, G V. Kizil

    This paper presents an application of the newly developed risk-cost-benefit (RCB) framework to support risk management decisions for the selection of wall monitoring technologies at an open cut mine s

    Sep 18, 2012

  • AUSIMM
    The ABC of Mine to Mill and Metal Price Cycles

    By J Pease, P Cameron, D Drinkwater

    "In the 1990s metal prices were trending in a long-term decline and the usual cost-cutting exercises were adopted. Cuts to research and development made innovation difficult and the outlook was grim.

    Oct 10, 2016

  • AUSIMM
    Stope Blast Vibration Analysis at Dugald River Underground Mine

    By J Player, R de Vries, E Villaescusa, R Hassell

    Concerns regarding the uncertainty of stope dilution at MMG Dugald River Underground Mine led to a trial stoping program to acquire full-scale comprehensive geotechnical information and to test the va

    Aug 24, 2015

  • AUSIMM
    A practical simulation of an industrial rougher flotation circuit

    By Osborn G

    The bulk flotation behaviour of an industrial rougher bank has been determined with a view to characterising the size iepend ent behaviour of the identifiable nineral groups present. A relatively

    Jan 1, 1986

  • AUSIMM
    Eliminating Unidentified Misfires at Xstrata ZincÆs Open Pits Through the Application of Electronic Detonators

    By R Small, S Combrinck, R Lindsay

    Maintaining your competitive edge in the growing Australian mining sector today is an arduous task. With an ever increasing demand to extract more ore, safely, complete visibility throughout the blast

    Sep 18, 2012

  • AUSIMM
    Influence of Saline Water on Electrostatic/High Tension Separation

    By P Ramsaywok

    The use of saline water for mineral beneficiation in arid regions is general practice and also the case with Exxaro Namakwa Sands, situated on the west coast of South Africa. Although it is ‘cost effe

    Oct 5, 2011

  • AUSIMM
    Marine Recovery of Tunnel Boring Machine from Botany Bay

    By S Norman

    The Water Delivery Alliance (WDA) was established to design, construct and commission the pump station and desalinated water delivery pipeline to link the desalination plant on the Kurnell Peninsula (

    Mar 8, 2011

  • AUSIMM
    The Dugald River Zinc-Lead-Silver Deposit; An Example of a Tectonised Proterozoic Sratabound Sulphide Deposit

    By Allnutt S. L, Carswell J. T, Mutton A. J

    The Dugald River Zn-Pb-Ag deposit occurs within the complexly deformed and metamorphosed sediments of the Middle Proterozoic Cloncurry Terrane, Eastern Succession, Mount Isa Inlier. The sedimentary

    Jan 1, 1993

  • AUSIMM
    Can robots break the drill and blast bottleneck in underground roadway development in hard rock?

    By M Berner, N A. Sifferlinger, E Fimbinger

    Today, the advance rate of underground roadway development by drill and blast operation is limited by the need to ventilate the toxic blast fumes after each cycle. In deep mines this usually is only p

    Sep 1, 2024

  • AUSIMM
    The Technology of Management ù An Overview of Technological Advances in the Mining Industry

    The major technological advances of the last 30 years have profoundly reshaped mining practices. Machines keep getting bigger while productivity continues to increase and manning levels drop. These tr

    Jan 1, 2001

  • AUSIMM
    Improvement of the copper flash smelting furnace (FSF) and the slag cleaning furnace (SCF) process by advice-based control of silica and coke addition

    By A Specht, A Müller, V Montenegro, S Winkler, E Klaffenbach, A Schmidt

    In the process of primary copper smelting in flash smelting furnace (FSF), the ratio of iron to silica (Fe/SiO2 mass ratio) primarily determines the slag viscosity and magnetite formation. Viscous sla

    Aug 21, 2024

  • AUSIMM
    Transforming Mining - A Framework for Dramatic Changes in Performance

    The mining industry has been slow at adopting the latest management philosophies from other industry sectors, such as manufacturing, and in retrospect, with good cause. With the plethora of three-lett

    Jan 1, 1998

  • AUSIMM
    DeGrussa Copper Mine, Western Australia - Feasibility to First Production: A Case Study in Developing a Working Geometallurgy Model from First Principles

    By P Vass, C Butler, J Condon, B Hooper

    DeGrussa Copper Mine, resource status 10.2 Mt at 5.7 per cent Cu, 2.1 g/t Au (Sandfire Resources, 2013), commenced concentrate production through its 1.5 Mt/a conventional copper flotation processing

    Sep 29, 2013