Search Documents

  • AIME
    Iron and Steel Division - Liquid Miscibility Gap in Iron-Tin System (TN)

    By K. C. Mills, E. T. Turkdogan

    A number of investigators1 6 have noted the presence of a liquid miscibility gap in the Fe-Sn binary system. However, the first attempt to measure the

    Jan 1, 1964

  • SME
    A 4.75m Contractor Manufactured EPB Machine

    By Bruce Richardson

    A contractor-manufactured 4.75m (15'-7") diameter EPB shield excavated a 115m (375 ft) long tunnel under the San Antonio River as part of the Salado Creek to Dos Rios Pipeline Interconnect Projec

    Jan 1, 2008

  • SAIMM
    Recycling And Environmental Issues Of Metallurgical Slags And Salt Fluxes

    By M. Reuter, U. Boin

    The target of the current metallurgical industry is to recycle and utilize all their by-products, so as to close the sustainable production loop. Slags are the important wastes and by-products of meta

    Jan 1, 2004

  • AUSIMM
    Magma Suites and Metallogeny - Examples from the Canadian Cordillera

    By J R. Lang, J K. Mortensen

    The Canadian Cordillera contains numerous classic porphyry deposits and several unusual subtypes, including the alkaline suite of porphyry Cu-Au deposits and the Tombstone m

    Jan 1, 1995

  • NIOSH
    IC 8186 Research And Technologic Work On Alabama Coals: An Annotated Bibliography (5c530489-7a2f-4fa5-b7b1-0f3c2a38da5d)

    By R. Q. Shotts

    Factors of geological structure and occurrence of coalbeds, plus the resulting mining conditions, have required more care in preparing coals in Alabama than in most other districts almost since mining

    Jan 1, 1963

  • DFI
    A Theoretical Study Of Underpinning Of Rigid Circular Foundations By Piles ? Synopsis

    By M. Makarchian

    Existing buildings sometimes experience excessive settlement under their design loads, or due to increased foundation loading, if a change of building use is required. One of the oldest and widely num

    Jan 1, 1996

  • DFI
    Design And Construction Of Bored Piles And Diaphragm Wall For MHA Headquarters Complex, Singapore - Synopsis

    By N. S. Yet

    This paper shall present the design and construction of bored pile and diaphragm wall for the proposed MHA complex in Singapore. The work was carried out by L&M Foundation Specialist Pte Ltd and PWD C

    Jan 1, 2000

  • NIOSH
    RI 3184 Sanitary Surveys of the Coal-Minig, Metal-Mining & Smelter Towns of Utah

    By Arthur L. Murray

    "INTRODUCTION In compliance with those provisions of the organic act establishing the Bureau. of Mines which relate to improvement of health conditions of persons engaged in the mining, preparation, o

    Oct 1, 1932

  • AUSIMM
    Deep Mill Level Zone – from Feasibility to Production

    By A Priatna, H Rumbino, T Casten

    This paper discusses the progress of the Deep Mill Level Zone (DMLZ) mine from the pre-feasibility study completed in 2005, through commencement of development access in 2008, completion of the feasib

    May 9, 2016

  • AUSIMM
    Stabilisation of Pit Slopes, Waikaka Alluvial Gold Mine

    Wet mining of auriferous gravels at L & MÆs Waikaka operation in Southland creates spoil dumps derived from stripping of a clay rich overburden, tailings from past dredging and the processing of aurif

    Jan 1, 2002

  • AUSIMM
    Some Aspects of the Role of Oxygen in Sulphide Mineral Flotation

    By the use of flotation tests it was confirmed that there are two functions of oxygen in sulphide mineral flotation. Sized samples of galena and chalcopyrite were sulphidized, washed free of excess su

    Jan 1, 1967

  • NIOSH
    RI 7874 Fracturing Oil Shale With Explosives for In Situ Oil Recovery

    By J. S. Miller

    This report presents a complete coverage of results from Bureau of Mines preliminary research and the field application of explosive fracturing techniques to prepare oil shale for in situ recovery of

    Jan 1, 1974

  • DFI
    Support Of Excavation System - Columbia Heights Metro Station Project - Washington, D.C. - Summary:

    By Robert W. Bergwall

    The $58,000,000.00 Columbia Heights Metro Station project (Section E3-a) forms a part of the Washington Metropolitan Area Transit Authority's (WMATA) Greenbelt Route - Green Line subway system. T

    Jan 1, 1997

  • SAIMM
    Empirical Observations of Dilution in Panel Caving

    By R. L. Castro

    The extraction of ore in panel caving operations also involves the coextraction of non-economic material, known as dilution. Forecasting, avoiding, and understanding the mechanics of dilution is criti

    Jan 1, 2014

  • NIOSH
    IC 8186 Research And Technologic Work On Alabama Coals: An Annotated Bibliography

    By R. Q. Shotts

    Factors of geological structure and occurrence of coalbeds, plus the resulting mining conditions, have required more care in preparing coals in Alabama than in most other districts almost since mining

    Jan 1, 1963

  • ISEE
    Blast Design & Diagnostics Using Portable Solid State, High-Speed Videography Systems

    By Laura Bastemante, Bruce Vandenberg, Fred Huettig

    Recent advances in solid-state, field portable, fast framing video camera systems and PC based frame capture hardware now allow blast imaging up to loo0 frames per second. Up to 8 seconds of data can

    Jan 1, 1997

  • CIM
    A New Rheoforming Processing Of Semi-Solid Aluminum Alloys

    By J-L. Tang

    A new rhcoforming processing of Al alloys with component shaping systems apart from slurry preparation systems is experimentally exploited, using the reversible multilevel-speed electromagnetic stirre

    Jan 1, 2007

  • IIMP
    Metodología general para la ejecución de piques verticales en terrenos altamente deformados

    By Enrique Castells

    La extracción del mineral es el método más habitual para la explotación minera y se realiza a través de rampas, galerías, y túneles que permitan el acceso hasta la zona de minado. Sin embargo, cuando

    Sep 13, 2001

  • CIM
    Technical Review and Evaluation of Ore Sorting Technology Incorporating Results from Four Properties

    By B. Hilscher, P. Nayak, N. Yoon

    "The mining industry is currently facing challenges with declining feed grades and is struggling to find solutions to improve the project’s economic value. By means of pre-concentration, ore sorting a

    Jan 1, 2017

  • AUSIMM
    Managing the Cumulative Groundwater Impacts of Multiple Iron Ore Projects at Cape Preston (or à One Plus One Plus One Plus One Does Not Equal Four)

    By J Hall, A Gallardo, M Strizek

    Mineralogy and coproponents Sino Iron, International Minerals and Austeel are in the process of developing four world class magnetite iron ore mines with multiple open pits along a 25 km strike length

    Jan 1, 2009