    Longwall Mining-Induced Abutment Loads and Their Impacts on Pillar and Entry Stability

    By Jinsheng Chen

    Longwall mining-induced abutment loads on the surrounding coal pillars can be grouped into two categories in terms of the relative position of the coal pillars and the longwall face. They are the fron

    Jan 1, 2002

  • SME-ICGCM
    Evaluation Of Subsidence Parameters For Inclined Seams In UK Coalfields

    By X. L. Yao

    This paper analyses the effects of mining extraction geometry (width/depth ratio) and dip of seam on subsidence parameters based on a large Database, containing 120 longwall mining cases all within th

    Jan 1, 1990

  • SME-ICGCM
    Simulated Materials Modeling And Analysis Of The Overburden Strata Movement In Top Coal Caving Mining

    By Zhou Ying

    Based on the mining condition and roof lithology of the 2-3 coal seam at Gengcun Mine, the simulated materials modeling method was used to study the movement process and characteristics of overburden

    Jan 1, 2001

  • SME-ICGCM
    A Method for the Selection of Rock Support Based on Bolt Loading Measurements

    By Stephen P. Signer

    A method to assist in the evaluation and selection of roof bolts using in situ measurements of roof bolt loading has been developed by researchers of the Spokane Research Center, National Institute of

    Jan 1, 1997

  • SME-ICGCM
    Review Of Pillar Design Equations Including The Effects Of Constraint

    By C. Babcock

    This Bureau of Mines report considers some equations for mine pillar design from 1833 to the present. Most of the equations are of essentially the same kind, using pillar width to height relationships

    Jan 1, 1981

  • SME-ICGCM
    Assessment Of Underground Structural Design

    By Eugene D. Krupa

    Mine 33 of Beth Energy has serious and complex roof cutter problems causing delay of the advance rate of both the entry development and longwall face retreat. The cost of maintaining these entries is

    Jan 1, 1990

  • SME-ICGCM
    Support of Tunnels in South African Gold Mines

    By L. Z. Wojno

    Tunnels in South African gold mines are developed at depths down to 3 600 m below surface where the virgin rock stress approaches 100 MPa and, on occasions, through rock where the field stresses excee

    Jan 1, 1987

  • SME-ICGCM
    Optimizing Secondary Roof Support With The NIOSH Support Technology Optimization Program (STOP) (9d51b6a2-7ba0-4aba-9b0e-5647ea8b90eb)

    By Thomas M. Barczak

    The decade of the 90's brought an unprecedented increase in the development of innovative technologies to provide more effective and easier to install roof support in underground mines. To facili

    Jan 1, 2000

  • SME-ICGCM
    Tunnel Deformation Monitoring "Action Levels" In Coal Mines For Support/Reinforcement Design

    By Lorraine Kent

    Mine tunnel support using rockbolts was introduced in UK coal mines over the period 1987- 1992 and is now used in over 70% of all mine tunnels. In every case the reinforcement design has been based on

    Jan 1, 1999

  • SME-ICGCM
    The Effect Of Hazardous Geologic Structures On Gateroad Stability

    By Frank E. Chase

    Geologic structures have been responsible for numerous underground accidents and fatalities, and are a constant-source of down time. During - longwall mining, ground control problems associated with g

    Jan 1, 1990

  • SME-ICGCM
    Downhole Overcoring Stress Measurement at a Western Underground Coal Mine

    By David Conover

    Knowledge of the magnitude and direction of the horizontal secondary principal stresses is a critical factor in designing the layout and mining sequence of underground openings. Typically, horizontal

    Jan 1, 2004

  • SME-ICGCM
    RQD from the Barrel to the Box: Weatherability May be a Better indicator for Roof Support Design

    By Kot Unrug

    For the purposes of underground mine design, twelve cores of the Springfield (V) Coal (Pennsylvanian) roof and floor were retrieved. Each core was photographed, described fresh in the barrel, and the

    Jan 1, 2003

  • SME-ICGCM
    Application Of DDM To Some Rock Pressure Problems In Japanese Deep Coal Mines

    By Yoshiaki Fujii

    Displacement Discontinuity Method (DDM), which was originally developed by Crouch,S.L., is a powerful tool to calculate mechanical disturbances due to tabular excavations. Three topics on DDM applicat

    Jan 1, 1992

  • SME-ICGCM
    Estimating Rock Strengths Using Drilling Parameters During Roof Bolting Operations - Progress Report

    By Yi Luo

    Accurate mechanical and geological information of the roof strata is vital for roof bolting design in underground mines. In order to obtain such information in a timely manner, a research has been und

    Jan 1, 2002

  • SME-ICGCM
    Mistakes, Misconceptions, and Key Points Regarding Secondary Roof Support Systems (b87a5324-ac75-480a-90d7-e642733c14a4)

    By Thomas M. Barczak

    Roof support systems are necessary to provide stable mine openings and much research has been conducted to design a variety of roof support systems that will function in various manners to ensure that

    Jan 1, 2001

  • SME-ICGCM
    Renewed Interest In Prop Supports As A Replacement For Wood Cribs

    By Thomas M. Barczak

    Wood cribs have been the dominant form of supplemental support in coal mining for many years. Recently, there has been a renewed interest in prop supports as a replacement for wood cribbing due to the

    Jan 1, 1995

  • SME-ICGCM
    Status Of Longwall Research In CSIRO

    By Michael Kelly

    Current research in longwall mining in CSIRO Exploration & Mining is focused within five major projects and several minor projects. The major projects are: 1 3D Aspects of Longwall Geomechanics. Th

    Jan 1, 2001

  • SME-ICGCM
    Longwall Production, Maintenance, And Roof Control System

    By W. Mark Hart

    The current Automatic Data Acquisition system developed by some support manufacturers make it possible to monitor and record changes in leg pressure, DA RAM stroke in every shield and shearer position

    Jan 1, 1994

  • SME-ICGCM
    Preventing Falls Of Ground In Coal Mines With Exceptionally Low-Strength Roof: Two Case Studies

    By Christopher Mark

    Mines with exceptionally low-strength roof (UCS <3,500 psi and CMRR <40) are much more likely to struggle with roof falls than other mines. Weak-roof is a particular problem for many room and pillar m

    Jan 1, 2004

  • SME-ICGCM
    Analysis Of Retreat Mining Pillar Stability

    By Christopher Mark

    Preventing pillar line squeezes, massive pillar collapses, and coal pillar bumps is critical to the safe and efficient recovery of coal during retreat mining operations. To help prevent these problems

    Jan 1, 1995