Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    The relationship between the magnitude of impact velocity per impulse and cumulative absorbed energy capacity of a rock bolt

    By B Crompton, A Berghorst, G Knox

    Laboratory-based dynamic testing provides an invaluable tool in the development of rock bolts for use in highly stressed, burst prone rock masses. While in most cases the laboratory-based test method

    Nov 30, 2018

  • AUSIMM
    Technology Based Innovation - The Next Decade

    The minerals industry focus over much of the past twenty years has been on cost reduction and production growth supported, but not driven, by technology improvements. Mergers and acquisitions, and the

    Sep 13, 2010

  • AUSIMM
    Building and Maintaining Effective Project Teams

    By J A. Wells, K G. Thomas, R F. Dewhirst

    "One of the contributing factors to the extreme cost escalation in the first decade of the 21st century was the increase in the amount and cost of engineering work that went into studies and projects.

    Mar 8, 2016

  • AUSIMM
    Cemented Fill Practice and Research at Mount Isa

    This paper considers three aspects of cemented fill practice and research in Mount Isa. Firstly, an account is given of the use of Portland cemented hydraulic fill, considering mainly the role and s

    Jan 1, 1980

  • AUSIMM
    Reducing the Cost of Drill and Blast Tunnel Work by Use of Tunnel Operations Analysers

    By Maidl B

    A tunnel operations analyser is a new high technol- ogy instrument for use in underground work. By remotely sensing the acoustic emissions from operating machines and processes in a tunnel or shaft

    Jan 1, 1987

  • AUSIMM
    A tailored solution to determine plant capacity using strategic analysis

    By J Nortier, J Dray

    There is no single factor that determines the appropriate capacity for a mining project. It is driven by the size of the resource, the capacity of the market, the availability of capital, the availabi

    Jun 22, 2022

  • AUSIMM
    A Practical and Rigorous Approach for Integrating Sustainability Principles into Decision-Making Processes at Minerals Processing Operations

    By D Tuazon, M Powell, M Ziemski, G D. Corder

    Although mining companies have made broad corporate-level commitments to adopt sustainability, there continue to be problems when attempts are made to adopt higher-level sustainability aspirations and

    Jul 10, 2012

  • AUSIMM
    The EMESRT Approach to Equipment Design - Bringing End Users into the Picture

    The Earth Moving Equipment Safety Round Table (EMESRT) was established by mining companies in 2006 to influence manufacturer's equipment design through a process of engagement. 2010 EMESRT member

    Dec 6, 2010

  • AUSIMM
    Can We Stop a Black Swan Breeding? Advances in Bowties and Critical Control Management

    By M Andrew, H Reynolds, R Mills

    As the global mining industry continues to grapple with ‘black swans’ (high consequence / low frequency events) for health, safety and environmental losses, the focus is shifting from risk assessment

    Jun 22, 2016

  • AUSIMM
    Terranes, Tectonics and the Pacific Rim

    The movements of the major continental cratons and the distribution of the principal tectonostratigraphic terranes are reviewed in the Circum-Pacific region during Phanerozoic time. It is concluded th

    Jan 1, 1990

  • AUSIMM
    Investigations on Lead Roasting at the Sulphide Corporation's Works at Cockle Creek, N.S.W.

    THE paper is principally eoncerncd with experimental work carried out the author whilst a number of the metallurgical staff at the Cockle Creek works. The metallurgical has been discussed sufficiently

    Jan 1, 1924

  • AUSIMM
    Optimisation of Length of Retreat Longwall Faces

    By Misra A

    After review of the status of research on optirnisation of retreat longwall faces it is argued that an acceptable optimisation model must be based upon realistic cost data that take into account not o

    Jan 1, 1995

  • AUSIMM
    Managing Uncertainty on the Cut 8 Project

    By G M. Jones, J Rademan

    Debswana, owned by the Government of the Republic of Botswana (GRB) and De Beers in a 50:50 joint venture partnership, operates the Jwaneng diamond mine in Botswana - the most valuable diamond mine in

    May 24, 2012

  • AUSIMM
    KEYNOTE: Upgrades, Modernisations and Expansions Where Will the Expertise, Capability and Skills Come from in the Future?

    By J King, T Hunter, R Coleman

    "The industry that supports operations and new projects is suffering a rapid decline in the currently severely curtailed capital investment environment. This is evidenced by a decline in the number of

    Oct 10, 2016

  • AUSIMM
    Characterising Rock Mass Properties for Fragmentation Modelling

    By A Scott, I Onederra

    A great deal of technical and research effort has been applied to the development of models to predict fragmentation from rock blasting. A number of quite useful empirical or engineering models are cu

    Aug 24, 2015

  • AUSIMM
    Molten slag flow in an ironmaking blast furnace – a mesoscopic level investigation

    By D Sert, A Jayasekara, P Gardin, B J Monaghan, S J. Chew, P Zulli, D Pinson, X F. Dong, R Ferreira

    In an ironmaking blast furnace (BF), molten slag and hot metal form in the softening-melting (cohesive) zone and then trickle through the coke packed bed before being discharged from the taphole. Duri

    Jun 19, 2024

  • AUSIMM
    Alluvial Mineral Property Valuation

    Outline of situations when valuations required - from capital raisings and takeovers, stamp duty, rates and capital gains tax, to probate and litigation between joint venture parties. Definition of t

    Jan 1, 1992

  • AUSIMM
    Large Compact Bucket Wheel Excavators

    Most compact bucket wheel excavators in use are in the small to medium range. Large compact bucket wheel excavators compete directly with con- ventional longer boom excavators which have operational

    Jan 1, 1989

  • AUSIMM
    Using Life Cycle Assessments and Multi-Criteria Decision Analysis Models for Ex Ante Sustainability Assessment

    By G A. Blengini, S V. èolar

    The minerals industry is faced with choices beginning in the exploration phase and extending over the life cycle of the mine. Firms examine the technical feasibility of alternative actions and typical

    Jan 1, 2009

  • AUSIMM
    Modelling the Initial Pit Design - The First Step for Project Valuation

    By R Wolff

    One critical factor in open pit mining projects is the estimation of the recoverable reserves. The reason for this is that at the valuation stage there is a lack of information about future metal pric

    Jan 1, 2006