Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
New Methodology for Calculating Dynamic PressureBy Jorge Cárdenas, José Luis Hurtado
The critical distance determination test through direct recording for the mine in Phase 03 was carried out in January 2024, and in it the vibration and pressure models were obtained for the Sedimentar
Jan 21, 2025
-
The Investigation Of Establishing The National Damage Criteria For Blast-induced Ground Vibrations In TurkeyBy Gungor Tuncer, Ali Kahriman, Abdulkadir Karadogan, Umit Ozer
The environmental problems such as vibration, and air blast are often faced, and discussed on mining, quarrying, civil constructions, shaft-tunnel, pipeline, and dam operations where blasting is inevi
Jan 1, 2010
-
Low Powder Factor Blasting to Take Advantage of Natural Rock Fissures is UneconomicalBy R. F. Favreau, Patrice Favreau
In many quarries and construction sites visited by the authors over the last 50 years, the latter have observed muck piles from blasting with explosives, which included numerous large blocks, in some
Jan 1, 2018
-
The Effect of Charge Mass and Delay Timing on Airblast OverpressureBy Adrian Moore, Dominic Hooton, Alan Richards
Significant factors affecting airblast overpressure (AOP) emissions include charge mass per delay, distance from the blast site, burden, stemming height, and delay timing, topographic shielding, and m
Jan 21, 2025
-
Integration of Mine Resources in the Optimization of Shot DocumentationBy Kyle Apple
The following is a case study of how LuckStone Corporation improved their blast monitoring and documentation program. A number of resources already at their disposal have been utilized to improve the
Jan 1, 2001
-
Case Studies Using the Multiple Blasthole Fragmentation (MBF) Model at Open Pit Mines in CanadaBy Scott King, Norm Patterson, Ruilin Yang
The multiple blasthole fragmentation (MBF) model developed by Orica models the contributions from multiple blastholes to fragmentation at any given point in the rock and simulates a production blast w
Jan 1, 2018
-
Ring Blasting Design Modeling and OptimizationBy María Rocha, Benjamín Cebrián, Roberto Laredo
"Ring blasting designs have to achieve different goals in order to become efficient whether is done in up hole or downhole fashion. Ore recovery/dilution control, fragmentation and drift integrity all
Jan 1, 2017
-
Case Study: Systematically Improving Drilling and Blasting Operations in Hard-Rock MinesBy Reinhold Daykin, Piers Wendlandt, Nathan Rouse
Drilling and blasting are key components of every hard-rock (i.e., metal/nonmetal/coal) mining operation. Well-executed and maintained drilling and blasting can have a major positive impact on the ove
Feb 1, 2020
-
Hole Diameter: Does it Affect Vibration Attenuation?By Tyler Acorn, Paul Worsey, Nathan Rouse
The effect of the hole diameter on vibration attenuation has not been incorporated in most vibration models in the blasting industry. In current vibration models, the charge weight and the distance fr
Jan 1, 2013
-
Rock Fragmentation Modeling Using a Neural Network-Based Approach in a Gold Open Pit MineBy Cesar Guerra, Alejandro Rojas, Dr. Jhon Silva, Luis Velasquez
The ANN method is applied to predict the P_80 size in one open pit gold mine in Peru. The ANN was implemented in Matlab programming language, and the results from the ANN are compared with data obtain
Feb 1, 2020
-
Use of Electronic Initiation System in Urban Shaft Sinking ProjectBy Richard Turnbull, James Purssey
"The Northconnex Project is a twin nine kilometre tunnel in Sydney, Australia, linking the M1 PacificMotorway at Wahroonga to the Hills M2 Motorway at West Pennant Hills. Access to the tunnels will be
Jan 1, 2017
-
Blasting a Diversion Tunnel through the Abutment of a "Meta-Stable" DamBy Jennifer Williams, Donald J. Berger
Originally built between 1913 and 1916, the Ashton Dam & Hydroelectric Facility has experienced various seepage and piping incidents since completion. Ashton Dam is located within 15 miles (24 km) of
Jan 1, 2014
-
Tunneling in Thinly Foliated Rockmass ConditionsBy H. S. Venkatesh, G. Gopinath, R. Balachander, G. C. Naveen
Punatsangchu Hydroelectric Project Authority is constructing 1020 MW underground hydroelectric project in Bhutan. The project envisages construction of concrete dam, Desilting Chamber, Head Race Tunne
Feb 1, 2020
-
A High=Preformance Vibration Monitoring and Data Distribution System for Large-Scale Urban Development ProjectsBy Robert Lee, Pertti Paavola
Automated vibration monitoring and web-based data distribution has proven itself on the largest single construction project ever undertaken in Finland. The excavation for the Kamppi Center Project in
Jan 1, 2004
-
Analyzing and Modeling Presplit Vibration Attenuation to Improve Mine ProductivityBy Tyler Rockley, J. P. Remi Proulx, Ruilin Yang
A highwall blast vibration project was carried out to quantify the level of blast vibrations produced from a trim blast in soft rock and a combined production and trim blast in hard rock. Combining pr
Feb 1, 2020
-
Blast Modeling for Underground MiningBy Gordon K. Jorgeonson
Much of the modelling of blasting operations has been devoted to simulating blasts in open pit mines and quarries . This has been the most obvious application and has been reported in many papers and
Jan 1, 1990
-
Journal: Blast Vibration and Seismograph Section: A History of the Development of Instruments for Measuring Vibrations of the Earth - Part 3By Robert Hopler
The 1800’s were a time of tremendous advancements in science and experimentation, and earthquakes were a subject of great interest. The meetings of the British Association for the Advancement of Scien
Jan 1, 2006
-
Rational Methodologies for Setting Blast Vibration Limits for HousesBy Adrian Moore, Alan Richards
"It has been common practice to set blast vibration limits for structures using an “observational”approach whereby limits are set at a level based on observations of damage, or the lack ofdamage, comb
Jan 1, 2013
-
Quantifying Shovel Performance Through Blast Pattern BoundariesBy K. Taylor
In surface coal mining, the performance of a shovel through blasted muck is one of the key performance indicators of the blast. Historically, performance has been measured qualitatively based on opera
Jan 1, 2024
-
Blast Vibration Damage Potential in a Residential Structure from Intentional Full-Scale Nearfield Quarry BlastingBy Josh Calnan, Zach Agioutantis, Daykin Schnell
Damage complaints are a common occurrence related to blasting activities, specifically when blasting operations occur near residential areas. These complaints are often associated with ground vibratio
Jan 26, 2026