Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • DFI
    Dynamic Load Testing Of Augered Cast-In-Place Piles (Rausche)

    By Frank Rausche

    The more widespread use of Augered Cast-in-Place (ACIP) Piles has generated increased demand for improved quality control measures. These deep foundation elements are often relatively long and slender

    Jan 1, 2001

  • DFI
    Toe Protection For H-Piles On Sloping Bedrock At Rainy River - Summary

    By Jon E. Bischoff

    Construction of a secondary clarifier on the banks of Rainy River, Northern Minnesota, required the driving of H-piles 14HP102 to a sloping, very strong bedrock through thick deposits of soft and medi

    Jan 1, 1993

  • DFI
    Session 19 "Compensation Grouting"

    By Douglas Heenan

    The fracture orientations were inferred based on theory and previous experience. The fracture pattern was not monitored during the project. Grout volume was recorded at each sleeve port and real time

    Feb 10, 2003

  • DFI
    Tension Testing of the Grouted Anchorage Assembly for Multistrand Anchors

    By Lucian L. Bogdan

    "SummaryActive loaded strand anchors are often used for slope stabilization, retaining walls or tiedown anchors. Normally, strands are tensioned against the structure and wedges are locked inside the

    Jan 1, 2005

  • DFI
    Construction of Jacking Pits in Boston’s Central Artery/Tunnel Project

    By Arturo Ressi di Cervia

    "The Construction of the Thrust Pits for Jacking of the I-90 Tunnel for the Central Artery/Tunnel Project (Part of Contract No. C09A4) in Boston MA was nominated for DFI’s 2002 Outstanding Project Awa

    Jan 3, 2003

  • DFI
    DFI Model Piledriving Contractor Proposal

    With respect to liability damages, claims and costs thereof relating to or ansmg out of contamination, special or non-special wastes, hazardous wastes or pollution in connection with the performance o

  • DFI
    New Pile for Reduced Underwater Noise

    By Dardis J. T. II, P. G. Reinhall

    "Impact pile driving of steel piles in marine environments produces extremely high sound levels in the water. It has been shown that current pile driving noise attenuation techniques provide limited n

    Jan 1, 2017

  • DFI
    High Capacity Drilled Piles in Brooklyn

    By Ahmed Elmekati, Frederick C. Rhyner, Steven R. Lowe

    "The current phase of the Pacific Park development (formerly, Atlantic Yards) in Brooklyn involves constructing buildings on a platform over an existing LIRR rail yard. To preserve the maximum amount

    Jan 1, 2016

  • DFI
    Design Of An Unbraced Elliptical Slurry Wall Cofferdam For Deep Pump Station Construction

    By Gordon Chen

    As part of a value engineering envisioned by East Coast Slurry, Weidlinger Associates, Inc. designed a unique elliptical slurry wall cofferdam for construction of the 65 ft. deep MWRA North Dorchester

    Jan 1, 2010

  • DFI
    Diplomacy And Innovation: Octakong And The Hong Kong-Zhuhai-Macau Bridge Project

    By David White

    When finished (projected completion in 2016) the Hong Kong-Zhuhai-Macau Bridge Project will comprise three cable-stayed span bridges and a 4.15 mile immersed tube tunnel - linking Hong Kong to Macau a

  • DFI
    Diplomacy and Innovation: Octakong and the Hong Kong-Zhuhai-Macau Bridge Project

    By David White

    "When finished (projected completion in 2016) the Hong Kong-Zhuhai-Macau Bridge Project will comprise three cable-stayed span bridges and a 4.15 mile immersed tube tunnel - linking Hong Kong to Macau

    Jan 1, 2017

  • DFI
    Seismic Design Of Micropile Foundation Systems

    By Leo Panian

    Over the last decade, drilled and post-grouted micropile foundations have come to be increasingly relied upon for resisting seismic loads in building foundations on the West Coast. Micropiles have bee

    Jan 1, 2010

  • DFI
    Seismic Rehabilitation Of Seattle's Pier 69

    By David Pierce

    The Port of Seattle, one of the largest on the west coast of North America, made a strong statement regarding their support for reusing existing structures when a decision was made to rehabilitate Pie

    Jan 1, 1992

  • DFI
    Risks Associated With Finite Element Modelling Of Cut And Cover Structures

    By Tony Suckling

    The commercially available finite element program Plaxis has a key benefit over other finite element analysis programs in that it has a relatively simple user interface to input and output data. This

    Jan 1, 2010

  • DFI
    Session 22 "Compaction Grouting and Limited Mobility Grouting"

    By Allen Cadden

    The type of soil we had was a silty fine sand. It had been placed by hydraulic methods in 1904 so it was quite clean I would say less than 10% silt the rest of it was very loose sand. That I'm n

    Feb 10, 2003

  • DFI
    A New Low-Cost Bi-Directional Load Test Technique for Drilled Shafts

    By Sherif Elfass, Gary Norris

    Bi-directional load testing of drilled shafts has been widely adopted as a means to evaluate their load carrying capacity. However, in order to reach failure, most of these tests are carried out on s

    Sep 8, 2021

  • DFI
    S21-Berlin – Design And Underwater Construction Of A Covered Contrustion Pit Without Direct Accessibility From Above

    By Grischa Dette, Thomas Schröder, Holger Merski

    For the construction of the tunnel for the new Berlin S21 light rail line, a construction pit had to be built below the crossing B 96 federal road. For this purpose, the construction pit M’ has been b

    May 1, 2022

  • DFI
    Top-Down Methods Utilizing Secant Walls at 110 N. Carpenter: Design And Construction

    By David R. Sutfin, Joseph Lodde

    110 N. Carpenter is new commercial building located in the West Loop neighborhood of Chicago, Illinois. The new home to the McDonalds Corporation work headquarters, accelerated project delivery method

    Jan 1, 2019

  • DFI
    New Ground Freeze Method for Groundwater Cutoff below Foundation Excavations in Permeable Soils

    By Daniel W. Mageau, Larry W. Applegate, Aaron K. McCain

    "An innovative method of ground freezing was successfully tested to create a “dry” excavation condition for a new building foundation at a site in downtown, Miami, Florida. The subsurface conditions i

    Jan 1, 2015

  • DFI
    Vertical Barrier Wall Installation Using The Vibrated Beam Method; An Appropropriate Technique In Selected Applications

    By Michael E. Ameel

    The vibrated beam method of installing a vertical barrier wall is one of the least applied techniques, yet given certain site conditions and constraints, it is a cost-effective and proven method of co

    Jan 1, 2010