Search Documents
Search Again
Search Again
Refine Search
Refine Search
-
Baum Station – A New Pile Driving and Drilling Navigation SystemBy Dzianis Proshchanka, Yoshi Izumi, Koji Mitani, Ayuna Kitaura
"A new pile driving and drilling navigation system has been developed. It utilizes the commonly used surveying total station, combined with an innovative reticle. Conventional crosshairs have been rep
Jan 1, 2017
-
Safety And Economics Of Working Platforms – A Uk PerspectiveBy David Corke
The paper presents the development of Federation of Piling Specialists (FPS) calculation of rig track loading, the production of the Building Research Establishment document “Working platforms for tra
May 1, 2022
-
Session 20 "Grouting for Water Retaining Embankments"By Timothy Flaherty
We observed the boiling in the water very close to the water adjacent to where we were drilling. That only happened at the very beginning before it was switched to water flushing. Yes, it was performe
Feb 10, 2003
-
Dulles Metrorail/Silver Line (Phase 2) Drilled Shaft Lateral Load Testing ProgramBy William Billiet
"The Dulles Silver Line Phase II is an 11.4 mile extension of the Washington Area Metro Transit Authority’s Silver line in northern Virginia. There are three miles of elevated guideway, which are supp
Jan 1, 2017
-
Automation Of Pile Foundation Design Post-Processing To Produce Pile PlansBy Rajasekar Subbian, Jessica Oudhof
In the Netherlands pile foundation design is done using CPTs in accordance with EC7 national annexure. The capacity per tip level is calculated for every CPT followed by zonation to find the tip level
May 1, 2022
-
Use of Enhanced Pre-Mixed Self-Hardening Grout for an Emergency Cut-Off Wall Intervention in West AfricaBy Maurizio Siepi, Bruno Vingiani, Claudio Asioli
"The article describes an emergency rehabilitation intervention executed at Buyo Dam, in Ivory Coast, to intercept a significant water seepage occurring through the foundation of this zoned earthfill
Jan 1, 2016
-
Evaluating Lateral Bracing Code Requirements for Large Diameter FoundationsBy Jon Huff, Jeffrey Donville, Hannah Iezzoni, Dan Stevenson
Occasionally, in the design of deep foundations for a structure, a single deep foundation element may be used to support a building column. The most common type of element used in such cases is a dril
Sep 8, 2021
-
Hybrid Shoring System for a Deep Temporary ExcavationBy Nadir Ansari, Brian W. Wilson, Marina S. W. Li
"A hybrid Deep Mixing (DM) shoring system was recently constructed for a high-rise development in downtown Vancouver, British Columbia, Canada for the temporary support of a five-level basement excava
Jan 1, 2017
-
The Importance Of Tension Softening (Of Concrete) In Modelling Of Tension PilesBy Qingwei Joshua Ong
Tension piles, also known as uplift or anchor piles, are necessary to resist uplift forces that might cause structural distress. In excavation projects, most uplift forces are developed because of hyd
Nov 1, 2022
-
Complex Deep Foundation System for Tall Tower in New York CityBy Renzo D. Verastegui, Michael Law, Sitotaw Y. Fantaye, Alfredas Daugiala
"When completed, 520 Park Avenue will amend the Manhattan skyline and be one of the most prestigious high-rise towers in New York City. The 52-story condominium building is located on a 60 ft by 100 f
Jan 1, 2017
-
Optimization of Design of Drilled Shaft Foundations by Lateral Load Testing (94ee84ca-5eda-40d1-bba2-d7742a925002)By Donald R. Clark
"Drilled shafts are being used as foundation support for parabolic solar troughs at the Genesis Solar Project being constructed near Blythe, California. Three types of drilled shaft foundations are re
Jan 1, 2017
-
Optimization Of Design Of Drilled Shaft Foundations By Lateral Load TestingBy Donald R. Clark
Drilled shafts are being used as foundation support for parabolic solar troughs at the Genesis Solar Project being constructed near Blythe, California. Three types of drilled shaft foundations are re
-
A Geotechnical Instrumentation Case StudyBy Mehih Demirkan, Kevin Tehansky
Located about an hour drive south from Washington, D.C., the Maryland Transportation Authority (MDTA) contracted with Skanska-Corman-McLean (SCM) to deliver a new Governor Harry W. Nice Memorial/Senat
Apr 1, 2023
-
Case Study: Large Diameter Helical Pile Foundation for High Voltage Transmission Towers in Soft Glacial DepositsBy John Dunn, Matt Hawley, Kashif Butt, Nicholas Gura
"This paper presents the results of a static load testing program completed on helical pile foundations for the replacement of high voltage transmission line tower structures. The foundations were par
Jan 1, 2017
-
Low Overhead Secant Piles Drilled From Within A ShaftBy Allen B. Stanton, Parthiv Brahmbhatt, Michael Grimm, Stanley L. Worst
Constructing a circular shaft consisting of secant piles has its own complications which make it more difficult than typical drilled shaft construction. Add to that performing under low overhead power
Oct 1, 2022
-
1785 Massachusetts Ave. NW, Washington, D.C.By Daniel Stevenson, Richard Guenther
"The preservation of historic buildings is not only essential to the understanding of our national heritage, but it is also environmentally responsible to adapt existing buildings to compatible new us
Jan 1, 2017
-
The Bow, Encana: Design, Monitoring, And Results Of A Deep Excavation In Downtown CalgaryBy Matthew Janes
The new Bow office complex will become the new headquarters of EnCana Corporation, a leading Canadian oil and gas company. The shoring system, encompassing nearly two city blocks and excavated to a d
Jan 1, 2008
-
Analysis of Laterally Loaded Free-Head Pile Groups in SandBy Ashraf M. Eid
Most research dealing with the problem of laterally loaded piles has been the response of individual piles subjected to lateral loads and/or bending moments. However, piles are seldom used individuall
Jan 1, 2005
-
Session 23 "Grout in Rock and Mining"By John Davie
We used a Remtek survey in Glenrock and had very good luck with it when we first started the initial investigation. We would have loved to have used that more but my understanding is the equipment is
Feb 10, 2003
-
Testing Foundations for Major Minnesota BridgesBy Dan A. Brown, Rich A. Lamb, Paul J. Axtell
"Over the last 10 years, the Minnesota Department of Transportation (Mn/DOT) has had a very active program of replacing many major bridges, large structures spanning the Mississippi River. The deep fo
Jan 1, 2013