Search Documents

  • DFI
    Ground Freezing For Shoring Of Excavations - A Case History: 1405/SR522 Vault NW-6

    By Daniel Mageau

    Ground freezing has been used for over 100 years to provide shoring and ground water cutoffs for hundreds of projects worldwide, including drilled shafts, tunnels and cofferdams. Typically, these case

    Jan 1, 1998

  • ISEE
    Methods to Quantify Drilling Accuracy

    By Tristan Worsey, Nathan Rouse, Kyle Hall

    Drilling accuracy is the foundation to any successful blast operation. Even the best blasting practices cannot overcome poor drilling and still obtain desired results. Inaccuracies in boreholes can re

    Jan 1, 2018

  • AUSIMM
    Kriging and Geostatistics: A Review of the Literature Available in English

    By Reeves M

    A review of the literature available in English on kriging and geostatistics is given with the references cross-classified by their subject matter for convenience and ease of use.

    Jan 1, 1979

  • SME
    Tamerlane Hoist And Vertical Belt Project

    By Shawn Collins

    BACKGROUND The history of the Pine Point Mine is a rich one. This property once boasted one of the largest and most profitable lead-zinc mines in Canada's long and storied mining history. The Pi

  • SME
    Review And Applicability Of Yielding Support Systems For Bump Prone Coal Mines In The Western United States - Preprint 09-027

    In bump-prone coal mines, roof and rib support is subject to dynamic as well as static loading. Although less frequently encountered, the dynamic loading component can result in violent coal expulsio

    Jan 1, 2009

  • TMS
    Converter Modernization And Operational Improvements At The Pirdop Smelter

    By William A. Enrico

    Umicore acquired the Pirdop Smelter in a privatization offering by the Bulgarian government in September 1997. Since that time, an investment program has been conducted to increase capacity to 225 00

    Jan 1, 2005

  • SAIMM
    Hydraulic mining of an in situ heavy mineral ore reserve

    By M. Berger

    The ‘Metallurgical Operations’ Department of Grinaker-LTA Process Engineering (GLTA) currently undertakes then primary mining as well as the re-deposition of tailings forTicor South Africa (Ticor) at

    Jan 1, 2003

  • AUSIMM
    Geology and the Search for Mineral Deposits

    For the purposes of this discussion it is assumed that contributors should express the thoughts that arise from their personal experience. So wide is the range of mineral deposits, and so varied the m

    Jan 1, 1950

  • SAIMM
    Development Of High Resolution 3D Vertical Seismic Profiles - Synopsis

    By C. C. Pretorius

    3D seismic surveys have become a well-accepted method of imaging sub-surface geology in the Bushveld Basin. Because both the seismic sources and receivers are placed at surface, most surveys are limit

    Jan 1, 2011

  • ABM
    Recuperação De Calor Na Sinterização: Uma Alternativa Viável Para Geração De Energia Térmica E Aumento Da Eficiência Global Da Planta

    By Joaquim Luiz Monteiro Barros

    Este trabalho tem como objetivo principal apresentar de forma didática e com um exemplo prático a viabilidade da aplicação da tecnologia de recuperação de calor no sinter cooler, com a finalidade de g

    Aug 17, 2017

  • AUSIMM
    Removal of Horizontal Level Pillar by Means of Blast Hole Diamond Drilling at New Occidental Gold Mine, Cobar, N.S.W.

    By Creelman C. A

    The removal of a horizontal piIlar between Nos. 9 and 11 levels (1,116 feet from the collar of main shaft) was successfully carried out by blast hole drilling, and, to the best of the authors' kn

    Jan 1, 1944

  • CIM
    The McClean Lake Operation COGEMA Resources Inc. JEB Mill Process Description and Commissioning

    By Art Carino

    "The McClean Lake operation is located in the Eastern Shore of the Athabasca Basin in northern Saskatchewan some 700-air kilometers north of Saskatoon. It is operated by Cogema Resources Inc., the maj

    Jan 1, 2001

  • AUSIMM
    Some Features of Lead Blast-Furnace Operations at the Works of the Broken Hill Associated Smelters Pty. Ltd., Port Pirie, S.A.

    The discussion which followed the publication of my paper by the formert has, I think, enhanced its value. It may therefore be of interest to members of our Australasian Institute, who are not members

    Jan 1, 1932

  • SME
    Development of a new fine particle dry separator Mining, Metallurgy and Exploration

    By M. K. Mohanty, H. Akbari, L. A. Ackah

    Dry separation was the predominant method of coal cleaning in the United States from the 1930s to 1980s. The application peak of dry separators for cleaning raw coal was in 1965, when about 23.1 Mt of

  • AUSIMM
    Creative Tension: Environmental Issues and Resource Development

    All development proposals have to run the gauntlet of the approvals process. Major resource projects are generally subject to particularly intense scrutiny. The key element in the approvals process

    Jan 1, 1992

  • NIOSH
    OFR-38-82 Development Of Guidelines For Installation And Maintenance Of Mine Illumination Systems

    By K. L. Whitehead

    An examination of 60 mines, 11 illumination hardware manufacturers, and Q mobile face-equipment manufacturers was conducted to determine the state of the art of mine-illumination hardware, define ligh

    Jan 1, 1981

  • AUSIMM
    Electrokinetic Properties of the Zinc Sulphide-Water and Nickel Sulphide-Water Interfaces

    By Healy T. W, Dixon D. R

    The present study 'of pure ZnS and NiS and ZnS (marmatite) by detailed electrokinetic methods has shown that by careful control of experimental parameters much new' information on sulphide-w

    Jan 1, 1977

  • NIOSH
    OFR-93-76 Research Study Of Retreat Surface Area Mining Systems ? Introduction

    1. Proposals were submitted to the Western Administrative Center of the US Bureau of Mines, Denver, Colorado on 30th December, 1974 and Contract No J 0255003 was awarded, the effective date being 8th

    Jan 1, 1976

  • SAIMM
    Determination Of Optimal Cut-Off Grade Policy To Optimize NPV Using A New Approach With Optimization Factor

    By A. Bascetin

    One very important aspect of mining is deciding what material in a deposit is worth mining and processing, versus what material should be considered waste. This decision is summarized by the cut-off g

    Jan 1, 2007

  • SME-ICGCM
    Experimental Study Of Line Electrode Method To Detect Underground Cavities

    By F. Ziaie

    Line electrical resistivity method using physically infinite distance between current line electrodes is proposed to determine the location of mine workings. In this method at least three line electro

    Jan 1, 1989