A practical simulation of an industrial rougher flotation circuit

The Australasian Institute of Mining and Metallurgy
Osborn G
Organization:
The Australasian Institute of Mining and Metallurgy
Pages:
7
File Size:
512 KB
Publication Date:
Jan 1, 1986

Abstract

The bulk flotation behaviour of an industrial rougher bank has been determined with a view to characterising the size iepend ent behaviour of the identifiable nineral groups present. A relatively simple flotation model, based on first order kinetics and the assumption of perfect mixers in series ias been used to provide a fit to the operation of the cells. The adequacy of the model is discussed in relation to the characteristics of the ore and the size iependancy of the parameters. It is shown that improved fits are possible if the model accounts explicitly for this size dependancy and demonstrated how the model may be of use in prediction of the grade recovery relationships for different operating conditions as an aid to plant optimisation.
Citation

APA: Osborn G  (1986)  A practical simulation of an industrial rougher flotation circuit

MLA: Osborn G A practical simulation of an industrial rougher flotation circuit. The Australasian Institute of Mining and Metallurgy, 1986.

Export
Purchase this Article for $25.00

Create a Guest account to purchase this file
- or -
Log in to your existing Guest account