Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
Computer-Based Training: An Individualized Approach For Training Miners, Maintenance Personnel, Equipment Operators and ManagersBy John C. Harkey
The paper shares programs that presently use the CDC PLATO System to train individuals in industry. A short history of PLATO development; as a training system is presented with reflection on the major
Jan 1, 1979
-
Comparative Economics Of Advanced Fine Coal Cleaning In Refuse Pond Recovery And Active Mine ApplicationsBy H. Sevim, M. K. Mohanty, Y. P. Chugh
The economics of “Conventional” and “Advanced Fine Coal Cleaning” (AFCC) circuits for refuse pond reclamation as well as active mine/preparation plant applications have been evaluated. The benefits o
Jan 1, 2002
-
Meeting Quality Specifications Of A Coal On A Per Car BasisCoal that meets customer specifications is often stored in silos before being loaded into cars. It is often found that coal in a particular car does not meet customer specifications due to the mixing
Jan 1, 2000
-
Sonic drilling at Rio Tinto’s ilmenite deposit in MadagascarBy Daniel Saint Don, Jacques Dumouchel
QIT Madagascar Minerals (QMM)’s heavy mineral sand deposit located near the Village of Fort Dauphin, Madagascar was recently drilled using Boart Longyear Company’s Mini-Sonic drill. Continuous sand c
Jan 1, 2005
-
New Mining Districts in MexicoBy Leonel Lopez
Throughout Mexican history, mining has been an important, traditional activity. Before the "Discovery of America," native miners worked a variety of deposits throughout the country, including Mixtec g
Jan 1, 1994
-
Surface Thermodynamics And Extended DLVO Theory Of Leptospirillum Ferrooxidans Cells? Adhesion On Sulfide MineralsBy A. Vilinska
The adhesion of Leptospirillum ferrooxidans bacterial cells onto the sulfide minerals pyrite and chalcopyrite was evaluated using two different physical-chemical approaches; thermodynamic and extended
Jan 1, 2011
-
Exploration Of Exmibal's Nickel Laterite Deposits In GuatemalaBy H. O. Harju
Inco acquired majority interest in the nickel laterite concessions in eastern Guatemala in 1960 and, through its subsidiary Exmibal, extensively explored the deposits until 1965 to define the site for
Jan 1, 1979
-
Effectiveness of a water curtain utilized for dust control on continuous miner sectionsThe Mine Safety and Health Administration (MSHA) conducted a respirable dust survey to evaluate the effectiveness of a water curtain utilized for dust control on continuous miner sections. The purpose
Jan 1, 2009
-
Inconsistency in gravimetric sampling pumps and cyclonesBy R. J. R. Cornelissen
The elimination of the incidence of silicosis in employees in industries such as mining and pottery is an ongoing international initiative. After many decades of industrial activity in these industrie
Jan 1, 2009
-
Industry Technologies Featured at MPES MeetingThe development of technologies to improve mining and mineral processing is an ongoing process. These new technologies are the result of the industry’s drive to lower costs and improve productivity.
Jan 1, 2006
-
Planning And Design Features Of The Waller Creek Tunnel, Austin, TexasBy Gary Jackson
Preliminary engineering for the Waller Creek Tunnel was completed in 2001, but the project was held in abeyance until the summer of 2007. This paper describes several features of the revised design, w
-
Techniques for Assessing and Mitigating Longwall Subsidence Effects on Highway Bridges Mining, Metallurgy and ExplorationBy Yi Luo, Jian Yang, Hua Jiang
Surface subsidence events induced by underground longwall coal mining operations can cause various disturbances to surface structures ranging from integrity and stability to functionality problems. Hi
-
Aggregate Plant Inventory Management Through HMA Mix Optimization - Preprint 09-097By K. Awuah-Offei
An aggregate plant may have difficulty balancing product stockpile inventories if hot mix asphalt (HMA) design engineers do not account for aggregate inventory during mix design. Yet HMA design engine
Jan 1, 2009
-
Project Delivery Selection For Southern Nevada?s Lake Mead Intake No. 3By Michael Feroz
Severe drought in the Colorado River Basin over the past 10 years has caused water levels to drop in Lake Mead by more than 113 feet. The current lake level is at elevation 1,112 feet mean sea level (
-
Linear Programming Optimization Of Asphalt Mix Design - Preprint 09-032By K. Awuah-Offei
The objective of asphalt mix design is to produce a mix with optimal performance using available aggregate stockpiles. Often, this process does not take into consideration aggregate plant stockpile in
Jan 1, 2009
-
Evaluation On The Structure-Activity Relationship Of Copper Sulfide Collectors By DFT InvestigationThe molecular structures of isobutyl xanthate (IBX), diisobutyl dithiophosphate (DIBDTP), O-isobutyl-N-ethyl thionocarbamate (IBETC), O-isobutyl-N-ethylcarbonyl thionocarbamate (IBECTC) and O-isobutyl
Feb 27, 2013
-
A Numerical Analysis Of The Effects Of Weak Floor Strata On Longwall Face Ground ControlBy Y. P. Chugh, J. Ma
Higher production, better safety standard, and potential for automation are some of the benefits of longwall mining. Today, longwall face advances at a faster rate exposing many diversified rock layer
Jan 1, 2000
-
Gold Fields La Cima Cerro Corona Project Building For Perú’s FutureBy R. Graeme, J. Komadina
Gold Fields acquired an option to purchase the Cerro Corona Project, located in Hualgayoc, Cajamarca Department, Perú, in December 2003. In January 2006, the option was taken up and the transaction c
Jan 1, 2007
-
Pilot Study On The Influence Of The Eccentric Speed On Cone Crusher Production And OperationBy D. Jacobson
There are many different machine setup parameters and variables that affect the production of cone crushers in a mineral processing plant. One of these variables is the eccentric speed at which the co
Feb 27, 2013
-
Technical Note - SO2 abatement in a 440-kW pilot-scale combustor —limestone injection testsBy G. H. Lewis, C. L. Krcil, N. S. Harding, D. E. Havekotte
Introduction Limestone injection work was completed in a 440-kW (1.5-million Btu per hour) pilot-scale combustor in preparation for a 50,000-kg/h (110,000-lb per hour) industrial steam boiler limes
Jan 12, 1986