Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    Of Detritals, Derivatives and Determination ù An Example of Detrital Iron Discovery

    By P J. Hawke, M F. Flis

    The Hamersley Basin of Western Australia holds significant tonnages of detrital iron deposits. Formed by a cyclic weathering and eroding sequence of nominally barren banded iron formation, they may fo

    Jan 1, 2002

  • AUSIMM
    Dilution, Ore Grade and Blast Movement Calculation Model

    By I C. Carrasco, V G. Mirada, J F. D Domingo, F S. Leite

    This paper investigates ore loss and dilution produced by rock movement in bench blasting. A total of four blasts, in which electronic detonators have been used, were monitored in Cobre Las Cruces Ope

    Aug 24, 2015

  • AUSIMM
    The study of applying dry cobbing pre-concentration and its impact on concentrator efficiency and pit optimisation – Yogi BIF magnetite iron ore mine

    By M Saghaeian, V Sheikhzadeh, R Hejazi

    Mining dilution is one of the most important factors affecting the economy of mining projects. Instead of quantifying dilution in mining studies, it is common to assume a general dilution such as 5 pe

    Aug 24, 2022

  • AUSIMM
    The effect of vane shear rotation speed on the estimation of tailings undrained strength

    By B Wentzinger, Y Keulemans

    This paper presents the results of a field study designed to assess the impact of vane rotation speed on the estimated undrained strength for two Australian bauxite tailings storage facilities. The va

    Jul 1, 2021

  • AUSIMM
    State-of-the-art of electroslag refining and challenges in the control of ingot cleanness

    By G Stovpchenko, G Jianjun, L Medovar

    Electroslag remelting (ESR) today and into the future, will still be the main process for producing high-quality ingots by suppressing segregation, not just refining chemical composition from impuriti

    Jun 19, 2024

  • AUSIMM
    Isasmelt - A 250 000 TPA Copper Smelting Furnace

    MIM Holdings Limited (MIM) committed to a long-term future in copper in the Carpentaria Mineral Province in 1996 with the development of the Enterprise and Ernest Henry mines, and an upgrade of MIMsÆ

    Jan 1, 1998

  • AUSIMM
    Manganese ù From Waste to High-tech Material

    By M D. Urbani

    HiTec Energy Ltd has been conducting research since 1996 into novel process routes for the treatment of low-grade and waste manganese sources for the production of high value and high quality electrol

    Jan 1, 2004

  • AUSIMM
    Wallaby - The Horizontally Challenged Opportunity

    Barrick Gold Granny Smith Mine is currently undergoing conversion from an open cut operation to an underground mine at the Wallaby deposit. The underground project commenced in 2005 with the developme

    Jan 1, 2008

  • AUSIMM
    On the development of a viscosity model for molten multicomponent slag systems with several glass-forming, amphoteric and modifier oxides

    By G M. Zhomin, A S. Arkhipin, A Kondratiev

    Viscosity of multicomponent slags is one of the crucial physicochemical properties for many industrial processes and technologies. While the viscosity-temperature relationship of completely molten sla

    Aug 21, 2024

  • AUSIMM
    Performance of Different Constructive Solutions against Explosions in Full-scale Masonry Walls

    By M Chiquito, R Castedo, P Segarra, L M. López, J A. Sanchidrián, J Navarro

    The aim of this work is to assess the performance of different constructive solutions against explosions on the strength of masonry walls. The solutions tested, namely an external metal mesh, a glass

    Aug 24, 2015

  • AUSIMM
    Field Measurement of Transient Pore Pressures within Co-disposed Processing Rejects Placed in a Spoil Dump

    By R Van Laeren, G Langerak, S Fityus, K Koosmen

    Co-disposal of partly-dewatered mixed-plant rejects (MPR) from coal processing into spoil dumps is gaining favour amongst Australian coalmine operators in preference to conventional tailings disposal

    Jul 27, 2015

  • AUSIMM
    The Contribution of BHP BillitonÆs Ekati Diamond MineTM to Sustainable Development in CanadaÆs North

    By R Beaulieu, D Burlingame, C Hanks

    The Ekati Diamond MineÖ is CanadaÆs first diamond mine and is located 300 kilometres northeast of Yellowknife in the Northwest Territories. The development of the mine supports sustainable development

    Jan 1, 2002

  • AUSIMM
    The coalmine roof rating – an update in its calculation and mechanistically why it works

    By M Colwell

    The Coal Mine Roof Rating (CMRR) is a rock (roof) mass classification (RMC) system/index that was originally developed by the United States Bureau of Mines (USBM) for aspects of underground coalmine g

    Nov 29, 2022

  • AUSIMM
    Thermal Modelling and Mitigation Measures for the Bogong Power Development

    By D Wimpenny

    The Bogong Power Development Project in Victoria, Australia involved the construction of a 15 m long mass concrete plug up to 9 m in diameter within the head race tunnel. The plug is critical to thepe

    Mar 8, 2011

  • AUSIMM
    Closure Planning Lessons Learnt from the Century Mine

    By J Crosbie, M Lord, R Bitencourt, P Defferrard

    The MMG Century mine, which is the largest zinc/lead mine in Australia, began operating in 1999 and ceased mining from the open pit in July 2015, with processing completed in early 2016. Closure plans

    Jun 22, 2016

  • AUSIMM
    The Roy Hill Project

    By J M. F Clout

    The Roy Hill Project is an independent integrated port, rail and mine development in the Pilbara region of Western Australia. The bankable feasibility study for the project was completed in January 20

    Jul 11, 2011

  • AUSIMM
    Treatment and Rehabilitation of Acidic Waste Rock and Tailings – A 14-year Case Study

    By D Blair, T Scutts, L Fergusson

    This paper presents a waste rock treatment and rehabilitation program conducted at a metaliferous mine site in northern New South Wales from 2000–2013. It updates findings from 2005 for Program #1 (wh

    Jul 16, 2014

  • AUSIMM
    Application of Tracer Gas Flow Profiling to Improve Secondary Ventilation Practice – A Pilot Study

    By S Wilkinson, S Black, L van den Berg

    "The mine ventilation system plays an important role in mitigating human exposure to diesel particulate emissions (DPM), exhaust gases and heat in underground mines. The mine’s secondary ventilation s

    Aug 31, 2015

  • AUSIMM
    Seismic Hazard Assessment at Junction Gold Mine

    By M Henderson, M Hudyma

    Mining-induced seismicity at Junction Gold Mine became a serious operational problem in the late-1990s. Assessing the local seismic hazard is an important step in assessing the risk associated with po

    Jan 1, 2002

  • AUSIMM
    Case Study – Engineering Design for a Slurry Preparation Plant for a Paste Application in West Africa

    By G du Toit, P L. Gillot, M Swanepoel

    Randgold Resources’ Loulo-Gounkoto Complex is one of the largest gold mining operations in Mali, West Africa. The mine, which is situated on the western border with Senegal, treats more than 4 Mt/a of

    Sep 1, 2014