Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • SME-ICGCM
    Assessment of Roadway and Yielding-pillar Performance During Retreat Longwall Extraction at a United Kingdom Deep Mine

    By Leigh Sharpe

    Dunng the last 5 years a United Kingdom colliery has utilised a yielding-pillar configuration to extract a relatively thick coal seam at a depth of 640 m. As part of ongoing research into the siting o

    Jan 1, 1998

  • SME-ICGCM
    Design Considerations for Tensioned Bolts

    By Yunqing Zhang

    The 3-D numerical modeling using ABAQUS is performed to analyze the mechanisms of the tensioned bolts by taking into considerations excavation sequence, pre-tension, bedding planes and in-situ horizon

    Jan 1, 2002

  • SME-ICGCM
    Development and Application of Impact-Resistant Lagging for Steel Sets Installed at Underground Roof Fall Areas

    By Kevin Jinrong Ma

    Underground mines often experience roof falls in entries, crosscuts, and intersections of active mining sections, main travel ways, and belt entries. Roof fall heights greater than 20 ft (6 m) make re

    Jan 1, 2011

  • SME-ICGCM
    Development and Implementation of the “Spin to Stall” Resin Bolting System at Anglo Americans Australian Underground Coal Operations

    By Ismet Canbulat, John Naylor, Jason Emery, Peter Craig, Andy Sykes

    "Longwall mining is by far the most common method of underground coal extraction in Australia. The industry trends and expectations are placing increasing emphasis on the reliability and productivity

    Jan 1, 2015

  • SME-ICGCM
    Australian Longwall Geomechanics - A Recent Study (52cb3b8b-6f2d-4969-ba9d-61fc0c2f72ec)

    By Russell C. Frith

    This paper presents recent findings concerning longwall caving mechanisms relating to Australian mining conditions and their effect upon longwall support requirements and behaviour. The findings arc b

    Jan 1, 1992

  • SME-ICGCM
    Strata Support Interaction On A Powered Support Longwall Face Under A Massive Dolerite Sill - A Study (d30e090b-e4dc-4c93-b107-3cdd31db016b)

    Design and selection of support systems for longwall faces call for in-depth knowledge of strata mechanics and in particular of strata-support interactions. The paper presents the results of field inv

    Jan 1, 1992

  • SME-ICGCM
    Case Study of the Effect of Stratigraphic Location on Roof Stability in Rock Salt

    By Chris T. Franke

    The Waste Isolation Pilot Plant is a deep underground facility mined in bedded salt interspersed with persistent clay inter- beds. The clay seams delineate beams of salt above and below the excavation

    Jan 1, 1997

  • SME-ICGCM
    Mining Under Rivers In Fuxin Coal Mines

    By Liang Yin-Huai

    In Fuxin Coal Mines, there are more than 20 million tons of coal buried under seasonal streams. The coal seams are mostly shallow. We have mined more then 50 mining blocks distributed in 5 coal mines.

    Jan 1, 1990

  • SME-ICGCM
    The Impact Of Three Longwall Coal Mines On Streamflow In The Appalachian Coalfield

    By Denise Y. Dizon

    The objectives of this study were to document the hydrologic impacts of longwall mining on streams, identify the factors affecting the extent of stream dewatering, and develop empirical trends to pred

    Jan 1, 1990

  • SME-ICGCM
    Overview of Safety Considerations with Highwall Mining Operations

    By George Gardner

    The rapid growth of highwall mining in the Appalachian coalfields has resulted in unique safety concerns. Due to the concentration of activity at the base of the highwall and the potentially destabili

    Jan 1, 2002

  • SME-ICGCM
    Mining Under Strong Roof

    By K. Y. Haramy

    Strong roof helps minimize roof fall problems in coal mine entries. However, the Inability of strong roof to cave readily may contribute to major ground control problems In Iongwall and retreat mining

    Jan 1, 1988

  • SME-ICGCM
    Utilizing The ?Advance And Relieve? Method To Reduce Horizontal Stress Affects On The Mine Roof, A Case Study (b5b945af-699f-46b0-ae56-a98434baad9f)

    By Dennis R. Dolinar

    A room and pillar coal operation in central Pennsylvania was experiencing roof cutters and long running roof falls caused by high horizontal stresses. The roof conditions created hazards for the miner

    Jan 1, 2000

  • SME-ICGCM
    Prediction Of Shearer Cutting Performance (2d8ef98a-f84a-4c60-8ac8-2edff3e8f14f)

    By D. L. Price

    This paper presents a method of measuring field power consumption of shearers and deriving specific energy consumption versus shearer haulage speed performance curves. A description of a computer prog

    Jan 1, 1992

  • SME-ICGCM
    Design And Experience Of Total Extraction Room And Pillar Operations Above Depleted Longwall Panels

    By Kenneth Rigsby

    Black Mountain Resources' Highlands Mine No. I is a full extraction room and pillar operation located in Harlan County, Kentucky. Black Mountain extracts the 0.9 to 1.1 meter (36- to 42-inch) thi

    Jan 1, 2003

  • SME-ICGCM
    Numerical Modeling of the U1A Complex at the Nevada Test Site: Model Development and Comparison of Different Drift Mining Options (9c46cc37-c6f9-43fc-b6b3-b63cc79f203c)

    By R. Karl Zipf

    Stress analysis programs such as MULSIM/NL, LAMODEL, MinSim 2000, and EXAMINE TAB are used in the mining industry to analyze stresses and displacements in coal mines, platinum mines, gold reefs, and t

    Jan 1, 2003

  • SME-ICGCM
    Eclipse System Bolting In The Illinois Basin

    By Alan Campoli

    Approximately 100 million fully grouted rebar roof bolts are installed each year in the United States, 80% are B-Series (5/8 inch fully grouted rebar in a one-inch borehole). The lesser used more expe

    Jan 1, 2004

  • SME-ICGCM
    Design Optimization of Longwall Chain Pillars

    By Behdeen Oraee, Amirhossein Bangian, Kazem Oraee

    "Determination of the optimum design of chain pillars has a significant effect on the economics and safety of longwall operations. Most pillar design formulae are based on empirical methods and supple

    Jan 1, 2010

  • SME-ICGCM
    Stability of a Gateroad Used Simultaneously for Two Retreating Longwall Faces

    By Stanislaw Prusek

    In this paper, results of underground measurements conducted in gateroad 3, seam 615, at the Bobrek-Centrum Colliery are presented. The Bobrek-Centrum Colliery is owned by Kompania Weglowa, the larges

    Jan 1, 2014

  • SME-ICGCM
    Entry Design For Optimum Stability In A Multi-Seam Environment

    By Mohummad Akram

    Statistical analysis of multi-seam mining case studies demonstrated that geologic structure and lithological type and sequencing were predominant factors in entry failures. Finite element analysis was

    Jan 1, 1993

  • SME-ICGCM
    Estimating Coal Strength Based on Historical Laboratory Tests and Geomechanics Classification

    By Andre Zingano

    The coal seam strength and the failure criteria that represent the behavior of the coal seam are very important for mine section and pillar design. Additionally, mine section and pillar design take in

    Jan 1, 2014