  • DFI
    Information Technology And Monitoring - Technologies De L'Information Et Monitoring - Innovations In Diaphragm-Wall Construction Plant

    By Maurice Guillaud

    The most striking innovations on diaphragm-wall construction plant are those associated with continuous real-time trajectory monitoring of the excavating tool (either a grab or a hydro-cutter). Th

    Jan 1, 2002

  • DFI
    Helix Deflection Effect on Load Settlement Behavior of Pile with Increasing Stress Level

    By Adnan A. Malik, Tadashi Maejima, Jiro Kuwano

    "Previous studies revealed that the helix deflection reduced the end bearing capacity of screw pile in dense ground even if the installation process is completed with minimal soil disturbance. The ult

    Jan 1, 2017

  • DFI
    Development Of Design Charts For Sand Compaction Pile Method Of Improvement For Loose To Medium Dense Sands

    By N. Aarthi, G. R. Dodagoudar

    The improvement of soft clay deposits using stone columns is a well-established ground improvement technique in the western world. This technique has been well documented and has proper design codes f

    Nov 1, 2022

  • DFI
    Design of a Raft Assisted Piled Foundation for a High Rise Prefabricated Hotel Structure in Perth, Wa.

    By Lucie Spencer, Craig Butterworth

    "This paper presents the design of a raft enhanced pile group recently constructed for a hotel development in Perth, WA. At the time of construction in 2016 the hotel was the tallest prefabricated hot

    Jan 1, 1900

  • DFI
    Anchored Double-Tier Retaining Walls on Sloping Embankment

    By Chu E. Ho, Paul Napoli

    A new waterfront park was developed on Long Island in close proximity to the East River and Newtown Creek. The existing ground consisted of fill over soft organic clay, medium dense silty sand, glacia

    Jan 1, 2019

  • DFI
    Evaluation of Existing T-Z Models for Caliche Based on Numerical Analysis of Bi-Directional Load Tests Using NVShaft

    By Ramin Motamed, Fahim M. Bhuiyan, Raj V. Siddharthan, Joseph Toth

    The difficulty in material characterization and the erratic response of cemented soil layers, such as caliche in the Las Vegas valley, creates challenges for practicing engineers to reliably predict t

    Sep 8, 2021

  • DFI
    Inclusion of Overburden Soils Resistance into Shaft Nominal Capacity for Significant Economic Savings – An Osterberg Cell Load Test Case Study

    By Aditya Ayithi, William G. Ryan, Dean Herbst

    "For rock socketed drilled shafts, it is a common practice not to include the frictional resistance of overburden soils into the nominal capacity estimation. The primary reason often being cited is “o

    Jan 1, 2016

  • DFI
    Deep Excavation Support: Innovative Shoring Design in an Urban Environment

    By Richard D. Luark, Fernanda S. Madrona

    Designing temporary retaining systems that allow for deeper excavation amid the existing urban infrastructure has become a challenge. A 60-foot-deep excavation in downtown Seattle was required to cons

    Jan 1, 2019

  • DFI
    Ultimate Bearing Capacity of Small-Diameter Pin-Piles and the Influence of Driving Penetration Resistance

    By Glen Mann, H. G. Vestberg, Robert D. Holtz

    "Underpinning of residential and commercial structures is often accomplished using a number of driven-in-place small diameter steel pipe piles. These piles, at least in the Seattle area, are typically

    Jan 1, 2005

  • DFI
    Replacement of the Kosciuszko Bridge Brooklyn Connector: An Integrated Design and Construction Approach

    By M. D. Riegel, P. B. Pizzimenti, E. M. Zamiskie, Britain A. Materek

    "The Skanska/Kiewit/ECCO III team (SKE) in association with HNTB was awarded the design-build contract for Phase I of the Kosciuszko Bridge Replacement Project. As lead designer for the SKE team, HNTB

    Jan 1, 2016

  • DFI
    An Explosive Waterproofing Of A Riverbank - A Difficult Waterproofing Problem Solved By The Unique And Controversial Combination Of A Mining Technique (Blasting) And A Soil Improvement Technique (Jet-Grouting) - The Problem

    By M. Zanotto

    [ ] A period of heavy rains caused the river Adda to flood parts of the Valtellina, one of the Alpine valleys of Northern Italy. The exceptionally high waters put under considerable strain the whole

    Jan 1, 1992

  • DFI
    Unusual Solutions To Difficult Earth Retention And Underpinning Projects ? Summary

    By Larry Rayburn

    Design of cost effective engineered solutions to complex problems requires the team efforts of the owner, the designer and the specialty construction contractor. The basic ingredients of success requi

    Jan 1, 1991

  • DFI
    Design and In-Construction Geologic Characterization of Micropiles to Support a Historic Transmission Line Upgrade in the Steep Talus and Basalt Slopes of the Columbia River Gorge

    By Brian J. Olson, Kevin Haiar

    Originally constructed between 1939 and 1941 as part of Franklin D. Roosevelt’s New Deal programs, the Bonneville to Hood River 115 kV Transmission Line required an infrastructure upgrade to remain re

    Sep 8, 2021

  • DFI
    East Boston Branch Sewer Relief Project: Support Of Excavation Case Study

    By Eric P. Bregman

    As part of an on-going effort to improve water quality and reduce discharge into Boston Harbor, the Massachusetts Water Resources Authority (MWRA) East Boston Branch Sewer Relief Project was designed

  • DFI
    East Boston Branch Sewer Relief Project: Support of Excavation Case Study (FULL Project)

    By Eric P. Bregman, Franklin M. Grynkewicz, John E. Regan

    "As part of an on-going effort to improve water quality and reduce discharge into Boston Harbor, the Massachusetts Water Resources Authority (MWRA) East Boston Branch Sewer Relief Project was designed

    Jan 1, 2017

  • DFI
    Murphy's Law And The Pile Prediction Event At The 2002 ASCE GeoInstitute's Deep Foundations Conference

    By Bengt H. Fetlenius

    The "Pile Prediction Event" at the ASCE GeoInstitute's Deep Foundation Conference in February 2002 involved prediction of drivability and capacity of three 14m long, 324mm diameter, closed-toe pi

    Jan 1, 2004

  • DFI
    Positive Cut-Off Wall in Indian Dam – A New Technique for Difficult Geology

    By Steni Stefani, Sanjay Dave

    "This paper describes an innovative method, used for the first time in India, for the construction of a 1.0metre-thick positive plastic concrete cut-off wall (CoW) at the upstream toe of the dam at th

    Jan 1, 2017

  • DFI
    Analysis Of A Deep Excavation In Calgary, Alberta

    By Thomas Lardner

    Excavation for The Bow, EnCana, in downtown Calgary, occurred between May 2007 and September 2008. A monitoring programme was used to determine the behaviour of the shoring wall, soil and bedrock dur

    Jan 1, 2010

  • DFI
    Drilled Pile Design and Installation Challenges in an Urban Environment

    By Satyajit Vaidya, Rudolph Frizzi, Luis Berroteran

    This paper presents design and construction challenges associated with a high-capacity rock-socketed drilled pile foundation system for a 60-story building recently constructed in an urban environment

    Jan 1, 2018

  • DFI
    Designing Piles for Seismic Events

    By H G. Poulos

    "This paper sets out a simplified approach by which the practical foundation designer can undertake the relevant calculations to satisfy the requirements for deep foundation design in seismic areas. T

    Jan 1, 1900