Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • SME-ICGCM
    Horizontal Stress and Coal Mines: Twenty-Five Years of Experience and Perspective

    By G. J. Hasenfus

    Although theoretical and conceptual knowledge regarding the impact of horizontal stress on underground coal mining excavations have existed since at least the mid-1900s, it wasn?t until the late 1970?

    Jan 1, 2006

  • SME-ICGCM
    Cable Bolting - Potential Applications For Variable Strata Conditions

    By David Allen

    Cable bolting is a relatively new strata reinforcement technique that has been used successfully in Australia and the United Kingdom. Jim Walter Resources, Inc. has examined the principles and can vis

    Jan 1, 1994

  • SME-ICGCM
    Design And Backfill Installation Considerations For Cut-And-Cover Coal Mine Slope Entry Using Steel Supports And Lagging (5aeac579-3675-40a9-b37e-6b4c5af947be)

    By Larry DeGraff

    With the increase of new mine development in the past several years, many coal mines have decided to self- perform the design and construction for their slope development projects. The development pr

    Jan 1, 2009

  • SME-ICGCM
    Bi-Directional Shield Recovery in a Wide Face Longwall Move with a Pre-Driven Recovery Room under Weak Roof Conditions

    By Peter Zhang

    Shield recovery in a longwall move is normally conducted from tailgate to headgate. However, if the face is wide and the immediate roof is weak, difficult conditions with considerable roof sag, excess

    Jan 1, 2007

  • SME-ICGCM
    Longwall Recovery At Bailey Mine - Ground Control Challenges And Solutions (963204bd-df7d-40f3-9bd2-496636477d24)

    By Daniel Su

    This paper describes recent ground control challenges encountered at the longwall recovery areas of one of Bailey Mine?s two longwall faces and the proactive measures taken by CONSOL management and en

    Jan 1, 2009

  • SME-ICGCM
    CISPM-MS: A Tool to Predict Surface Subsidence and to Study Interactions Associated with Multi?Seam Mining Operations

    By Yi Luo

    Multiple-seam mining operations induce surface subsidence basins different from those caused by mining in a single coal seam, and also disturb the mining operations in the other coal seams. A computer

    Jan 1, 2012

  • SME-ICGCM
    Development of a mechanistic model for prediction of maximum subsidence and subsidence profile due to longwall mining

    By Richard D. Begley

    This paper summarizes the development of a mechanistic model to predict longwall mining induced surface subsidence. The model was originally developed from data acquired from a recent field study cond

    Jan 1, 1989

  • SME-ICGCM
    Global Trends in Coal Mine Horizontal Stress Measurements

    By Christopher Mark

    Knowledge of in situ stresses is fundamental to many studies in earth sciences, and coal mine ground control is no exception. During the past 20 years, it has become clear that horizontal stress is

    Jan 1, 2008

  • SME-ICGCM
    Relocating Mining?Induced Seismicity at the Trail Mountain Mine

    By Meagan S. Boltz

    From October 2000 to April 2001 a local array of fourteen seismograph stations was deployed at the Trail Mountain Mine (TMM), an underground coal mine in Emery County, Utah, to locate mining-induced s

    Jan 1, 2012

  • SME-ICGCM
    Pillar Design Issues For Underground Stone Mines (5c6602ba-4b85-4ec3-ad15-c1c321c1afcd)

    By A. T. Iannacchione

    Underground stone mining represents an emerging sector for the U.S. mining industry. As this expansion takes mines under deeper cover and as more efficient mining methods are utilized, adequate stone

    Jan 1, 1999

  • SME-ICGCM
    Mine Pillar Stability Analysis Using Fem Methods - Two Case Studies

    By David H. Tang

    Massive pillar failures were observed at two underground coal mines. The results of stability analysis using traditional pillar design formulae did not agree with the underground observations. Finite

    Jan 1, 1990

  • SME-ICGCM
    Subsidence monitoring at a shallow partial extraction room-and-pillar mine in midwestem United State

    By Yoginder P. Chugh

    Subsidence may be observed above partial extraction shallow room-and-pillar mines where the coal seam(s) is associated with weak and thick claystone in the floor. This paper presents results of subsid

    Jan 1, 1989

  • SME-ICGCM
    Evaluation of a Multiple Seam Interaction Coal Pillar Bump

    By Michael Gauna

    An evaluation and analysis of a coal pillar bump in a West Virginia mine indicated that the pillar bump occurred because of the unique combination of controlling factors. The pillar?s development sta

    Jan 1, 2008

  • SME-ICGCM
    Subsidence Prediction for Multiple Seam Extraction under Consideration of Time Effects by the use of Geomechanical Numerical Models

    By Jurgen te Kook

    State-of-the-art for subsidence calculation are stochastical models. Although these models were successfully used all over the world they have their limitations due to the fact that they are not based

    Jan 1, 2008

  • SME-ICGCM
    Comparative Study Of Western US Longwall Panel Entry Systems

    By Khamis Y. Haramy

    This paper summarizes ground control studies of longwall panel entry systems in two Western U.S. coal mines. Presented are comparisons of in situ pressure change measurements and assessments of chain

    Jan 1, 1989

  • SME-ICGCM
    Applications of Microseismic Monitoring in China?s Underground Coal Mines

    By Xiangxi Wu

    Longwall and continuous mining are prevalent methods employed by Chinese underground coal operations. The main ground control challenges include roof skin deformation, roof collapse, and outbursts of

    Jan 1, 2012

  • SME-ICGCM
    Towards a Real Time Response to Changing Strata Conditions on a Longwall

    By P. Trueman

    A project is underway to convert a validated methodology to a system that will permit the near real time interpretation of loading data from longwall powered supports, allowing rapid adaptation of min

    Jan 1, 2006

  • SME-ICGCM
    Recent Trends of Coal and Gas Outburst Accidents in China

    By Ming Ju Liu

    China has been suffering from the most serious coal and gas outburst accidents. The situation has become worse than ever with the mining of deeper coal seams at higher production rates in a more compl

    Jan 1, 2008

  • SME-ICGCM
    New Era in Longwall Top Coal Caving Geomechanics

    By Abouzar Vakili

    Longwall Top Coal Caving (LTCC), as the most attractive method for thick coal seams, has been suffering from insufficient geomechanical understanding for the past few years. Cavability without doubt

    Jan 1, 2007

  • SME-ICGCM
    Load Capacity and Stiffness Characteristics of Screen Materials Used for Surface Control in Underground Coal Mines (10e0c7b9-c7f2-4fd8-a923-cd572692ebf6)

    By Dennis R. Dolinar

    Screen material in the form of welded wire mesh and geogrids are used in underground coal mines to prevent the fall of small pieces of rock from the roof between roof bolts. Further, if the screen is

    Jan 1, 2006