Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    The Design, Installation and Commissioning of an Absorption Refrigeration System at Gwalia Gold Mine in Western Australia

    By J deVries, A Broodryk, P Kyselica, K McLean

    Gwalia gold mine is located close to the town of Leonora in the Goldfields region of Western Australia, some 830 km from Perth. The mine is wholly owned by St Barbara Ltd, an Australian Securities Exc

    Aug 31, 2015

  • AUSIMM
    Activity Coefficient of Oxygen in Dilute Lead Ton Alloy Solvent

    By Kapoor M. L

    EMF measurements were performed in the temperature range of 933-1095 K to determine the thermodynamic properties of oxygen dissolution in liquid lead and lead-tin alloys with tin in the dilute conc

    Jan 1, 1992

  • AUSIMM
    Some Real and Imaginary Examples of Volcanic Hazard and Risk Assessment

    An empirical method of estimating dense rock (D.R.E.) equivalent volumes erupted as airfall tephra, described in a companion paper in this volume, is elaborated, and its accuracy discussed. Estimates

    Jan 1, 1990

  • AUSIMM
    The Composition of Some Copper Slags From Port Kembla

    INDEX OF CONTENTSBlast Furnace SlagsForehearth AccretionsConverter SlagsConclusionsIllustrationsCOMPOSITION OF SOME COPPER SLAGS FROM PORT KEMBLASamples of copper slags from the Port Kembla Smelter of

    Jan 1, 1949

  • AUSIMM
    The Eastern Volcanic Belt of Northland, New Zealand

    The products of Lower Miocene calc- alkaline activity on the east coast of Northland, New Zealand are described and contrasted with coeval rocks of the northern North Island. These rocks, the Easte

    Jan 1, 1987

  • AUSIMM
    Optimum embankment design for a tailings dam

    By A Fyans, B Ghahreman-Nejad

    This paper discusses the method and results of an options study into selection of the optimal form for a 130 m high tailings/water retaining dam, located in a region of high seismicity in central Iran

    Jul 23, 2018

  • AUSIMM
    Geotechnical assessment for the waste rock backfilling of the decommissioned Rum Jungle Open Cut Pit

    By J Hartnett, B Tarrant, A Rayner, D O’Toole, P Davies

    Since 2009, the Northern Territory and Australian governments have been working under a national partnership arrangement to inform a rehabilitation plan for the former Rum Jungle uranium mine. Part of

    Jul 1, 2021

  • AUSIMM
    Who is Responsible for Grade? – An Evaluation of the Value Chain at Mt Magnet Gold Project, Western Australia

    By A Weeks, W J. Shaw, A Kuk

    Grade control is a process that requires the interaction between many components of the mining operation and successful grade control is only realised through good data, robust systems, and a well-tra

    Aug 18, 2014

  • AUSIMM
    Production of High-quality Sinter by Controlling the Sintering Reaction

    By Y K. Ji, B J. Chung

    In recent years, the utilisation of ultra-fine ore in ironmaking has gradually increased due to the depletion of high-quality iron ore. The use of ultra-fine ore in the ironmaking process is typically

    Jul 13, 2015

  • AUSIMM
    Making a positive change – evolving the modern Integrated Remote Operations Centre (IROC) to optimise and support carbon-neutral value chains

    By G McCullough, J Els, J Bassan

    Integrated Remote Operations Centres (IROCs) have a crucial role in optimising a mine’s carbon emissions, especially as industry faces an imperative to achieve net-zero emissions on an accelerated tim

    Sep 18, 2023

  • AUSIMM
    Geotechnical monitoring at the Porgera Mine

    By Yambu J, Titus K

    Geotechnical investictations and monitoring have been integral to development of the Porgera Gold Mine. The steep, unstable terrain has required a program for monitoring of slopes and foundations whic

    Jan 1, 1994

  • AUSIMM
    Underground Hydraulic Filling Storage At North Broken Hill Limited

    An underground storage and filling distribution system is presently being established at North Broken Hill Limited in the No.3 Shaft area. This has been necessitat- ed by the dependence of the pres

    Jan 1, 1973

  • AUSIMM
    An approach to the calibration and validation of transfer chute DEM simulations handling cohesive iron ore fines

    By T Walkemeyer, R Elliott, D Chang-Martin

    Over the past decade, discrete element method (DEM) simulations have seen increasing adoption by the resources sector to inform the design of materials handling equipment such as transfer chutes, bins

    Sep 18, 2023

  • AUSIMM
    Advances in Research on Metallogenic Mechanisms for the Xitieshan Sedimentation-exhalation Lead-zinc Deposit, Qinghai Province, China

    By S Q. Zhao, J H. Wei

    "An EXTENDED ABSTRACT is available for download. A full-length paper was not prepared for this presentation. The Xitieshan lead-zinc deposit is located in the north margin of the Qaidam Basin, Qinghai

    Mar 18, 2015

  • AUSIMM
    Cutter Mining – Crossover Technology from Civil Engineering to Mining

    By S K. Schwank

    Trench cutter systems have been used in civil engineering for the least 30 years for the installation of deep cut-off walls, retaining walls and foundation systems. The systems are constantly advanced

    Nov 4, 2015

  • AUSIMM
    Advancing sustainability in pumping systems – a comprehensive methodology for calculating, monitoring and minimising power and water consumption

    By A Karrech, G M. Hassan, A Varghese, E Lessing, S Martins

    Pumps play a critical role in mining operations, and their energy consumption and environmental impact are significant. This paper addresses the need for a holistic approach to sustainable pump deploy

    Sep 1, 2024

  • AUSIMM
    The Prevention and Control of Burning in Waste Coal Dumps

    By Lukaszewski GM

    The indiscriminate surface disposal of coal waste in the past has created a serious fire hazard in the bush of the northern New South Wales coalfields. Spontaneous or bushfire-induced combustion in l

    Jan 1, 1970

  • AUSIMM
    The Flotation of Alluvial Gold (1221b610-5c83-4a74-abdf-ffdcdef2d0d1)

    By Keyte SG

    Gravity methods of recovering alluvial gold are not very efficient at particle sizes below about 0.1mm. Whereas such gold may not have been economic to recover in the past, the same may not be true to

    Jan 1, 1990

  • AUSIMM
    Mining for Water - Partnering for Sustainable Water Use in Semi-Arid Regions

    By N Lefebvre, M Jakeman, R Aseervatham

    Semi-arid regions suffer from two afflictions; evaporation may exceed precipitation by multiples of two or more and variations in precipitation can be both extreme and difficult to predict. Many Austr

    Jan 1, 2006

  • AUSIMM
    Photogrammetry-based mapping techniques in slope stability management

    By T Wang, D Wang

    Photogrammetry-based techniques supported by traditional mapping tools are more frequently used for open pit geotechnical mapping. It fundamentally involves the collection of geological, structural an

    Nov 29, 2022