    A Design Approach For A Swelling Rock In An Underground Mine In Türkîye

    By A. G. Pasamehmetoglu

    The swelling process is an important problem causing damages to the structures in or on swelling rocks, both during construction and operating life. To understand swelling problem, a number of testing

    Jan 1, 1992

  • SME-ICGCM
    Case Studies Using Mine-Wide Monitoring Systems For Geotechnical Evaluations

    By John P. Dunford

    U.S. Bureau of Mines researchers are investigating the ability of mine-wide monitoring systems already in place at many coal operations to provide a direct link between geotechnical instruments and th

    Jan 1, 1993

  • SME-ICGCM
    Study on Top-Coal Loss and the Optimum Drawing Interval of Longwall Top-Coal Caving Mining

    By Qiang Fu

    ABSTRACT This paper aims to identify the main issues concerning top-coal loss and the optimum drawing interval of LTCC (Longwall Top-coal Caving) mining by underground tests and DEM (Distinct Element

    Jan 1, 2002

  • SME-ICGCM
    A Method For Establishing Site Specific Coal Pillar Design Guidelines

    By Winton J. Gale

    Coal mine pillar design formulae available to mine planners are typically based on relationships determined for specific site conditions. Application of these methods is difficult when other factors,

    Jan 1, 1992

  • SME-ICGCM
    Improvement in Pre-Tensioning of Strand Bolts in Australian Coal Mines

    By Mietek Rataj

    Installation of pre-tensioned Strand Bolts i.e. resin grouted cable bolts is very common now in Australian coal mines. A short historical development of this type of rock reinforcement is outlined Var

    Jan 1, 2002

  • SME-ICGCM
    Ground Control Problem Associated with Longwall Mining of Developed Pillars

    By T. N. Singh

    Board and pillar system of mining has beer, practised in India in view of abundant availability of cheap labour force, low investment and quick return. Subsequently, selective mining from thick seems

    Jan 1, 1984

  • SME-ICGCM
    An Underground Trial Of Cable Slings For Remedial Support Of Longwall Gateroads

    By William D. Gallant

    This paper describes a joint cooperative project between the CANMET Cape Breton Coal Research Laboratory and the Cape Breton Development Corporation to conduct a trial of split set cable slings for re

    Jan 1, 1990

  • SME-ICGCM
    A probabilistic approach to ground support design in underground mines,

    By Kevin Beauchamp

    In many cases traditional support designs cover the many variations in ground conditions and bolt performance by a conservative factor of safety. The result is that most bolts are ineffectual most of

    Jan 1, 2003

  • SME-ICGCM
    Introduction of a Measurement Based Ground Control Management System to a Deep Level Potash Mine

    By Alexandra Garcia

    A measurement-based ground control management system, commonly employed in coal mines, has been successfully implemented in a UK potash mine operating at a depth of over 800 m. This system includes th

    Jan 1, 2014

  • SME-ICGCM
    Tracking and Tracing in Terms of Transportation Logistics of Hard Coal Mines

    By Marcel0 Mondring

    Transportation and the logistic requirements are set very high for the German coal mining industry. Short transportation resources, crowded quarters, and long transportation distances to destinations

    Jan 1, 2014

  • SME-ICGCM
    Basic Procedures for Monitoring and Modeling Abandoned Underground Coal Mines for Safety Due to Uncontrolled Closures: Case Study of Verdinho Mine, Santa Catarina State, Brazil

    By Selmar A. Oliveira

    "Safe mine closure is an important step in the mining lifecycle. Plans for safe and efficient closure should begin at the inception of mining. Ideally, closure occurs when the reserve has been deplete

    Jan 1, 2017

  • SME-ICGCM
    Challenges in German Subsidence Research—Retrospectives and Perspectives

    By Denise Müller, Axel Preusse

    "Due to multilateral underground use, mining subsidence is discussed more and more with regard to issues other than mining, such as post-mining topics, storage, or geothermal use. These discussions an

    Jan 1, 2018

  • SME-ICGCM
    BHP Billiton Underground Ground Control Fatal Risk Control Protocol ? Development and Application

    By Dan Payne

    Roof falls and other ground control incidents make up a significant portion of fatal accidents in underground mines. BHP Billiton has undergone a review of all fatalities in their operations and divid

    Jan 1, 2006

  • SME-ICGCM
    A Method for Quantitative Void/Fracture Detection and Estimation of Rock Strength for Underground Mine Roof

    By Syd Peng

    In designing a proper roof support system, one must know the features of roof geology in advance of mining. The drilling parameters obtained during normal roof bolt installation cycle can provide a l

    Jan 1, 2005

  • SME-ICGCM
    Recent Advances in Numerical Simulation of Cutter Roof Failure in Underground Coal Mines

    By Murali Gadde

    Numerical simulation of cutter roof failure is a daunting coal mine excavation design issue. The complex progressive failure mechanisms associated with cutter failures are extremely difficult to repli

    Jan 1, 2005

  • SME-ICGCM
    Surface Subsidence Due to the Combined Effects of Underground Coal Mining and Groundwater Withdrawal

    By Shu Cheng

    Abstract: Based on the consolidation theory of soil dewatering and land subsidence prediction methods in soil mechanics, preliminary analysis of surface subsidence and movement due to groundwater with

    Jan 1, 2002

  • SME-ICGCM
    The Slope Stability Assessment in the Wall Overlooking the Sungun Copper Concentrator Plan

    By S. Mehrdad Heidari

    The concentrator plant is located near a very high (105m), large (- 500m) and steep (a, > 45' ) wall. Geologically, the wall was composed of very complicated formations and broad range of soils a

    Jan 1, 2005

  • SME-ICGCM
    Advanced Surveying Method For Measuring Roof Convergence

    By M. Zaki Rashad

    In this paper, if three slant distances are measured from three given points of known coordinates to an unknown point, the position of this point (X, Y, and Z coordinates) can be determined. A compute

    Jan 1, 1990

  • SME-ICGCM
    Tailgate Support Practice In U.S. Longwall Mines - A Survey

    By S. S. Peng

    To acquire knowledge on the general trend of primary and supplemental supports used in tailgates of US longwall mines a survey of 76 mines with 86 longwall panels was carried out in the summer of 1993

    Jan 1, 1994

  • SME-ICGCM
    Studies on Distribution Pattern of and Methane Migration Mechanism in the Mining-Induced Fracture Zones in Overburden Strata

    By Shugang Li

    The layout and efficiency of the degasification system is heavily dependent on the distribution of and the methane migrating mechanism in the mining induced fractures in the overburden strata In this

    Jan 1, 2005