Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
Modification and enhanced testing of data mining-based algorithm to detect subtle errors in temperature sensors in a gold-stripping circuitBy Rambabu Pothina, MELO EDUARDO PIMENTA DE, Rajive Ganguli
The mining industry is home to a mass of sensor-generated data that are critical to real-time and long-term optimization. This heavy reliance on sensor data has resulted in an undesirable development
-
Challenges and Solutions related to the Interaction of Soil Conditioning and Main Drive on Large Diameter EPB TBM’s - A Case HistoryBy Jens Classen
"GENERAL PROJECT DATA The Sparvo Tunnel belongs to “Variante di Valico” project, a new 65 km highway link between Bologna and Florence, designed to renew the existing A1 route and to connect in a fast
Jan 1, 2016
-
Life-Of-Mine Schedule From Multiple Pits: Case Study For The Tenke Fungurume Mining DistrictBy R. Benito
This paper describes the development of a life-of-mine schedule (LOM) for one of the world's largest known sedimentary copper-cobalt districts located in the Katanga Province, Democratic Republic
Jan 1, 2011
-
Magnetite Flotation from Sanidine with Environmental Benign Collector Poly(Amidoamine) - Mining, Metallurgy & Exploration (2023)By Muhammed Şener, Ahmet Gültek
The flotation chemicals are important in mineral processing, and new progress is made in this area day by day. For sanidine purification, some commercial collectors, which can be harmful to the enviro
Apr 28, 2023
-
Process Control In Uranium Mills - How Far Can Automation Go?By John W. Barnes
In seeking cost reductions, control methods are a fertile field because they significantly affect labor and other costs. While process control in uranium mills is excellent by the evidence of high rec
Jan 1, 1960
-
Micro-Price Optimization of Coal Processing OperationsBy Luttrell. G.
The profitability of coal mining operations is highly dependent on the performance of the coal blending and processing facilities. Many companies have recognized this fact and have instituted optimiza
Feb 23, 2014
-
Risk And Remediation: The Great RiftBy L. H. Pye
For large mining sites in the west, the traditional method for performing an ecological risk assessment (ERA) provides little useful information for risk managers faced with selecting and designing so
Jan 1, 1999
-
Adding A Third Main Fan At The Waste Isolation Pilot Plant (1998)The Waste Isolation Pilot Plant (WIPP) is adding a third fan to operate in parallel with, and supplement, its two existing main fans. An engineering analysis conducted in 1995 identified the need for
Jan 1, 1998
-
Performance of Four EPB-TBMs Above and Below the Groundwater Table on the ECIS Project, Los Angeles, CA, USABy Jörg Holzhäuser, Matthew Crow
An 18.5 km (12 mile) long tunnel is being driven by four Earth Pressure Balance Tunnel Boring Machines (EPB-TBMs) of 4.7 m (15.5 ft.) diameter through alluvial sand, gravel, silt and clay above and be
Jan 1, 2003
-
Modeling Spatial Variance and Investigating the Effects of Variability on Intact Rock Strength and Stability of Entries in a Longwall Mine "Mining, Metallurgy & Exploration (2020)"By Danqing Gao, Brijes Mishra
Spatial variance of rock properties is an important characteristic of rock which addresses the heterogeneity of mechanical and physical properties and their effect on underground mining. Assessing spa
Jul 20, 2020
-
Copper Leaching: 2014-2015 Global Operating DataBy R. Scheffel, R. Washnock, G. Zarate
"The second survey of global copper leaching operations has been completed, the data published in 1998 has been updated. A survey questionnaire was sent to 40 identified copper leach operations around
Jan 1, 2016
-
Pellet Feed Production Via The Concentration Of Flotation TailingsBy M. G. Vieira
This investigation addressed the possibility of producing pellet feed at a silica content of = 1.0% using a representative sample of Samarco´s mechanical flotation tailings. This sample contained 11.0
Jan 1, 2010
-
Leaching Of Gold And Silver From A Kupol Composite Sample: Assessment Of The CANMET Enhanced Leaching Process (CELP)By G. Deschênes
In an earlier study (Deschênes et al., 2009), gold and silver were shown to be efficiently extracted from samples taken from the Kupol Mine in Russia using lead nitrate in a cyanide leach system. In t
Jan 1, 2010
-
Air Cleaning Performance of a New Environmentally Controlled Primary Crusher Operator BoothBy B. Holen, J. R. Baregi, J. A. Organiscak, A. B. Cecala
The National Institute for Occupational Safety and Health (NIOSH) cooperated with 3M Company in the design and testing of a new environmentally controlled primary crusher operator booth at the company
Jan 1, 2015
-
Application of Intelligent Models for Flyrock Prediction Considering Design Parameters and Bench Face Characteristics - Mining, Metallurgy & Exploration (2023)By Turker Hudaverdi, Yasar Agan
This study tries to predict blast-induced flyrock using intelligent modelling techniques. Flyrock is a site-specific phenomenon. Design variables and rock properties highly influence flyrock throw dis
Nov 12, 2023
-
The Influence of Stirred Mill Orientation on Calcite Grinding - Mining, Metallurgy & Exploration (2021)By HASAN SERKAN GOKCEN, SERKAN CAYIRLI
The purpose of this study was to investigate the dry grindability of calcite powders in a vertically and horizontally orientable laboratory batch type stirred mill. The experimental results were evalu
Apr 21, 2021
-
Assessing the Quality of Incident Investigations and its Effect on Safety Performance: A Study of the Ghanaian Mining IndustryBy E. Stemn
Incident investigation is of utmost importance in most high-risk industries. This study was undertaken to study the content of past investigation reports to determine the effectiveness of the incident
Jan 1, 2019
-
Integration of a coal-mine emergency communication network into pre-mine planning and development - SME Transactions 2014By C. J. Bise, M. F. Sindelar
Regulations, such as the MINER Act of 2006, require the installation of redundant and secondary communication systems to assure that contact can be established with coal miners who may become trapped
Jan 1, 2014
-
Study Of The Mechanism And Rate Of Ilmenite WeatheringBy Langtry E. Lynd
Ilmenite concentrates prepared from beach and dune sands of Florida, India, Australia, and other localities deviate to varying degrees from the theoretical composition of pure ilmenite, and generally
Jan 1, 1959
-
Quality Assurance, An Engineering Company's View - The Role Of The Engineering CompanyThe engineering company's participation in quality assurance in the mining industry is twofold. Not only must it have such a program to ensure the necessary high standards for its own design and
Jan 1, 1982