Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • CIM
    Recovery of Copper from Printed Circuit Boards Using Ammoniacal Alkaline Solution

    By M. Tanaka, T. Oishi, K. Koyama, S. Alam

    "A novel hydrometallurgical process for copper recovery from waste printed circuit boards has been proposed, which consists of selective leaching of copper metal as Cu(I) by Cu(II) in ammoniacal alkal

    Jan 1, 2012

  • CIM
    Design, Commissioning, Start-Up and Performance of Vale’s Long Harbour Stirred Media Detritor Ultrafine Grinding Circuit

    By Adam Moore, Ryan Gillespie, Jarrett Quinn, Audrey Walters, Peter Radziszewski

    "Vale Long Harbour Processing Plant (LHPP) was designed to process Voisey’s Bay nickel concentrate into finished nickel and associated copper and cobalt products. The plant includes a secondary grindi

    Jan 1, 2016

  • CIM
    Vacuum Degassing of Steel

    By D. E. Parson, W. A. Morgan

    This paper offers a brief review of current literature pertaining to vacuum degassing or vacuum casting of steel as practiced in the U.S.A., Germany and the U.S.S.R. The advantages of vacuum degassin

    Jan 1, 1961

  • CIM
    Flotation Copper Recovery from Converter Slag of the Sarcheshmeh Khatoonabad Smelter

    By A. Eslami

    When producing high grade mattes in smelter plants, copper losses in the slag are inevitable. Hence, the recovery of copper from slag has been the focus of many research projects, copper flotation bei

    Jan 1, 2007

  • CIM
    Mapping Mining-Induced Subsidence from Space in a Hard Rock Mine: Example of SAR Interferometry Application at the Kiruna Mine, Sweden

    By Emmanuel Henry

    Hanging wall deformation monitoring at the Kiruna Mine is a major concern for Luossavaara- Kiirunavaara AB (LKAB) since underground production is deepening towards the Kiruna Town. In the quest for mo

    May 1, 2003

  • CIM
    Coal Problems of Alberta

    By W. J. Dick

    THE purpose of this paper is to point out, briefly, the importance of the coal mining industry of Alberta and to stress the economic factors that hinder its development; also to offer suggestions rela

    Jan 1, 1936

  • CIM
    Acidity Estimation of Pressure Leach Solutions at High Temperatures by Conductivity

    By V. G. c Papangelakis, M. Huang

    A conductivity cell, developed previously, was employed in an effort to investigate the inter-relation between electrical conductivity and acidity of sulphuric acid - metal sulphate solutions at high

    Jan 1, 2004

  • CIM
    Geophysical Case Study of the Iso and New Insco Deposits, Québec, Canada, Part II: Modeling and Interpretation

    By D. Bois, P. Keating, J. Lemieux, M. A. Vallée, M. Allard, R. S. Smith, L. Z. Cheng, M. Chouteau, D. K. Fountain

    "Abstract - MEGATEMII airborne electromagnetic data collected over the Iso and New Insco massive sulfide deposits have been modeled using three modeling packages. The EMQ package is a quick inversion

    Jan 1, 2006

  • CIM
    Economic Considerations in the Production and Preparation of Coal for the Carbonization Market

    By Gerald Blackmore

    "This paper suggests that with the settlement of long-term contracts of fifteen years' duration, with prospects of extension, the coal mining industry has, for the first time, a complete commercial ju

    Jan 1, 1970

  • CIM
    The Role of Coal in the Energy Fuel Resources in the U.S.S.R.

    By N. V. Mel'nikov

    This paper discusses the reserves of oil, natural gas and coal in the USSR, with particular attention to the future role to be played by coal in supplying the energy fuel resources of the country.

    Jan 1, 1972

  • CIM
    Functionalized Mesoporous Silica: An Effective Adsorbent for the Uptake of Gold Thiosulfate

    By L. Mercier, R. Narendrula, F. Desmarais, L. Amaratunga, A. Aledresse

    Thiosulfate is recognized as a promising alternative lixiviant to cyanide for the extraction of gold from ore bodies. Gold thiosulfate ([Au(S2O3)2]2), however, is not well-adsorbed by activated charco

    Jan 1, 2011

  • CIM
    Removal, Control and Management of Total Dissolved Solids from Process Effluent Streams in the Non-Ferrous Metallurgical Industry- A Review

    By V. “Ram” Ramachandran

    "In view of the increasing number of environmental regulations that have been promulgated all over the world in the last thirty years, non-ferrous smelters and refineries have had to learn and adapt t

    Jan 1, 2012

  • CIM
    Geology of tile Sturgeon Lake copper-zinc-Iead-silver-gold deposit

    By P. W. A Severin

    "The Sturgeon Lake deposit, a partly eroded lens of massive sulphides with an underlying sulphide stringer zone, is one of five orebodies that occur in the Sturgeon Lake area of northwestern Ontario w

    Jan 1, 1982

  • CIM
    The Impact of Tonnage Oxygen on Steelmaking at Stelco

    By F W. Irwin

    In recent years, a number of significant developments have occurred in the steel industry which are no-table and of general interest. This paper is confined to the steel-melting phase of the business.

    Jan 1, 1965

  • CIM
    Discrete Event Simulation Modelling versus TKM Analysis of a Mine Operating with a Hybrid Material Movement Practice Consisting of Truck Haulage and Skipping

    By Kristopher John Shelswell

    The work in this paper describes the theory, development and analysis of a computer model simulating a mine operation moving material using concurrent decline ramp truck haulage and skipping practices

    May 1, 2013

  • CIM
    Geology of the Buchans Orebodies

    By R. L. Brown, E. A. Swanson

    THE Buchans ore bodies are located in central Newfoundland, three miles north of Red Indian lake. The townsite of Buchans was named after a Royal Navy Captain who, while attempting to make contact wit

    Jan 1, 1962

  • CIM
    Shear Mechanism of Rock Joints under Load-Controlled Cyclic Loading Conditions

    By C. Gravel, A. Fathi, P. Rivard, G. Ballivy, Z. Moradian, M. Quirion

    Knowing shear mechanism of discontinuities under monotonic and cyclic loading conditions is a key factor in stability analysis of rock slopes and rock foundations. In this paper, the effect of cyclic

    Jan 1, 2015

  • CIM
    A Challenging Task to Improve Potlife in Aluminum Industry

    By V. C. Pandolfelli, L. Paulino, C. E. Zangiacomi

    The continuous improvement in aluminum industry over the last years has increased metal output at lower cost. The potlining plays an important role in this regard due to high cost involved and more re

    Jan 1, 2006

  • CIM
    Dynamic Bubble Nucleation in Flotation

    By P. Cleyle, J. H. Masliyah, R. S. Chow, Z. H. Xu, Z. A. Zhou

    Bubble nucleation in water under dynamic conditions was investigated using an autoclave at an air saturation pressure of 7 atm. Agitation during air saturation of water was found to be crucial in enha

    Jan 1, 2009

  • CIM
    Inspection and rehabilitation of the Daly-Judge Tunnel, Park City, Utah

    The Daly-Judge Tunnel, begun in 1887 to drain mine workings, is now a source of potable water for the Municipality of Park City. The water is exceptionally clean; however, when roof falls occur, suspe

    Jan 1, 2006