Wireless Site Data Collection In Construction And Its Impact On The Business ProcessBy Jason N. Scott
It is now possible using low-cost wireless technology and rugged hand-held devices to record data on site electronically and for that data to be instantly available to others. This could potentially e
Jan 1, 2006
-
Improvements In Deep Compaction Using Vibratory Pile HammersBy Dennis Nottingham
Increased interest in seismic soil liquefaction and preventative soil stabilization sets the stage for improved deep compaction methods using pile driving techniques. In 1971 L.B. Foster Company perso
Jan 1, 2004
-
Design Equations For Laterally Loaded Piles Embedded In SandBy T. G. Davies
The paper presents design equations for singly laterally loaded piles embedded in sand. These equations were obtained from a comprehensive nonlinear analysis of free and fixed head piles subjected to
Jan 1, 2010
-
Fundamental Issues Of Displacement Auger Piling: The European PerspectiveBy Maurice Bottiau
When dealing with displacement auger piling, some general and fundamental issues have to be considered, irrespective of the system. More than with other pile types, the interplay between the soil cond
Jan 1, 2003
-
Earth Pressure Acting On Single Driven Piles In SandBy Adel Hanna
Earth pressure acting on piles driven in sand is playing a major role in estimating pile capacity. In literature, researchers entertained simplifying assumptions in estimating the earth pressure actin
Jan 1, 2003
-
Pile Foundations For Algiers New Airport TerminalBy Ramdane Bahar
The new Algiers airport building is a reinforced concrete building of more than 80 thousand square meters of floor slabs. It is located at Dar-EI-Beida, near the old passenger terminal, about 20 km ea
Jan 1, 2002
-
Challenges And Recommendations For Quality Assurance Of Deep FoundationsBy Frank Rausche
Although Quality Control (QC) during construction is preferable for deep foundations, there are many instances when it is necessary to resort to Quality Assurance (QA) methods if, for various reasons,
Jan 1, 2008
-
Concrete Piles Driven In A Coral SandBy L. D. Johnson
12 groups of 12 precast prestressed (PCPS) piles were driven in the lagoon of Kwajalein Island to support a dry dock. Pre-construction investigation of the calcareous coral sands and static pile loeid
Jan 1, 1993
-
Numerical Analysis Of The Osterberg Cell Loading TestBy Brunella Recinto
Pile loading tests are carried out with two main objectives: 1) evaluating the ultimate resistance; 2) checking the behaviour of the pile under live load. In the first case and particularly for large
Jan 1, 2003
-
Dynamic Lateral Response Of A Full-Scale Pile GroupBy Kyle M. Rollins
To improve our understanding of lateral resistance of pile groups, a series of lateral load tests were performed on a full-scale pile group using both static and dynamic loads. The pile group consiste
Jan 1, 2002
-
Suwanee American Cement Plant, Branford, Florida: A Case Study Of Large Diameter Continuous Flight Auger Design Build FoundationsBy Gordon King
This paper presents a case study of large diameter continuous flight auger (CFA) piles and drilled shafts utilized for foundation support of a series of heavily loaded cement plant structures at the S
Jan 1, 2003
-
Torque Correlation Factors For Round Shaft Helical PilesBy Donald A. Deardorff
The capacity of a helical pile can be determined analytically using the individual bearing or cylindrical shear methods which are dependent on soil strength parameters and helical bearing area. The t
Jan 1, 2007
-
Augered Cast-In-Place Pile Installation, Grand Forks, North DakotaBy Kyle A. Kershaw
The City of Grand Forks, North Dakota obtains drinking water from both the Red River and Red Lake River through a system of raw water intakes, shallow pipelines, and pump stations. However, during flo
Jan 1, 2003
-
Transverse Isotropy Effects On P-Y Curves For RockBy Ehab S. Shatnawi
It is common in practice to design laterally loaded rock-socketed drilled shafts using the p-y curve methods. However, the existing p-y curve criteria for rock were derived either semi-empirically or
Jan 1, 2007
-
Surprises And Solutions When Driving Piles In Mountain Valleys Of VermontBy John E. Lens
Driving bridge foundation piles into glacio-fluvial sands and gravels and glacial tills brought surprisingly longer than predicted driving lengths on several recent projects in Vermont. In some insta
Jan 1, 2007
-
Experiences From A Large Scale Driven Precast Piling Project In IndiaBy Rajesh A. Vaidya
A large scale piling work is undertaken in India for an important fast track industrial project. Thousands of solid square precast concrete piles are driven to depths of around 50m. Soils encountere
Jan 1, 2007
-
Large Diameter Pile Driving, Acceptance And Soil-Pile Setup New East Span San Francisco-Oakland Bay BridgeBy Saba Mohan
This study presents results based on the Pile Installation Demonstration Project (PIDP) that was conducted as a part of the East Span San Francisco-Oakland Bay Bridge Seismic Safety Project. For the t
Jan 1, 2002
-
Drilling And Grouted Pipe Pile Foundation For Department Of Energy Spallation Neutron Source Target Building, Oak Ridge, Tennessee ? IntroductionBy Ronald E. Walkington
The U.S. Department of Energy (DOE) is building the world's newest accelerator-based, pulsed-neutron system, called Spallation Neutron Source (SNS). The facility, located in Oak Ridge, Tennessee,
Jan 1, 2001
-
I-880 Replacement Project (Cypress Freeway) Large Diameter Driven Pipe Pile Foundations Test Program And Construction - Implementation Of Test Results - ImplementationBy Darrell L. Beddard
The test program information provided for some immediate changes on the upcoming contracts and in contract administration for the I-880 Replacement Project. Plan sheet modifications included changes t
Jan 1, 1996
-
Seasonal Strain Distributions in Full-Scale Energy Foundations (720c13b2-b754-45d9-8b84-e88f10ec05b5)By Kyle Murphy, John S. McCartney
This paper focuses on the seasonal thermo-mechanical response of two energy foundations installed at the new Denver Housing Authority Senior Living Facility in Denver, Colorado. The two drilled shaft
Jan 1, 2017