Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
Diamond Exploration Targets, Michipicoten Greenstone Belt, Wawa, OntarioBy A. C. Wilson
In 1991, local prospector C. ?Mickey? Clement recovered at least three alluvial diamonds from the Michipicoten River. Two of these stones were sent to the Department of Mineralogy, Royal Ontario Museu
May 1, 2003
-
Process Improvements at Bell Creek MillBy F. Flynn, P. Downey, G. Ritson
"Bell Creek Mill which has been in continuous operation since 1987 has undergone numerous operational changes in the past three years. The addition of over 2. 5 million tons of resource at over 13 git
Jan 1, 1997
-
Concepts for Remote Mineral ProjectsBy L. J. Vincze
The high cost of constructing mineral processing plants in remote locations warrants a close examination of the alternatives available for reducing the amount of on-site construction work. Among the a
Jan 1, 1980
-
Towards AG/SAG/ball mill on-line performance monitoringBy S. Caron, P. Radziszewski
Industrial practice in mineral processing shows that an important problem in understanding and monitoring in-mill parameters is due to the lack of fundamental knowledge and appropriate sensors. Howeve
Jan 1, 2004
-
A Geometallurgical Approach to Flotation Process Design Using Optimised Grade-Recovery CurvesBy D. Hatfield
"Flotation plants typically aim to maximise recovery at or above a target grade. As the ore from the mine varies, operators increase or decrease the mass pull in different flotation banks by adjusting
Jan 1, 2013
-
Cluff Lake Mill - Phase 2 ExpansionBy H. A. Schnell
"The Phase I Mill at Cluff Lake in northern Saskatchewan was designed to accommodate a very specific high grade uranium ore. As this high grade ore was depleted, construction was undertaken on a new m
Jan 1, 1985
-
“Energy Management Program”By K. H. B. Wenzl
"Since the autumn of 1973, the world's attention was captured by the startling revelation that conventional energy supplies were not inexhaustible but were in fact quickly dwindling with future shorta
Jan 1, 1978
-
A Strategy to Reduce the Consumption of Sodium Sulfide in Flotation of Molybdenite at the Sarcheshmeh Copper ComplexBy S. Banisi, M. Poorkani
The Sarcheshmeh copper deposit contains 1 billion tones of ore averaging 0.7% copper and 0.025% molybdenum. It is located southeast of Iran and currently processes 41,000t/d. Molybdenite as a by-produ
Jan 1, 2005
-
Investigation on Efficiency and Wear with the LCM Centrifugal MillBy Peter Mitschke, Friedrich Rosenstock, Heinrich Meiler
"The development of the Centrifugal Mill jointly by Chamber of Mines (Johannesburg) and LURGI GMBH (Frankfurt) had been described by L. Kitschen e.al. during the 14th IMPC at Toronto in October 1982.
Jan 1, 1985
-
Sampling and assaying of coarse gold at La Herradura–Minera Penmont S. de R.L. de C.V., MexicoBy S. Cossio, J. L. Noyola, R. Espinosa
"Minera Penmont’s La Herradura is a joint venture between Industrias Peñoles, S.A. de C.V. and Newmont Mining Corporation. The mine is located in the northern Mexican state of Sonora. La Herradura con
Jan 1, 2004
-
Prospecting the Future: Meeting Human Resources Challenges in the Canadian Minerals and Metals IndustryBy Ryan Montpellier, Paul Hebert
"Prospecting the Future: Meeting Human Resources Challenges in Canada's Minerals and Metals Sector is a comprehensive sector study of the short- and long-term human resource issues and challenges faci
Jan 1, 2007
-
Hydromet Piloting: What the Mineral Processor can expectBy Ronald Molnar
"High demand for metals is driving the exploitation of lower grade and more complex orebodies. These projects are often the initiatives of junior mining companies with limited financial resources. In
Jan 1, 2006
-
Process Control at Heath Steele Mines LimitedBy Mike Sapiro
"Heath Steele Mines is a base metal producer situated near Newcastle, N.B. presently treating 3500 TPD of complex Cu-Pb-Zn ore. The ore consists of massive fine grained sulfides averaging I. 1% Cu, 1.
Jan 1, 1977
-
Process Safety ManagementBy Ertugrul Alp
Alp & Associates - Who We Are ?? Canadian consulting company (1999-?) ?? Principal Consultant: Dr. Ertugrul Alp, P.Eng. ?? Over twenty-five years experience serving the chemical, mining, pulp & pap
May 1, 2008
-
Iron and steel making in the third millenniumBy J. P. Sancho, L. F. Verdeja, J. I. Verdeja
"This paper analyzes the present state of the different processes competing to keep their market shares within the future iron and steel business sector.The continuous transformations in the steel mak
Jan 1, 2002
-
Flotation at Les Mines SelbaieBy Adam Wright
"Les Mines Selbaie have been producing copper and zinc concentrates from the A-1 ore zone since 1986. This paper reviews major developments in flotation practice over that period. Firstly, ore blendin
Jan 1, 1995
-
Evaluating Multi Zone Ore Bodies of the Raglan Nickel Deposit using Current Planning Techniques Complemented by Real Option Pricing.By Bruno Lemelin
Falconbridge Ltd Raglan Mine has been in production since 1998 and has produced annually some 900 000T of ore grading 3.1% nickel, 0.9% copper and 0.06% cobalt. The mine is located in Nunavik, Norther
May 1, 2004
-
Au L3-edge XANES Analyses for spr-Au/Al2O3 CatalystBy S. Nagamatsu
Alumina supported gold catalyst prepared by spray reaction method (spr) provides gold particle with about 20 nm of diameter. The gold particle size is larger than conventional gold catalysts. However,
Oct 1, 2003
-
SPOC Project Software and ManualBy R. F. Pilgrim
"This first chapter of the SPOC Manual 1s intended as a general introduction to all the other chapters in which the mineral process evaluation and optimization methodology is presented. This chapter a
Jan 1, 1986
-
A Moveable Mineral Processing MiniplantBy P. Wells, P. Quinn
"A moveable flotation miniplant was designed and constructed at the research laboratory of Inco Technical Services Ltd. to address the need for flowsheet development with a limited amount of ore (such
Jan 1, 2003