Kirkpatrick Street Pump Station Addition Excavation: Small Project, Big TwistBy James P. Stewart
This case history describes the engineering design and construction for the Contractor of a 35-ft-deep excavation for an 800-square-foot addition to an existing sewage pump station. The site posed une
Jan 1, 2003
-
Application Of Global Strain Extensometer (Glostrext) Method For Instrumented Bored Piles In MalaysiaBy Abdul Aziz Hanifah
A novel instrumentation and analysis technique, called GLOSTREXT method has recently been introduced for bored pile load tests in Malaysia. This technique provides an innovative and improved alternati
Jan 1, 2006
-
Damage To Initially Bent Piles ? SynopsisBy B. B. Broms
A method for calculating the bending moment induced in misaligned or bent piles is described, The maximum bending moment varies with the angular rotation between the pile segments, the coefficient of
Jan 1, 2010
-
A Case Study of Wet Soil Mixing for Bearing Capacity Improvement in TurkeyBy Arash Maghsoudloo, Asli Can
"Abstract This paper presents a ground improvement implementation case under a raft foundation of a local hospital. The selected ground improvement method is Wet Soil Mixing (WSM) technique. Soil mixi
Jan 1, 2014
-
Large Diameter Shafts - Youghiogheny Reservoir BridgeBy Paul J. Lewis
Estimation of the axial side shear resistance of drilled shaft rock sockets is directly related to the unconfined compressive strength of the bedrock. Commonly, the mean unconfined compressive strengt
Jan 1, 2005
-
Tied-Back Micropile Walls In Landslide RepairBy Kevin W. Cargill
In September 2004, Hurricanes Frances and Ivan caused the Pigeon River in western North Carolina to flood. This flooding eroded the embankment below Interstate 40 (I-40) and sent one of the eastbound
Jan 1, 2006
-
Wave Equation Analysis And Dynamic Monitoring - A Presentation At The Deep Foundations Institute?McGill University Symposium Montreal, September 1983By Bengt Fellenius
The conventional wave equation analysis without control of the representativeness of the parameters to the actual conditions does not provide accurate results. However, the representatives can be vast
Jan 1, 1984
-
Effects Of Helical Anchor Geometry On Long-Term Performance Of Small Wind Tower Foundations Subject To Dynamic LoadsBy Amy B. Cerato
The application of this study is to use helical anchors as a foundation system for small wind tower (1 ? 10 kW) guyed cables. Helical anchors are currently used to anchor guyed cables of telecommunic
Jan 1, 2008
-
The Effect Of Vertical Pile Loading On Subsequent Lateral BehaviourBy A. Lyndon
Vertical and lateral load tests were carried out on two 13 m deep bored cast-in-place instrumented piles, socketed into weathered sandstone. The first pile, 1200 mm in diameter, was loaded vertically
Jan 1, 1989
-
Drilled Shaft Design Optimization by Means of Static Load TestingBy Riad Diab
In 2018 the Caisse de Dépôt et Placement du Québec (CDPQ) awarded a $6.3 billion (U.S. dollars) design-build contract to the Joint Venture (JV) team NouvLR for the design and construction of one of th
May 1, 2022
-
Continuous Grouting In Embedding Of Sheet PilesBy Jouko L. Lehtonen
Sheet pile walls can be sealed watertightly using various methods. The objective of this paper is to introduce a new innovation comprising the use of continuous cement grouting during embedding. The m
Jan 1, 2006
-
Production And Testing Of 600 Reinforced-Concrete Piles For The Central Bank Of IraqBy H. Meseck
The new building of the Central Bank of Iraq in Baghdad was footed in difficult underground conditions on more than 600 reinforced concrete driven piles, with cross-sectional diameters of 45 x 45 cm a
Jan 1, 1989
-
Design Considerations For Underground Subway Station - IntroductionBy Mohammed Z. Islam
As cities are growing all over the world, the need for urban transportation facilities are on the rise. Designers (of these facilities) today are faced with a number of constraints for their design, o
Jan 1, 1993
-
List Of DelegatesAUSTRALIA CHAPMAN Gary JOHN WAGSTAFF CONTSRUCTIONS PTY. LTD. 1 Ashgrove Crescent 4060 ASHGROVE BRISBANE HILLAR Jaaes Director J.A. HILLAR & ASSOCIATES 99 Woolwich Road WOOLWICH,
Jan 1, 1994
-
High Risk Control For Piling And Deep Foundations - A Systematic ApproachBy Martin van Staveren
In today's rapid changing construction world, the business pressures on piling and deep foundations reach sky-high levels. Ever increasing complexity of construction projects do severely contribu
Jan 1, 2006
-
Some Problems Encountered During Pile Installation - SynopsisBy [D. N. ] Naresh
During different activities pile installation like pile boring, concreting etc., it is likely that various problems, depending up on site condition may be encountered. There are possibilities that som
Jan 1, 1996
-
Reliability Analysis Of Load Bearing Capacity Of Single Pile Placed Adjacent To Existing Buried Conduit Or Utility TunnelBy Amit Srivastava, Monica Malhotra
In a congested city or urban area, so called “lifeline of the city”, i.e. Gas, Electricity, telecommunication, as well as other utilities or facilities are supplied or transported underground through
Sep 1, 2022
-
Bored Piles With Base Preloading By Grouting - The Polish ExperienceBy Bolestaw A. Ktosihski
Preloading of bored pile bases by grouting is an effective way of reducing foundation costs. The bearing performance of a pile may be considerably improved. Various techniques and devices are used. Pr
Jan 1, 2006
-
O Street Anchored Precast Lagging And Soldier Pile Retaining WallBy John Wise
Significant movement to an existing slurry wall which serves as a retaining wall on 'O' Street in Southeast Washington, D.C. initiated the Department of Public Works for the District of Colu
Jan 1, 2003
-
Vibration-Free Driven Tubular-PilesBy S. Doombos
To convert the railway-bridge across the Oude Maas between Dordrecht and Zwijndrecht into a vertical lifting bridge, a drastic adaptation of the existing piers is necessary. Extra piles have to be pla
Jan 1, 1989