Search Documents

  • AUSIMM
    Considerations for Effective Gold Process Development

    By A Giblett, R Dunne, D Appelhans

    There are a number of hurdles that must be negotiated in order to design an effective gold ore treatment facility such that the expectations forming the basis of project economics are valid and can be

    Jul 15, 2013

  • SME
    Collaborative Strategic Research Initiatives: Their Benefits and Best Practice Approaches for Establishing the Same

    By Daniel Brutto

    "Environmental considerations are a key driver within marine mining consenting processes across different national and international legislative regimes and are critical in shaping the global public p

    Sep 1, 2014

  • AUSIMM
    Treatment of Wolfram, Bismuth, and Molybdenite Ores at Burma Queensland Corporation Mill, Wolfram, N.Q.

    THE old mill erected by the .Irvinebank Company consisted of 10 heads of stamps (850 lb.), rock-breaker, Hartz jig, two Krupp tables, two Luhrig vanners, three sand-pumps, one mixer; six flotation ves

    Jan 1, 1920

  • CIM
    An investigation on minimizing reagent consumption in ammonium thiosulphate gold leaching

    By Chen Xia, G. Deschenes, Wan-Tai Yen

    "Ammonium thiosulphate is a potential replacement for the cyanide in gold leaching. However, the high reagent consumption hinders its practical applications. In order to reduce the thiosulphate consum

    Jan 1, 2002

  • DFI
    Approach To Reliability Based Design On Deep Mixing Improved Ground

    By Masaki Kitazume

    Deep mixing method, in-situ admixture stabilization technique, has been developed and adopted for on land and marine construction works in Japan. The geotechnical design procedure of the method has be

    Jan 1, 2004

  • TMS
    Sustainable Electrolysis for Electrowinning and Electrorefining of Metals

    By Geir Martin Haarberg

    Modern electrolysis technologies can provide possibilities for developing sustainable processes in terms of energy and environment. Laboratory experiments were carried out to study electrodeposition o

    Jan 1, 2010

  • SME
    Specifications For Initial Support In Rock Tunnels

    By William F. Daly, William H. Hansmire

    Installation of initial tunnel support is often the most uncertain element of work in the design of, and a contractor bidding on, construction of a rock tunnel. The risks the construction contractor a

    Jan 1, 1985

  • DFI
    The Alternate Technical Concept Process For Foundations At The New Mississippi River Bridge, St. Louis

    By Dan A. Brown

    The New Mississippi River Bridge (MRB) employed conventional design-bid-build procurement, but the bidding process included the opportunity for pre-qualified bidders to develop and propose confidentia

    Jan 1, 2011

  • CIM
    10th Anniversary of First Installed HPGR Replacing Tertiary Crusher

    By Frank van der Meer, Jorge Portocarrero, Alexandra Gruendken

    "The number of High Pressure Grinding Rolls (“HPGRs”, also called Roller Press) installations instead of tertiary crushers is rapidly increasing. The technology has been largely accepted in the minera

    Jan 1, 2009

  • ISEE
    The Effect of Calculated Explosive Energy Output on Blast Design

    By P D. Kasbanis, Lyall Workman

    "The energy output of an explosive is typically calculated using an equation of state and computerapplications. Results are reported as weight and bulk strength, either in absolute terms or relative t

    Jan 1, 1996

  • SME
    Security of supply, sustainability and resource efficiency

    By J. Geisler

    When addressing Germany’s resource supplies, we need to distinguish between those domestically available and imported ones. Resource extraction ostensibly competes with the designation of protection a

    Jan 1, 2011

  • NIOSH
    RI 4450 Petroleum Engineering Study Of The West Red River Field, Tillman County, Okla.

    By H. B. Hill

    The West Red River oil field, in Tillman County, Okla. (fig. 1), is approximately 8 miles northwest of the town of Burkburnett, Wichita County, Tex. The wells are in the river bed between the medial l

    Jan 1, 1949

  • SME
    Detail Survey of Polymetallic Nodule- Results of AUV Survey

    By Akira Tsune, Shingo Sugimoto, Tadayuki Ishiyama, Nadao Saito, Masatsugu Okazaki

    "The Deep Ocean Resources Development Co. Ltd. (DORD) of Japan signed a 15-years contract with the International Seabed Authority for exploration of polymetallic nodule in a 75,000 km2 area, consistin

    Sep 1, 2014

  • SAIMM
    Degree Of Prereduction Without Coke Consumption In Industrial Furnaces

    By Rodney Ishak, Merete Tangstad

    In the HC FeMn production, better utilisation of coke and electric power is vital for reducing the production costs. The higher manganese oxides in the charge are reduced to MnO in the prereduction zo

    Jan 1, 2007

  • SAIMM
    Seismic monitoring of the Northparkes lift 2 block cave?part I undercutting ? Synopsis

    Caving of the second lift of the E26 orebody at Northparkes Mines was monitored with a comprehensive package of instrumentation, including an ISS seismic monitoring system. Seismicity was collected by

    Jan 1, 2008

  • ISEE
    ROCSCAN: A Multipurpose Geomechanics Instrument

    By D Frantzos, J J. Cotter, H Tammemagi, J B. Codrington, J Kaasalainen, A C. Webster

    "Exploshres Technologies International (ED) is developing an instrument called ROCSCAN which isplanned to have broad application in both blasting and rock mechanics. The purpose of this paper is to ou

    Jan 1, 1989

  • DFI
    Automated Installation Monitoring For Augercast And Driven Piles

    By Garland Likins

    Where soil conditions are favorable, augercast piles have significant economic advantages, but they also have some uncertainty due to the in construction methods. To confirm structural integrity, stat

    Jan 1, 1999

  • CIM
    Introduction of China’s Copper Converting Technologies

    By Huilan Yang, Feng He

    This paper intends to introduce the development of copper smelting and converting technologies in China in recent years, with a particular emphasis on the introduction of various continuous converting

    Jan 1, 2019

  • CIM
    Economic Recovery and Upgrade of Metals from Middling and Tailing Streams (c573bdd5-90fc-4072-9ce3-2caa48051cb4)

    "As mine head grades decline and orebodies become more complex, traditional mineral processing techniques and flowsheets to achieve saleable concentrate become more difficult to design and construct.

    Jan 1, 2017

  • SME-ICGCM
    Work Practices to Manage Bump Prone Ground

    By Floyd Varley

    In deep and highly-stressed coal mining, advanced design practices are used to minimize the potential for damaging events to occur. Despite these design efforts, the hazard of coal mine bumps can not

    Jan 1, 2008