A Geotechnical Instrumentation Case Study

- Organization:
- Deep Foundations Institute
- Pages:
- 5
- File Size:
- 2035 KB
- Publication Date:
- Apr 1, 2023
Abstract
Located about an hour drive south from Washington, D.C., the Maryland Transportation Authority (MDTA) contracted with Skanska-Corman-McLean (SCM) to deliver a new Governor Harry W. Nice Memorial/Senator Thomas "Mac" Middleton Bridge, which takes U.S. 301 over the Potomac River, spanning 1.9 mi (3 km) from Maryland to Virginia. The new bridge aimed to improve capacity, safety and access of the roadway and was planned as a four-lane span with deep foundations that would be constructed fewer than 150 ft (45 m) north of the existing alignment of the more than 80-year-old bridge. The new Harry Nice Bridge opened in the fall of 2022 with a design life of more than 100 years, servicing 12 ft (4 m) wide lanes with 2 ft (0.6m) shoulders, doubling capacity, enhancing emergency response, upgrading maintenance and inspection activity access, and featuring lane sharing for cyclists.
Citation
APA:
(2023) A Geotechnical Instrumentation Case StudyMLA: A Geotechnical Instrumentation Case Study. Deep Foundations Institute, 2023.