Search Documents

  • SAIMM
    The Evaluation Of The AAC Pump-Cell Circuits At Anglogold?s West Wits Operations

    By J. Rogans

    This paper discusses the comparative performances of the three activated carbon adsorption circuits at the West Wits operations of Anglogold. These circuits consist of two pump-cell circuits (at Two P

    Jan 1, 2002

  • DFI
    Upgrading Projects of Existing Infrastructures by Steel Piles – Press-in Method and Implant Structure

    By Tsunenobu Nozaki

    "AbstractThe PRESS-IN METHOD is widely recognised as “an environmentally friendly piling method”. However, this characteristic is only one of the fundamental advantages of the method and this paper pr

    Jan 1, 2014

  • DFI
    Mission Valley Viaduct Piledriving - 1998 DFI Conference Seattle, Washington October 8, 1998

    By David A. Jack

    The Mission Valley Viaduct is located in San Diego, California. This structure is the intersection of Interstate 8 and 805. The project consists of the main viaduct, 8 connecting ramps, and one highwa

    Jan 1, 1998

  • SME-ICGCM
    Time-Lapse Tomography of A Longwall Panel: A Comparison of Location Schemes (919eac95-0539-40b5-9304-f250d4890ab6)

    By Kray Luxbacher

    Three-dimensional time-lapse velocity tomograms were generated to image stress redistribution around a longwall panel to produce a better understanding of the mechanisms that lead to ground failure.

    Jan 1, 2007

  • SME
    From The Micro To The Macro Scale: A Textural And Chemical Perspective Of Characterizing Waste-Rock Material

    By H. Lowers, P. Hageman, S. Diehl, D. Fey

    Understanding relationships between mineralogy, texture, microstructural features, and element distribution and residence in minerals, is critical for accurate modeling of mineral weathering in waste-

    Jan 1, 2007

  • AUSIMM
    Statistical Methods for Economic Evaluation of a Coal Seam

    Six simulations by the Mpnte Carlo method employing both classical and geostatistical techniques are presented for the determination of the probability distribution of the in situ value of a coal seam

    Jan 1, 1983

  • SME
    Downsizing Maintenance to Improve Performance: Defining the Downsizing Task

    By Paul D. Tomlingson

    Editor's note: This is the first of two articles on maintenance. Part two, "Effective maintenance downsizing techniques," will appear in the October issue of MINING ENGINEERING. Most mine mana

    Jan 1, 1994

  • AUSIMM
    Mineralogy of the Green Leader Gold Ore at Kalgoorlie, Western Australia

    Concentrations of bright green material in the "Golden Mile" of Kalgoorlie, which carry particularly high gold values, are known locally as "green leader".This assemblage consists

    Jan 1, 1977

  • AIME
  • AUSIMM
    North Island Epithermal Gold: Processes of Mineralisation

    By J V. Lawless

    Mineralisation processes in epithermal deposits in the North Island of New Zealand are best illustrated by considering the two most productive deposits: Waihi and the Thames Bonanza Zone (TBZ), which

    Jan 1, 1997

  • AUSIMM
    Paper No. 177. The Treatment of Sulphide Ores in Victoria.

    FOR many years past it has been the practice at the Bairnsdale School of Mines to treat any parcels of auriferous concentrates sent in from the surrounding district by roasting them in a handworked re

    Jan 1, 1909

  • IIMP
    Aplicación de un sistema de gestión estratégico en las operaciones de la mina San Rafael – MINSUR. S. A

    By Juan Lizana

    El presente trabajo describe el proceso del sistema de gestión estratégica en la mina San Rafael, Puno. En este sentido, la empresa como parte introductoria de sus operaciones, ha propuesto la solució

    Sep 12, 2005

  • AUSIMM
    The Application of Sodium Peroxide Sintering Techniques to the Analysis of Minerals and Rocks by Atomic Absorption Spectroscopy

    Techniques have been developed for the dissolution of a wide range of rocks and minerals by a sodium peroxide sinter process. A olarge number of elements are determined by atomic absorption spectrosco

    Jan 1, 1974

  • AIME
  • SME
    Emergency Repairs to Beach Interceptor Tunnel

    By David Jurich, Joseph N. McDivitt

    INTRODUCTION South Coast Water District (SCWD) operates the Beach Interceptor Sewer Tunnel(BIST) in South Laguna, Orange County, California between Monarch Beach and Aliso Beach (Figure 1). The 10,

    Jan 1, 2007

  • CIM
    The Greenhills surface coal mining project

    By Clifford Britch

    "Kaiser Resources Ltd. has completed feasibility studies resulting in approval of $277,500,000 for the construction of the Greenhills Surface Coal Mine, located 35 km north of Sparwood, B.C. The mine

    Jan 1, 1981

  • AUSIMM
    The Use and Abuse of Feasibility Studies

    By N Cusworth

    The development of a resource project inevitably requires the investigation of a vast range of issues across most engineering disciplines û mining, metallurgical, chemical, civil, electrical, mechanic

    Jan 1, 2007

  • AUSIMM
    Ore-Treatment Plant and Treatment Operations-Edna May Gold Mining Company N.L., Westonia, W.A.

    NATURE OF ORETHE Edna May ore consists mainly of clean quartz of a moderately hard and tough nature. The gold content is "free" and fairly coarse, so that a large percentage is recovered by

    Jan 1, 1919

  • CIM
    Advanced Control for Column Flotation

    By G. A. Kosick, G. S. Dobby

    "This paper presents the principles and application of a recently developed control system for flotation columns and column circuits. The control system uses triple pressure sensors to directly sense

    Jan 1, 1990

  • AIME
    Reservoir Engineering - General - The Heat Efficiency of Thermal Recovery Processes

    By M. Prats

    Most of the information available on the heat efficiency of hot fluid injection processes, both water and steam, has been obtained from calculated temperature distributions in the pay zone and adjacen

    Jan 1, 1970