Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
Shaft Holing Project at Bulyanhulu Gold Mine, Tanzania
By W. De Graaf, C. Mkumbo
Bulyanhulu Gold Mine Limited (BGML) commissioned a project of sinking a Bulk Air Cooling Shaft during its programme to improve the ventilation system on the mine. As part of this project, a ventilatio
Jan 1, 2011
-
Prediction of Fines in Mining and Quarrying Applications Using the Fracture Density Model (FDM)
By C. Mick Lownds, Dale S. Preece, Ali Bhuiyan
FDM (Fracture Density Model) is a three-dimensional mechanistic model of blast induced rock fragmentation. FDM uses several computational mechanics algorithms to simulate the effect of blasting in dif
Feb 6, 2023
-
Electronic Initiation System in Fosterville Gold Mine Development
By C. Zuniga, S. Combrinck, C. Peters
Agnico Eagle Gold have partnered with Enaex Australia at their Fosterville gold mine to leverage a combination of drill and blast technologies to optimise underground development mining. The mine is t
Feb 6, 2023
-
Experimental Investigation into the TNT Equivalency of Electric, Non-Electric and Electronic Detonators
By Emily Johnson, Catherine Johnson, Ben Sonpon, Kelly Williams
The effect of length to diameter of the detonator is compared using Ansys/Autodyn 2-D simulations, the results of which are validated experimentally. It was found that higher pressure comes with a lar
Feb 1, 2020
-
Baseline Corrections for Mining Blast Vibrations
By Jhon J. Silva Castro
Blast vibration records used in mining contain unwanted information in the form of noise due to long-period drifts, background noise, and noise due to the conversion of the analogue signal to a digita
Jan 1, 2015
-
Instrumentation of a Structure for comparison of regulations worldwide - Vibration Monitoring Standards Connected to the use of Explosives in Different Countries, Part II
By Thierry Bernhard, Johan Finsteen, Charles Dowding, Mathias Jern
To bring some clarity to how different standards relate to each other a project was initiated within the European Federation of Explosives Engineers (EFEE). The first part of the project was a literat
Feb 1, 2020
-
Relative Shock And Heave – Underwater, Rock And Thermodynamic Irreversibility
By Michael Wieland
The work principle from thermodynamics is used to model the shock and heave for explosives shot in rock or under water, with the latter compared to reported results. The work principle utilizes restri
Jan 1, 2007
-
A Case Study - Interpretation of Fragmentation Analysis Results to Improve Blast Performance and Realize Significant Cost Savings
By Charles Clark, Mark Mukhija, Jaime Klein
Comminution – the reduction in size of solid materials – is the most energy intensive component of the mining process (Bauer, 2015). It is estimated that comminution consumes around three percent of a
Jan 1, 2018
-
Impact of the Mine to Plant Methodology on the Global Profitability of the Mining Industry
By Ronald Ticona
Generally, the drilling and blasting operation are managed independently to the processing plant outcomes. Therefore, the technical segmentation to determinate the ore drill and blast designs do not i
Feb 6, 2023
-
Anfo Truck Burn Trials
By E. Contestabile, B. von Rosen
Recently, the Canadian Explosives Research Laboratory (CERL) completed its investigation of a truck accident, which involved 18,000 kg of commercial explosives, 13,000 kg of which was ANFO. Over the t
Jan 1, 2004
-
History and Development of Packaged Explosives Progressing from Nobel's Inventions to the Recent Introduction of Emulsions
By Robert B. Hopler
"The story of packaged explosives begins with the use of black powder (also called gunpowder) in mining. Although discovered in the 13th century, it was not until 1627 that the first records of use in
Jan 1, 1991
-
Gradation Control Using Low Density Bulk Emulsion
By Adam T. Young
This paper will describe the process of using low density bulk emulsion as a means to maximize the production of an oversize or “rip rap” aggregate size range (8 inch to 72 inch) that the quarry custo
Jan 1, 2017
-
Floor Blasting for Establishment of a New Crusher in Underground Limestone Mine
By Chris Searing
An underground room-and-pillar limestone mine in Western Missouri acquired a new primary crusher, physically larger in every dimension than the unit it replaced. Due to the space constraints within th
Feb 6, 2023
-
Dilution and Ore-Loss Optimization in Underground Mines
By Sami Kara, Marsel Nabium
This paper provides an overview of the solution applied in underground Silver mine in Russia. The paper reviews the dilution problem throughout the entire mining process, and provides a rational appro
Feb 1, 2020
-
Dilution and Ore-Loss Optimization in Underground Mines
By Sami Kara, Marsel Nabium
As a mining project is developed from conceptual to production phases, there exists a variety of uncertainties and difficulties that affect the operation’s designs and economic values. A notable desig
-
Improvement of Safety Practices for Loading of ANFO-based Explosives in Zones with Reactive Rocks in Chile
By María Virginia Ramírez, Alejandro Alarcón, Alea Reyes
Reactive grounds (presence of FeS2, CuFeS2) can create hazards in a mine; misfires to premature deflagration or detonation of loaded blast holes. This occurs because some minerals can react to ANFObas
Jan 1, 2018
-
Numerical Simulation of FRP Strengthened Reinforced Concrete Slabs under Blast Loads
By M. K. Ameen, R. El-Hacha
This paper presents the analytical results obtained from numerical simulation of reinforced concrete slabs strengthened with various FRP systems and subjected to blast loading. A three-dimensional fin
Jan 1, 2010
-
Rock Specific Breakage Energy Functions Derived from Lab Scale Blast Experiments
By Peter Moser, Andreas Grasedieck
In modern rock blasting it is becoming more and more important to achieve a certain specified fragmentation. This means that the rock particles formed as a result of the blast should conform to a desi
Jan 1, 2004
-
A Kinematic Approach for Blast Modeling
By Ruilin Yang
Kinematic approach of blast modeling refers to using the velocity, strain, or displacement as controlling parameters to model blasting, rather than the stress and the material constitutive relations.
Feb 1, 2020
-
High Profile Project in Historic Affluent Nashville Neighborhood Poses Challenges
By Brent Coleman, Wade Hutchison
The Montgomery Bell Academy project is a parking garage structure topped by a soccer field. This project included expanding parking and moving the present tennis courts. The project is located adjacen
Jan 1, 2012