Planning And Design Features Of The Waller Creek Tunnel, Austin, Texas

- Organization:
- Society for Mining, Metallurgy & Exploration
- Pages:
- 10
- File Size:
- 219 KB
- Publication Date:
Abstract
Preliminary engineering for the Waller Creek Tunnel was completed in 2001, but the project was held in abeyance until the summer of 2007. This paper describes several features of the revised design, which required significant changes from the original concept. Most notable is the expected replacement of a tunnel boring machine (TBM) by conventional tunneling. The considerable influence of geological conditions on the tunnel vertical alignment is discussed, in particular the impact of the zones of Eagle Ford Shale with swelling potential. Other features which are described include the wide span tunnels and large diameter shaft requirements.
Citation
APA:
Planning And Design Features Of The Waller Creek Tunnel, Austin, TexasMLA: Planning And Design Features Of The Waller Creek Tunnel, Austin, Texas. Society for Mining, Metallurgy & Exploration,