Installation Of Augerpiles In Low Headroom And Restricted Access Conditions
By Jim Steding
L.G. Barcus and Sons, Inc. recently completed a three-phase project for the expansion of Presbyterian Hospital in Albuquerque, New Mexico for McCarthy Construction Co., the Construction Manager for th
Jan 1, 2003
-
Design and Installation of Gudrun Platform Jacket Piles
By Gunhild Hennum, Tewodros Tefera, Gisle Håland, Annette Jahr
"Abstract The Gudrun field is located west of Stavanger in the North Sea at water depth of 109 m. A jacket substructure was selected to support the topside and was installed in 2011. The jacket shall
Jan 1, 2014
-
Effective Dewatering Is More Than A Pump In The Hole - A Presentation At The Deep Foundations Institute Annual Meeting St. Louis, Missouri, November 1980
By William J. Rothschild
Ground water at construction sites can be controlled by properly placed wellpoint dewatering systems. Care must be taken in planning cofferdams to have adequate space for and access to pumps, headers
Jan 1, 1984
-
Capacity Of Large Diameter Bored Piles Determind By Stress-Wave Theory ? Synopsis
By S. X. Liang
In China, the bearing capacity predictions of the pile with Stress-Wave Theory have been developed rapidly in recent years. This paper recommended a DZH-3 Pile Driving Analyzer and its relevant comput
Jan 1, 2010
-
Non-Destructive Testing, Evaluation And Optimization Of Existing Deep Foundations For Re-Use Along The East Coast
By Matthew E. Meyer
Renovation, rehabilitation, restoration and expansion of existing residential, retail, commercial, hospital facilities and historic structures requires assessment and evaluation of foundation systems
Jan 1, 2011
-
Dynamic Testing For Bored Pile Bearing Capacity - Summary
By Jörn M. Seitz
Dynamic load testing is employed with ever increasing frequency to estimate the strength and elastic settlement behavior of piles of all types. For dynamic loading ram masses up to 20 Mg have been use
Jan 1, 1987
-
Ground Improvement By Cement Grouting Combines With Pipe Piles In Bridge Construction - Summary
By Peter White
A bridge reconstruction project involved driving pipe piles for the new foundations. Disturbances within soil layers at depth caused sinkholes to open up within the construction site. After a near fat
Jan 1, 1997
-
The Dutch Cone Penetration Test And Its Use In Determining The Pile Bearing Capacity
By C. Van der Veen
The use of the quasi static (Dutch) Cone Penetration Test (CPT) is described as a tool to predetermine the ultimate bearing capacity of the pile point. An analysis is given why a purely theoritical ap
Jan 1, 1989
-
Vertical Earth Reinforcement Technique - Test Wall 1998 DFI Annual Conference And Meeting
By Peter J. Nicholson
A new method of constructing retaining walls, in-situ, prior to excavation has been developed. This "Vertical Earth Reinforcement Technique" VERT, has been demonstrated at a full scale test wall at th
Jan 1, 1998
-
Deep Soil Mixing for Contaminated Soil Remediation at a Superfund Site
By Larry Stearns, Lori Tiefenthaler
Remediation of contaminated soil represents a significant market for application of Deep Soil Mixing (DSM). Eighty-one percent of U.S. Environmental Protection Agency (EPA) Superfund Program’s site re
Jan 1, 2018
-
Different Drilling Techniques in Challenging Geology at Seminole Hard Rock Hotel and Casino
By Michael Arnold, Jonathan Delgado
In 2017, Bauer Foundation Corp. (BFC) was awarded the contract to install the deep foundations for the new 17-story Hotel Tower and the Low Rise Casino Expansion at the Seminole Hard Rock Hotel and Ca
Jan 1, 2018
-
Advances in Stress-Wave Nondestructive Testing Methods for Evaluation of Deep Foundations
By Joseph T. Coe, Siavash Mahvelati, Alireza Kordjazi
This paper introduces recent advances in stress-wave NDT systems for use in assessments of in-service foundation integrity and drilled shaft construction. The primary results of the laboratory experim
Jan 1, 2018
-
Foundations For Light Buildings On Lime/Cement (L/C) Columns ? Summary
By Per Eriksson
For light buildings on clay, foundations on L/C-columns is in many cases a competitive alternative to piles when the thickness of the clay is moderate (<20 m). The method is applicable for the above m
Jan 1, 2000
-
Ultimate Skin Friction Of Single Batter Piles In Sand ? Synopsis
By A. M. Hanna
This paper presents the experimental investigation on the ultimate skin friction of batter piles. The model piles were pushed in medium dense sand deposits at different inclinations up to 30 with resp
Jan 1, 2010
-
CPT - Guided Installation Of Pressure-Grouted Displacement Piles
By Mark M. Petersen
As part of the addition of eight new combined cycle generating units at the Florida Power & Light Sanford Plant, 2,129 piles were to be installed. The existing plant elements were supported on driven
Jan 1, 2002
-
A Review Of Typical Foundations Used In The City Of Cleveland, OH
By David V. Lewin
Heavy structures in central Cleveland, Ohio, are supported on raft foundations, driven piles, or caissons. Settlements can be predicted and structures are designed to accommodate such settlements. On
Jan 1, 1985
-
Open Well Caissons Of A 1917 Railroad Bridge: How 19th Century Construction Can Influence 21st Century Construction (f1b0a5f2-b1b8-41d4-bbfb-fab6f395e7a0)
By Alan D. Fisher
Amtrak made a decision to replace an aging bascule bridge with a vertical lift bridge for their crossing of the Thames River in New London, Connecticut. The new lift bridge occupies the same alignmen
Jan 1, 2008
-
Pile Monitoring, Testing, And Data Processing: New Developments And Remaining Issues
By Alain E. Holeyman
After scoping out the objectives of this general report, the report reviews the three assigned main themes addressed by the papers submitted to the session: pile monitoring, testing, and data processi
Jan 1, 2006
-
Pile Installation Overcomes Numerous Problems At Rocket Motor Component Manufacturing Facility - Introduction
By Jon H. Gould
This paper describes the following at the new Advanced Solid Rocket Motor (ASRM) nozzle manufacturing facility, which is being constructed inside an existing manufacturing facility: 1) generalized sub
Jan 1, 1992
-
Underpinning The Existing No. 1 Subway Line At The World Trade Center
By Richard Crockford
The World Trade Center (WTC) is located on the west side of Manhattan in New York City, approximately 0.5 miles north of Wall Street, and is owned and operated by the Port Authority of New York and Ne
Jan 1, 2008