Search Documents
Search Again
Search Again
Refine Search
Refine Search
-
Reducing the Cost of Drill and Blast Tunnel Work by Use of Tunnel Operations AnalysersBy Maidl B
A tunnel operations analyser is a new high technol- ogy instrument for use in underground work. By remotely sensing the acoustic emissions from operating machines and processes in a tunnel or shaft
Jan 1, 1987
-
Non-Destructive Testing of In Situ Underground Mine Seals - Initial Technology AssessmentBy C Harwood, EáWestman, K Luxbacher
Testing of in situ seals in underground coal mines is critical to determine seal integrity and to provide safe working conditions. In the wake of the 2006 Sago Mine explosion, the United States of Ame
Jul 1, 2013
-
Modelling Open Pit and Underground Production Scheduling in ConcertBy B King
A large number of mineral deposits contain regions in which it is economically beneficial to extract ore both via open pit and underground mining techniques. Current industry practice lacks an effecti
Nov 24, 2014
-
The relationship between the magnitude of impact velocity per impulse and cumulative absorbed energy capacity of a rock boltBy B Crompton, A Berghorst, G Knox
Laboratory-based dynamic testing provides an invaluable tool in the development of rock bolts for use in highly stressed, burst prone rock masses. While in most cases the laboratory-based test method
Nov 30, 2018
-
The EMESRT Approach to Equipment Design - Bringing End Users into the PictureThe Earth Moving Equipment Safety Round Table (EMESRT) was established by mining companies in 2006 to influence manufacturer's equipment design through a process of engagement. 2010 EMESRT member
Dec 6, 2010
-
Building and Maintaining Effective Project TeamsBy J A. Wells, K G. Thomas, R F. Dewhirst
"One of the contributing factors to the extreme cost escalation in the first decade of the 21st century was the increase in the amount and cost of engineering work that went into studies and projects.
Mar 8, 2016
-
Terranes, Tectonics and the Pacific RimThe movements of the major continental cratons and the distribution of the principal tectonostratigraphic terranes are reviewed in the Circum-Pacific region during Phanerozoic time. It is concluded th
Jan 1, 1990
-
A tailored solution to determine plant capacity using strategic analysisBy J Nortier, J Dray
There is no single factor that determines the appropriate capacity for a mining project. It is driven by the size of the resource, the capacity of the market, the availability of capital, the availabi
Jun 22, 2022
-
A Practical and Rigorous Approach for Integrating Sustainability Principles into Decision-Making Processes at Minerals Processing OperationsBy D Tuazon, M Powell, M Ziemski, G D. Corder
Although mining companies have made broad corporate-level commitments to adopt sustainability, there continue to be problems when attempts are made to adopt higher-level sustainability aspirations and
Jul 10, 2012
-
Can We Stop a Black Swan Breeding? Advances in Bowties and Critical Control ManagementBy M Andrew, H Reynolds, R Mills
As the global mining industry continues to grapple with ‘black swans’ (high consequence / low frequency events) for health, safety and environmental losses, the focus is shifting from risk assessment
Jun 22, 2016
-
Optimisation of Length of Retreat Longwall FacesBy Misra A
After review of the status of research on optirnisation of retreat longwall faces it is argued that an acceptable optimisation model must be based upon realistic cost data that take into account not o
Jan 1, 1995
-
Alluvial Mineral Property ValuationOutline of situations when valuations required - from capital raisings and takeovers, stamp duty, rates and capital gains tax, to probate and litigation between joint venture parties. Definition of t
Jan 1, 1992
-
Investigations on Lead Roasting at the Sulphide Corporation's Works at Cockle Creek, N.S.W.THE paper is principally eoncerncd with experimental work carried out the author whilst a number of the metallurgical staff at the Cockle Creek works. The metallurgical has been discussed sufficiently
Jan 1, 1924
-
Large Compact Bucket Wheel ExcavatorsMost compact bucket wheel excavators in use are in the small to medium range. Large compact bucket wheel excavators compete directly with con- ventional longer boom excavators which have operational
Jan 1, 1989
-
KEYNOTE: Upgrades, Modernisations and Expansions Where Will the Expertise, Capability and Skills Come from in the Future?By J King, T Hunter, R Coleman
"The industry that supports operations and new projects is suffering a rapid decline in the currently severely curtailed capital investment environment. This is evidenced by a decline in the number of
Oct 10, 2016
-
Managing Uncertainty on the Cut 8 ProjectBy G M. Jones, J Rademan
Debswana, owned by the Government of the Republic of Botswana (GRB) and De Beers in a 50:50 joint venture partnership, operates the Jwaneng diamond mine in Botswana - the most valuable diamond mine in
May 24, 2012
-
Rolling Mills finishing Processes AnalysisBy Atalla YM
Steel rolling mill product finishing pro cesses gradually become or often already are unsuited for current production and marketing conditions. Indications are made as to what has been done to (i)
Jan 1, 1975
-
Characterising Rock Mass Properties for Fragmentation ModellingBy A Scott, I Onederra
A great deal of technical and research effort has been applied to the development of models to predict fragmentation from rock blasting. A number of quite useful empirical or engineering models are cu
Aug 24, 2015
-
Molten slag flow in an ironmaking blast furnace – a mesoscopic level investigationBy D Sert, A Jayasekara, P Gardin, B J Monaghan, S J. Chew, P Zulli, D Pinson, X F. Dong, R Ferreira
In an ironmaking blast furnace (BF), molten slag and hot metal form in the softening-melting (cohesive) zone and then trickle through the coke packed bed before being discharged from the taphole. Duri
Jun 19, 2024
-
Modelling the Initial Pit Design - The First Step for Project ValuationBy R Wolff
One critical factor in open pit mining projects is the estimation of the recoverable reserves. The reason for this is that at the valuation stage there is a lack of information about future metal pric
Jan 1, 2006