Search Documents

  • SME-ICGCM
    Design And Backfill Installation Considerations For Cut-And-Cover Coal Mine Slope Entry Using Steel Supports And Lagging (5aeac579-3675-40a9-b37e-6b4c5af947be)

    By Larry DeGraff

    With the increase of new mine development in the past several years, many coal mines have decided to self- perform the design and construction for their slope development projects. The development pr

    Jan 1, 2009

  • SME
    Multi-Attribute Selection Method For Mining Trucks

    By D. Komljenovic, V. Kecojevic

    Selection of the best possible truck type (model) is of crucial importance for the mine decision-makers. In this paper, authors contribute to the body of knowledge by developing a novel methodology f

    Jan 1, 2007

  • SME
    Design Aspects Governing Disc Cutters and Cutterheads of Hard Rock TBM—A Review - Mining, Metallurgy & Exploration (2024)

    By V. M. S. R. Murthy, Biswaraj Dash, Somnath Chattopadhyaya

    Tunnel boring machine (TBM) has been in focus for the last few decades and is currently the most preferred excavation method for metro, hydro and irrigation tunnels. Tunnelling in hard and abrasive ro

    Jan 31, 2024

  • SAIMM
    Copper Solvent Extraction: Status, Operating Practices and Challenges in the African Copper Belt

    By Kathryn C. Sole, Owen Tinkler

    "Although the first large-scale application of copper recovery by solvent extraction (SX) took place in Zambia in the early 1970s, it is only in the last decade that this technology has become widely

    Jan 1, 2015

  • AUSIMM
    Carmen Copper – A Sustainable Approach to Tailings Thickener Upgrades

    By C Maloloy-on, S Morgan, M Deiparine, H Mackie

    There is a strong focus in the mining industry to limit its impact on water quality and usage. This is even more evident in developing countries, where mining companies operate within local communitie

    Sep 7, 2015

  • CIM
    Integrated Experimental and Thermodynamic Modelling Study of the Multicomponent “Cu2O”-FeO-Fe2O3-CaO-SiO2-PbO-ZnO-Al2O3 System

    By V. Prostakova, M. Shevchenko

    The copper smelting gas / slag / matte / metal / solids system with the Cu-Fe-Ca-Si-O-S major elements has been a long-term focus of the present overall research program using integrated experimental

    Jan 1, 2019

  • DFI
    Application Of Global Strain Extensometer (Glostrext) Method For Instrumented Bored Piles In Malaysia

    By Abdul Aziz Hanifah

    A novel instrumentation and analysis technique, called GLOSTREXT method has recently been introduced for bored pile load tests in Malaysia. This technique provides an innovative and improved alternati

    Jan 1, 2006

  • AUSIMM
    Some Results of Mechanised Mining of Coal in the Western Coalfield of New South Wales

    Total mechanisation in the Western district of New South Wales is quite a recent addition to productive methods in that State, for it was only in 1940 that the first colliery was equipped for this met

    Jan 1, 1954

  • NIOSH
    OFR-164-83 Evaluation Of Bulkheads For Radon Control

    By Clifford H. Summers

    This report describes an experimental program which we conducted on behalf of the U. S. Bureau of Mines, to select from currently available materials two novel systems of construction for air-restrain

    Jan 1, 1982

  • CIM
    Towards an Integrated Framework for Asset and Process Health Monitoring and Optimization on a Milling Circuit

    "In mining operations, it is widely accepted that strategies to drive operational goals must revolve around improving plant availability, reliability and process efficiency. In this paper, an integrat

    Jan 1, 2014

  • CIM
    The Flin Flon Zinc Plant

    By John D. Carr

    Introduction The Flin Flon zinc plant operates on what is known as the low density or standard sulphate process, that is, the zinc is carried through the plant solution circuit attached to the SO4 or

    Jan 1, 1935

  • ISEE
    Explosive Energy In Blast Design Optimization

    By Deepak Vidyarthi

    This paper deals with the significance of Explosive Energy in the optimization of blast design parameters, and the benefits emerging out of it. It is based on the original work done by the author in d

    Jan 1, 2006

  • IIMP
    Aplicación del sistema de gestión Hochschild Mining DNV

    By Carlos Virrueta Zevallos

    El presente texto describe los lineamientos necesarios para construir un sistema de control de perdidas sólido en la Corporación HOCHSCHILD MINING DNV, el cual se basa en un liderazgo, compromiso y a

    Sep 12, 2011

  • IIMP
    Teck – Aurubis: Un enfoque integrado desde la mina hasta el metal para desarrollar depósitos de cobre con alto contenido de arsénico usando el proceso CESL

    By Keith Mayhew

    Ante la alta demanda de cobre por el crecimiento urbano e industrial y para la construcción de infraestructuras, la industria del cobre necesita una solución para el desarrollo sustentable de los recu

    Sep 12, 2011

  • SME
    Limestone Lithological Classification, Using Image Processing And Pattern Recognition Technique

    By F. Khorram

    Image processing is a technique that simulates the human vision system. This technique enables applying every statistical or intelligent operation to recognize differences. In this way this new techni

    Jan 1, 2012

  • ISEE
    Explosive Detection Recovery and Disposal

    By Robert McClure

    The detection, recovery and disposal of commercial explosives and explosive waste has always carried a level of risk and requires specialized equipment and technical expertise. Improperly stored, disc

    Jan 1, 2015

  • AIME
    Members, Junior Members, Associates and Junior Associates Alphabetical List

    Abbey, Robert Graham, District Mgr., The W. W. Sly Mfg. Co., 50 Church St., New York, N. Y. '21 Abbott, A. N Ave. Morelos 84, Cuernavaca, Morelos, Mexico '23 Abbott, Argyle Campbell, Geol

    Jan 1, 1932

  • NIOSH
    RI 5777 Recovering Aluminum And Fluorine Compounds From Aluminum Plant Residues ? Introduction And Summary

    By R. S. McClain

    The Federal Bureau of Mines investigated residues from aluminum plants, to determine if carbon could be removed by flotation while recovering fluorine and aluminum compounds for recycling to the reduc

    Jan 1, 1961

  • SAIMM
    Simulation-assisted plant design, A. Lebedev

    By A. Lebedev

    Application of dynamic simulation for a base metal processing plant is discussed. The plant receives ore of variable quality from two pits and blending had to be applied to maximise recovery. The plan

    Jan 1, 2020

  • SME
    Development Of Stillwater Mining Company's East Boulder Project Using Tunnel Boring Technology

    By C. Alexander

    Stillwater Mining Company is developing a second underground palladium and platinum mine approximately 21 km (13 miles) west of their existing Nye operation in south central Montana. A 5650 meter (18,

    Jan 1, 1999