Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • ISEE
    Responsible Blasting: Strategies for Community Impact Mitigation

    By César Ugaz, Jorge Cardenas

    Mitigating the vibrations resulting from a blasting rocks is one of the most common challenges that Peruvian mining has, since if this impact is not mitigated it can generate discomfort and altercatio

    Jan 26, 2026

  • ISEE
    Blasting Next to an Unsupported Road using Electronic Detonators

    By Tony Rorke, Sydney Thabethe

    A large overburden blast was carried out at Douglas Colliery, Middelburg Mine Services, close to a national road in South Africa. The road is a busy route between Witbank and Bethal and damage to the

    Jan 1, 2004

  • ISEE
    The Statistical Analysis of Site-Specific Blasting Data Using Prediction Intervals and Tolerance Intervals

    By Perry Sisk

    In order to protect nearby structures during a blasting project, a peak particle velocity limit is often stipulated by a government agency or the owner of a particular structure. At the start of a bla

    Jan 1, 2013

  • ISEE
    Anti - Bomb Remote Controlled Inspection Robot

    By G. Geremia, M. I. Serrano, L. Costa, Strohaecker

    The advances in electronics and the development of more efficient algorithms, allow for the designing of more complex and sophisticated automated systems. The new devices include lighter, faster, reli

    Jan 1, 2010

  • ISEE
    Using An Anfo/coal Blended Blasting Mixture For Commercial Blasting Applications

    By Dennis Wilzbacher, John Wiegand

    In an effort to reduce the cost of bulk explosives, Vigo Coal Company found that the addition of coal mined at their Friendsville Mine, not only reduced explosive costs, but also appeared to actually

    Jan 1, 2007

  • ISEE
    How to Achieve 100% of Advance in Tunnel

    By Alan Diaz Butron, Eng. Thierry Bernard

    "In tunnel blasting the most challenging objective is definitively obtaining the maximum advanceassociated to a minimum overbreak. Achieving 100% of advance with no overbreak is the targetchallenge by

    Jan 1, 2017

  • ISEE
    Journal: 16th Annual Photo and Art Contest / Best of Show Power Line Pass Kemano, British Columbia, Canada

    By Corry Goumans

    Description of Project: Drilling, Blasting and Installation of Catenary Cables. Project Owner: Rio Tinto Alcan

    Jan 1, 2010

  • ISEE
    Case Study: Blasting with Air Decks to Maintain Performance While Saving Costs

    By Brian Lewis, Reinhold Daykin Schnell

    Blasting is the primary and most effective method for breaking and moving material at most mine sites. The blast design is often adjusted in efforts to optimize the effectiveness of the blasts’ explos

    Feb 6, 2023

  • ISEE
    Mining Cost Optimization Strategy Based on Adaptive Blast Design

    By Huang Daguang, Paulo Couceiro, Juan Navarro

    Mining is typically conducted through a set of interdependent unit-operations, which commonly include drilling, blasting, digging and hauling, in order to deliver the required ore material into the co

    Feb 6, 2023

  • ISEE
    Occidental's Resorts 7 and 8 Blasting Design and Results

    By Thomas E. Ricketts

    Occidental Oil Shale, Inc. constructed two commercial-sized modified in situ (MIS) retorts, Retorts 7 and 8, at its Logan Wash Oil Shale Mine in February and April 1981, respectively. One of the prima

    Jan 1, 1984

  • ISEE
    Journal: Summary of Amendments of ADR concerning the Transport of Explosive Materials in the EU

    By Rolf Schillinger

    Transport of Small Quantities of Explosives Material on Public Roads The transport of dangerous goods on public roads is extensively regulated by EU and national law. The transport of explosive materi

    Jan 1, 2010

  • ISEE
    Reducing Coal Damage And Loss With A New Blasting Technology

    By Tapan Goswami, Lloyd Hain, Geoff Brent

    For many years Ramp 24 at Ensham mine in Queensland, Australia has suffered substantial coal loss and damage due to the fragile nature of the coal and problematic geological conditions, which have pro

    Jan 1, 2008

  • ISEE
    Transforming Underground Blasting Operations into Primary Crushing Operations

    By Christopher Jon Preston, Troy Williams, Daniel Roy

    There has been significant progress made with narrow vein gold mines in which a second option for crushing has begun to attract attention. To ensure the profitability of a mine that has based its econ

    Jan 1, 2019

  • ISEE
    The Effect of Selected Blasting Parameters on the Detonation Velocity of Bulk Emulsion Explosives

    By Piotr Mertuszka

    Many years of research on more effective and safer explosives have led to the development of emulsion explosives. They are the second most commonly used group of explosives worldwide, primarily becaus

    Jan 26, 2026

  • ISEE
    Management's Effect on Drilling and Blasting

    By Alan R. Gadberry

    To resolve drilling and blasting problems, rather than treating symptoms and allowing problems to grow, the mine operator needs to change the way he operates. When a mine operator discovers a drilling

    Jan 1, 1985

  • ISEE
    Introducing Wireless Initiation Systems in Brazilian Mines Through Sales with Purpose

    By Anderson Meireles, Vladimir Carrasco, Carlos Feliciano

    Adopting new technology in drill and blast requires a structured implementation process, as it represents a significant change in a traditionally conservative industry. It involves addressing initiall

    Jan 21, 2025

  • ISEE
    Reactive Ground Learnings and Prevention

    By R. Jacob

    Mining has been around for a long time, and new deposits are being discovered continually but are becoming more complex for processing and typically sulfide in nature. Most of the large easy deposits

    Feb 6, 2023

  • ISEE
    Summer Internship Project at an Underground Gold Mine

    By Tristan Worsey

    This work was performed during the summer of 2008 during the junior year of a BS in Mining Engineering. It was observed that the mine was having a problem with back break during the blasting of develo

    Jan 1, 2010

  • ISEE
    Rock Slope Remediation on the Pennsylvania Turnpike

    By Ron Woolf, Corry Goumans

    With increasing traffic volumes experienced thro u g hout North America, a common goal for Highway officials is to keep traffic flowing as much as possible and to keep disruptions to the flow to a min

    Jan 1, 2003

  • ISEE
    New Methodology for Calculating Dynamic Pressure

    By Jorge Cárdenas, José Luis Hurtado

    The critical distance determination test through direct recording for the mine in Phase 03 was carried out in January 2024, and in it the vibration and pressure models were obtained for the Sedimentar

    Jan 21, 2025