Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
I-880 Replacement Project (Cypress Freeway) Large Diameter Driven Pipe Pile Foundations Test Program And Construction - Implementation Of Test Results - ImplementationBy Darrell L. Beddard
The test program information provided for some immediate changes on the upcoming contracts and in contract administration for the I-880 Replacement Project. Plan sheet modifications included changes t
Jan 1, 1996
-
Construction Of Deep Foundations By Cast-In - Borehole MethodBy Y. W. Mou
In order to improve the construction of pile foundations and deep foundations of largo sizes, the paper deals with the method of installing square or rectangular bored-piles for annular foundation as
Jan 1, 2010
-
Borehole Loading Test Using A Self-Boring Instrument ? SynopsisBy H. Mori
This paper describes a new borehole loading test using a self-boring instrument appropriate for dense sandy soils and stiff clayey soils. The results of loading tests for the bearing strata of deep fo
Jan 1, 2010
-
Installation Of Augered Cast-In-Place Piles - Equipment (66bbaadf-14f6-4860-86d8-a6149d09411b)? Hollow Stem Auger ? Drill Bits ? Leads/Torque Arm ? Hydraulic Gearbox ? Hydraulic Power Unit ? Grout Pump ? Crawler Crane
Jan 1, 1998
-
Determination Of The Load-Displacement Characteristics Of Single Pile In Soft Soil ? SynopsisBy Z. C. Chen
Based on the analysis of load test data of long floating piles in soft soil regions, the expressions of load-transfer function of pile shaft and tip for soft soils are presented in this paper, and the
Jan 1, 2010
-
The Wireline Undisturbed Soil Sampling In Deep Foundation ? SynopsisBy Z. Q. Bian
The wireline sampling originates from core drilling in rocks. The authors combined the wireline sampling technique with conventional undisturbed soil samplers, including Osterberg sampler, Denison sam
Jan 1, 2010
-
Drilled Piers Support Massive Gantry CraneBy John R. Davie
This paper describes the design and construction of two 5.6 MN capacity drilled piers installed to support the main loading elements of a large cantilevered gantry crane. The critical crane columns we
Jan 1, 2006
-
Effect Of Curing Stresses On The Mechanical Properties Of Soil-cement Mixed MaterialsBy George Onorato, Giovanni Bonita
Deep soil mixing (DSM) has now become a ubiquitous ground improvement technique across the globe for producing soil-cementous materials for many types of complex civil and environmental applications.
-
A Realistic Approach Toward Stray Current Induced Corrosion Affecting Steel Sheet PilingBy Anne Fagot
Because of the risk of corrosion caused by stray currents, steel foundations and steel sheet piling are generally prohibited in the vicinity of railway structures. Steel solutions are only accepted if
Jan 1, 2008
-
Temperature, Velocity, Density, And Moisture In Drilled ShaftsBy Khamis Y. Haramy
Curing temperature, density, and moisture significantly affect the velocity measured in the crosshole sonic logging, the rate of strength gain, and the final strength of concrete in drilled shafts and
Jan 1, 2007