Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • DFI
    Design Of The BMIP Boat Section - Introduction

    By Kenneth Pidgeon

    The Boston Marine Industrial Park (BMIP) Boat Section, which is part of contract C04A2 of the Central Artery/Tunnel (CA/T) project, is currently under construction in South Boston, Massachusetts (Fig.

    Jan 1, 1994

  • DFI
    Conference Papers - Conference Papers: Session 1 - Construction Of A Deep Basement On A Sloping Site In Glasgow: The Aurora Project

    By H. Boghosian

    This paper presents the design and construction of a deep basement in a steeply sloping site in glacial till in Glasgow city centre. Existing foundations, adjacent structures and services, in tandem w

    Jan 1, 2006

  • DFI
    Load In A Drilled Foundation. Where Did It Go And When Did It Get There?

    By Walter E. Vanderpool

    Three drilled foundations for an elevated water-tank were instrumented, tested and monitored during construction and the first two years in service. One shaft was load tested by the Osterberg method.

    Jan 1, 2004

  • DFI
    Woodrow Wilson Bridge Cofferdams (ef6ed0b3-5c8c-41f1-8337-00ee57bff823)

    By Roderic A. Ellman

    The new Woodrow Wilson Bridge (WWB) will replace the existing bridge over the Potomac River to connect Alexandria, Virginia to Prince Georges County, Maryland. The new WWB will extend approximately 1.

    Jan 1, 2013

  • DFI
    Assessing the Bearing Capacity of Existing Wood Pile Foundations

    By Almer E. C. van der Stoel

    "Abstract This paper deals with assessing the bearing capacity of existing wood pile foundations. With a wide range of restoration projects being performed in the Netherlands, on many locations deep e

    Jan 1, 2014

  • DFI
    Recent Advances In Soil Nailed Earth Retention

    By Tom A. Armour

    Different variations of soil nailing techniques have been used in the United States since the late 1970's. Such techniques owe their origins to French developments, which began in the early 1970&

    Jan 1, 2003

  • DFI
    Augered Cast-In-Place Piles Deep Foundations Institute (DFI) 1988 Annual Meeting - Ritz-Carlton Hotel In Atlanta (Buckhead), Georgia

    By James J. Neate

    The augered cast-in-place pile system came into use in the late 1940's where various techniques were tried using pressure grouting methods. In the early development stages some piles were install

    Jan 1, 1988

  • DFI
    O Street Anchored Precast Lagging And Soldier Pile Retaining Wall

    By John Wise

    Significant movement to an existing slurry wall which serves as a retaining wall on 'O' Street in Southeast Washington, D.C. initiated the Department of Public Works for the District of Colu

    Jan 1, 2003

  • DFI
    Press-In Piling Technology For Sustainable Construction

    By Philip Dubbeling

    Conventional dynamic sheetpiling techniques are ill-suited to urban development because of the emission of excessive noise and ground vibrations. Drilled shafts and slurry walls alleviate some of thes

    Jan 1, 2006

  • DFI
    Ground Support for Shafts and Underground Construction Using Artificial Ground Freezing – Sophia Spoortunnel Rotterdam (Nl) – Cern Geneva (CH) – Leipzig (DE) – Berlin (DE)

    By Helmut Hass, Marco Ziller

    "Abstract: 1 Sophia Spoortunnel Marco Ziller, Trevi S.p.A.:For the construction of 14 cross passages connecting the twin tunnels of the Sophiaspoortunnel the Artificial Ground Freezing technique was a

    Jan 1, 2014

  • DFI
    Recent Experience With The Omega Pile And New Applications - Synopsis

    By Maurice Bottiau

    The recent evolution of the piling market clearly shows a growing demand for screw piles with soil displacement. The recently developed Omega Screw pile ful-fill these new expectations, combining the

    Jan 1, 1996

  • DFI
    Update Of Aashto Standard Specifications For Highway Bridges: Division II--Construction - Preliminary Draft Final Report Vol. II - Specifications And Commentary - Driven Foundation Piles - 4.1 Description

    This work shall consist of furnishing and driving foundation piles of the type and dimensions designated on the plans or in the special provisions including cutting off or building up foundation piles

    Jan 1, 1989

  • DFI
    Threading Piles Past Underground Assets In Central London

    By Alexander Nikolic

    The paper presents the foundation design and construction of a landmark urban redevelopment scheme in central London, UK. The scheme comprises the new Tottenham Court Road Underground station, Crossra

    Jan 1, 2011

  • DFI
    Analysis of the Uncertainty by the Random Finite Elements Method of a Vertical Load Test of a Piled Raft Founded in Tropical Soil

    By Cristhian C. Mendoza, Renato da Cunha, Bernardo Caicedo, Max Barbosa

    "Abstract This paper shows that a raft alone is not sufficiently appropriate to address the uncertainty of underlying soil variability; therefore, a piled raft system is a better option for mitigating

    Jan 1, 2014

  • DFI
    Soil Nail And Jet Grouted Excavation Support Wall At Peirce Mill Dam

    By Eric M. Klein

    As part of the Woodrow Wilson Replacement Bridge project several damaged wetland and environmental areas were to be mitigated. One of the mitigation projects consisted of constructing a Denil fish lad

    Jan 1, 2006

  • DFI
    Ultimate Soil Pressures For Pile Groups In Soft Clay Subjected To Lateral Soil Movements

    By L. F. Miao

    Studies were carried out to investigate the ultimate soil pressure acting on pile(s) undergoing lateral soil movement in soft clay. A special apparatus has been designed to apply a uniform rectangular

    Jan 1, 2008

  • DFI
    Army Corps of Engineers Seepage Control Cutoffs for Dam and Levees Engineering Manual (EM)

    By David B. Paul

    "ABSTRACTThe US Army Corps of Engineers (USACE) has 704 dams in their inventory and over 100,000 miles of levees with a capital value of over $150 billion. Currently, there are 319 dams that are class

    Jan 1, 2014

  • DFI
    Use Of Non-Invasive Helical Foundations For Urban Forest Canopy Walk Way ? Atlanta Botanical Garden

    By David C. Kraft

    Helical piles and ground anchors were used to meet critical design and constructability requirements for an urban forest Canopy Walk at the Atlanta Botanical Garden, Atlanta, GA. The 12-foot wide ped

    Jan 1, 2011

  • DFI
    Innovative Methods for Underground Parking in Central Cities

    By Qi Wang, Zengzhu Kang, Jianguo Liu, Guanglei Liu

    "Due to the increase of automotive vehicles, available parking spaces become a new type of limited resource in central cities of China, especially in those old districts without visionary urban planni

    Jan 1, 2017

  • DFI
    "Value Engineering" In United States Of America

    By Maral Papazian Bedian

    Construction contracts in the USA contain the clause "Value Engineering" ? an interesting and curious clause allowing contractor initiated design changes. Misleading is the interpretation of value eng

    Jan 1, 2002