    Goethals Bridge Replacement Foundation Design Modifications Due to Field Conditions

    By John P. Turner, Mark Jen, Bobby Daita

    "The Port Authority of New York and New Jersey is replacing the existing Goethals Bridge built in 1928 which is deemed to be functionally obsolete. The replacement bridge will consist of a dual cable-

    Jan 1, 2016

  • DFI
    Solving Variable Bedrock Challenges With Ductile Iron Piles

    By Kevin R. Johnson, Matt Caskey, Bryan Plaskett

    Working in urban environments presents unique logistical challenges beyond those typically associated with traditional geotechnical design and construction. These challenges can include constrained si

    Oct 1, 2022

  • DFI
    Application Of Pile Test Data For The Foundation Design Of Rail Viaduct At Carrum, Victoria

    By Nick M. Withers, Suthagarann Visvalingam, Cillian Mc Colgan

    The level crossings removal project in Victoria is removing 75 level crossings across Melbourne to improve safety by separating trains from traffic, with other benefits such as reduced congestion, an

    Nov 1, 2022

  • DFI
    Deep Foundations for Top-Down Construction of High-Rise Project

    By Martin B. Hudson, Kenneth S. Hudson, Gwendolyn Arreguin

    A twin high-rise project site in Century City posed several foundation engineering challenges for the design team. One portion of the twin high-rise project site was required to utilize top-down const

    Jan 1, 2019

  • DFI
    Design and Construction of the Cannelton Hydroelectric Plant Cofferdam and Cut-Off Wall

    By James M. Tantalla, Dwight Metcalf, Roderic A. Ellman Jr.

    "The construction of a new low head hydro-electric plant at the Cannelton Lock and Dam required the design and construction of a cofferdam to accommodate a deep excavation extending approximately 150

    Jan 1, 2016

  • DFI
    Realistic Estimation Of Water Table Depth For Design Optimization Of Bored Tunnel And Cut & Cover Tunnel Structures For Underground Metro

    By Chiranjib Sarkar, Sibapriya Mukherjee, N Kumar Pichumani

    With the rapid expansion of urban transportation systems, tunnels and cut & cover structures are considered as the only solution in improving the urban space congestion problem in mass rapid transit s

    Nov 1, 2022

  • DFI
    Case Histories of Circular Secant Pile Access Shafts for Tunnels

    By Piotr Kozlowski, Stanley L. Worst, Matthew J. Niermann

    Circular secant pile shafts were installed along the tunnel alignments for both the Ohio Canal Interceptor Tunnel project in Akron, Ohio and the Ohio River Tunnel project in Louisville, Kentucky. The

    Jan 1, 2019

  • DFI
    Data Drives Herbert Hoover Dike (Hhd) Rehabilitation Efforts

    By Michael Arnold, Jignyash Manyam, Yoav Rappaport

    The USACE required construction of over 13 miles of cutoff wall at an average depth of 65 feet for the Herbert Hoover Dike (HHD). To meet project requirements, to provide quality control and make soun

    Oct 1, 2022

  • DFI
    Cement Deep Soil Mixing Shear Wall Stabilization Calaveras Dam Replacement Project, California

    By Michael Forrest, John Roadifer, Glen Gorski

    "The Calaveras Dam Replacement Project (CDRP) requires large disposal sites to store excess excavated materials that could not be utilized for dam construction. Because of access restrictions during d

    Jan 1, 2015

  • DFI
    Top-Loaded Bidirectional Test, a New Approach to Deep Foundations Load Testing

    By Patrick J. Hannigan, Frank Rausche, Rozbeh B. Moghaddam

    The Top-Loaded Bi-Directional Test (“TLBT”) is a new method to apply bi-directional loads to a deep foundation element with the loading source located above the foundation head. In the TLBT reusable l

    Sep 8, 2021

  • DFI
    Safety Evaluation Of Adjoining Structures In Urban Areas During Deep Excavation: A Case Study Of Nagpur Metro

    By Shreya Vivek Hokam, Dr. A. I. Dhatrak, S. W. Thakare, Dr. Vivek S. Hokam

    Construction in congested urban areas has necessitated tall and massive structures. In urban areas, it is common to construct underground structure nearby existing buildings. Selection of an appropria

    Sep 1, 2022

  • DFI
    Signal Anomalies in Crosshole Sonic Logging Testing with a Case Study in Metro Manila

    By Benjamin B. Buensuceso III

    Crosshole sonic logging (CSL) is a popular quality assurance and quality control method used to examine the concrete quality of cast-in place deep foundations, though the evaluation of the results is

    Sep 8, 2021

  • DFI
    Self Hardening Slurry Wall Installation By Hydromill At The Herbert Hoover Dike ? An Innovative Solution

    By Mario Mauro

    In 2007 the US Army Corps of Engineers classified the Herbert Hoover Dike in Florida as a Dam Safety Action Classification (DSAC) 1 dam, and started the implementation of one of the largest dam rehabi

  • DFI
    Water Powered Percussive Downhole Hammers – Energy Savings And Productivity

    By Shyam Chengalath, Johan Jeansson, Magnus Hörman

    Down-The-Hole (DTH) drilling usually uses compressed air to power the hammer. However, there are now DTH hammers on the market which instead of compressed air use high pressure water to power the hamm

    Sep 1, 2022

  • DFI
    An Analysis of LRFD for Helical Anchors

    By Ronaldo Luna, Donald Deardorff

    "The use of load and resistance factor design (LRFD) is well documented since the 1960s for structural applications when it was first adopted into the American Concrete Institute Building Code in 1963

    Jan 1, 2009

  • DFI
    Effective Sampling, Testing and Specification Approaches for Deep Mixing at Kitimat LNG, BC

    By Randy R. Williams, Brian W. Wilson, George M. Filz, Marina S. W. Li, Donald A. Bruce

    "In-situ wet grab sampling and post-installation coring of soil-cement structures are typically carried out for Quality Control (QC) and Quality Assurance (QA) of deep mixing (DM) schemes. Wet grab sa

    Jan 1, 2015

  • DFI
    Large Diameter Open-End Pipe Pile Driveability Analysis Including Geotechnical Friction Fatigue

    By Patrick J. Hannigan, Frank Rausche, Rozbeh B. Moghaddam

    Large diameter open-end pipe piles are increasingly used as deep foundations to support heavy onshore and offshore structures. During the driving process, several factors such as subsurface conditions

    Jan 1, 2019

  • DFI
    Data Collected and Lessons Learned from Load Test Program for ACIP Piles Supporting Highway Bridges

    By Reinaldo J. Villa, Joshua C. Adams

    The I-395/SR-836/I-95 reconstruction project is an $818-million design-build construction effort that includes construction of viaduct, segmental and signature bridges in Miami leading into Miami Beac

    Sep 8, 2021

  • DFI
    Friction Fatigue and Drivability Analysis of Open Ended Pipe Piles Based on Cone Penetration Testing Results

    By Frank Rausche, Scott D. Webster, Rozbeh B. Moghaddam

    "Pile foundation driveability is a function of several variables such as subsurface characteristics, hammer type, hammer efficiency, pile type, and plugging conditions. One important phenomenon occurr

    Jan 1, 2017

  • DFI
    The Potential Impacts Of Questionable Instrumenation Data

    By Giovanni A. Bonita, Asher H. Peltz, Sean D. Johnson

    This paper examines a complex earthwork project in the Washington DC metro area that had project delivery directly impacted by questionable instrumentation monitoring data. The case study summarizes t