Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    Environmental Planning And The Mount Gunson Operation

    By Warren R. P

    When the original Mount Gunson joint venture, between CSR and United Uranium ceased operations in December 1971, an intensive ex- ploration campaign was launched to prospect for more ore in the Mou

    Jan 1, 1976

  • AUSIMM
    The Recovery of Sulphuric Acid From Copper Tankhouse Electrolyte Bleeds ù A Case Study on the Development of Solvent Extraction Processes

    By K Gottliebsen

    Many hydrometallurgical and chemical processes produce large amounts of acid waste. This is illustrated by the copper S/X-E/W process used at the Mount Gordon mine in North Queensland, which produces

    Jan 1, 2000

  • AUSIMM
    Underground Bulk Cooling at Callie Underground Mine

    The Callie Underground Mine is located in the Tanami Desert 560 km Northwest of Alice Springs in the Northern Territory and is currently operated by Newmont Australia Limited with all mining activitie

    Jan 1, 2005

  • AUSIMM
    Process Alternatives to Recover High-Grade Iron Ore Concentrate from the Thickener Underflow Slimes of the Sishen Beneficiation Plant

    Kumba Iron OreÆs Sishen Mine is one of the worldÆs largest iron ore mining operations situated in the Northern Cape, South Africa. It produces 29 million tonnes of iron ore products per annum using a

    Jan 1, 2008

  • AUSIMM
    Computational Simulation for Mineral Processing

    By Jancar T, de Guzman M M, Matthews B, Tu J. Y

    The use of computational simulation to predict the performance of existing equipment or for the design of improved mineral processing equipment will be referred to as Computational Mineral Processi

    Jan 1, 1995

  • AUSIMM
    The Discovery and Geology of the Argyle Diamond Deposits, Kimberley, Western Australia

    By Smith CB, Boxer GL

    The Argyle diamond deposits in the East Kimberley were found as a result of a long term exploration programme, begun in 1972 by the Kalumburu Joint Venture (KJV), to search for diamonds on the Kim

    Jan 1, 1984

  • AUSIMM
    Effect of oxygen on the interfacial phenomena and metal recovery rate in recycling process

    By Y-B Kang, J H. Park, J Park

    In order to understand the effect of oxygen injection into the molten metal on the valuable metals (VM) recovery and interfacial phenomena, several high-temperature experiments were conducted using a

    Aug 21, 2024

  • AUSIMM
    Acid Progress for Alumina Extraction

    The CSIRO acid alumina employs the essential steps of digestion, hydrolysis and calcination to produce pure alumina from ores too high in silica or too low in grade for the Bayer process. The two latt

    Jan 1, 1963

  • AUSIMM
    Some Problems in Deep Open Cut Mining and their Solution by Goldsworthy Mining Limited

    The iron ore mining operations carried out by Goldsworthy Mining Limited at Golds- worthy, Shay Gap and Sunrise Hill, in the Pilbara region of the North-West of Western Australia, are unusual insofa

    Jan 1, 1979

  • AUSIMM
    The Design and Construction of Intersection in Situ Tunnel Openings in the Murl Project

    The four major contracts for the construction of Museum Station are: 1) Installation of Soldier Piles, 2) Structural Contract including the temporary support, 3) Architectural Finishes which include

    Jan 1, 1981

  • AUSIMM
    The role of Infrared and Raman Spectroscopy in Solving Mineral Processing Problems

    By Walker G. S

    Infrared and Raman spectroscopy have been used to study a range of solid state and aqueous solution species which are of interest in extractive metallurgy. In the solid state new Cu(II)/CN'/NH3

    Jan 1, 1996

  • AUSIMM
    Differential Flotation at Warrego Concentrator

    Warrego copper ore characteristically contains 0.05-0.2% bismuth, which on upgrading produces a concentrate of approximately 1.3% bismuth. Early smelting of this concentrate (1973) was accomplishe

    Jan 1, 1984

  • AUSIMM
    Open Pit Mining - Keeping the New South Wales Industry Alive

    Coal has been mined in New South Wales for nearly 200 years and prior to 1970 the vast majority of this coal was mined from underground mines using bord and pillar or similar systems.Since 1970 there

    Jan 1, 1992

  • AUSIMM
    Comparative study of oxide dissolution modelling in secondary steelmaking slags

    By S K. Michelic, N Preisser

    For certain applications, steels have to feature a very distinct and well-defined level of cleanness in terms of the number and composition of non-metallic inclusions. Therefore, one crucial aspect of

    Aug 21, 2024

  • AUSIMM
    Industrial Clays: Meeting the Challenge of Increased Technical Demanda and Shifting Markets

    Around 35 Mt of industrial clays were produced in 1994 under the broad classifications kaolin (25 Mt), bentonite (8 Mt) and attapulgite/sepiolite (2 Mt). A brief review of world sources and markets

    Jan 1, 1997

  • AUSIMM
    An Occurrence of Sub-Microscopic Gold in the Dolphin East Lode, Fiji

    By Edwards A. B

    The occurrence of gold so finely divided as to be invisible under the microscope, even at magnificatioIl; of 1,200 to 2,000 diameters, is rare, but not unknow;n.. Burg (1930) has described an occurren

    Jan 1, 1946

  • AUSIMM
    Some Installation, Operational and Maintenance Aspects of Diesel Engine Power Plant, Gold Mines of Kalgoorlie LTD., W.A.

    This paper describes the oil engihe plant owned and operated by Gold Mines .of Kalgoorlie Limited, and gives some details of installation, operational, and maintenance experiences which have arisen du

    Jan 1, 1945

  • AUSIMM
    Recovery of Iron Values From Tailing Dumps Adopting Hydrocyclone and Magnetic Separation Techniques

    By P S. R Reddy, V N. Misra

    The iron ore deposits in India are rich in iron content but usually contains high alumina and silica. The current industrial practice results three products namely lump, fines and slimes. The lump and

    Jan 1, 2002

  • AUSIMM
    Minimising the Total Cost of Horizontal Development with Burn Cut Blast Rounds

    The total cost of horizontal development can be minimised by optimising the cost of each of the component operations (eg drilling, blasting, etc). Component costs should not be minimised. To optimise

    Jan 1, 1998

  • AUSIMM
    Hydraulic Monitor Extraction at Spring Creek Mine

    By C Menzies

    Hydraulic Monitor mining at Solid EnergyÆs Spring Creek Mine has proven to be a safe and effective method of extracting steeply dipping thick seams at production capabilities approaching one million t

    Jan 1, 2007