Embodied Carbon Assessment For A Multi-Phased Development Pile Testing StrategyBy Jack Taggart, Chris Barker
Pile load testing strategies for large infrastructure projects and multi-phase building developments have historically justified cost and programme benefits for undertaking advance preliminary and wor
May 1, 2022
-
Construction of a Deep Slurry Cutoff Wall for the Sacramento River East Levee ProgramBy Louay Owaidat, Daniel Jabbour, Allan Frappier, Jose Gomez, Mark Stanley, Tino Maestas
The U.S. Army Corps of Engineers (USACE) is implementing a levee strengthening program along the Sacramento River East Levee (SREL) designed to correct 11 miles of deficient levees as identified by re
Sep 8, 2021
-
Soil Nail Design Optimization of 100 Ft Deep Excavation Project in San Diego, CABy Babak Mamaqani, Pirooz Barar
The Heights project was located at Fashion Valley North, San Diego, CA. The scope of the project was to replace two existing commercial buildings with a large 7-story multi-family residential building
Sep 8, 2021
-
Capacity of Hydraulically Jacked PilesBy Howard A. Perko, Melinda J. Hummel
"Hydraulically jacked piles, herein referred to as jacked piles, are commonly used for underpinning existing structures to arrest settlement or augment an existing foundation for higher loads. They co
Jan 1, 2017
-
Jet Grout For Soil Mass Stabilisation To Support Power Plant FoundationBy Vishal Pathak, Shailesh A. Godhuly
Ground Modification System in terms of Jet Grouting for soil strengthening and mass stabilization was engaged for a power plant project in an international power project, engineered by L&T-S&L. The si
Sep 1, 2022
-
Analysis of Three Axial Load Tests on Large Bored Grouted Deep FoundationsBy Hayel M. El-Naggar, Marawan M. Shahien
"Large capacity piles are important type of foundation elements that are needed in case of high column loads such as in tall buildings with large span between columns. In many projects, especially if
Jan 1, 2017
-
Protection of Waterfront Properties by Pressed-In Sheet Pile SeawallsBy Ian Vaz, Takefumi Takuma, Rafael Holcombe, Chris DellAringa
"This paper will discuss the successful installation of seawalls for the first phase of a project in Long Beach in California known as the Naples Island Permanent Seawall Repair – Phase 1. How an unco
Jan 1, 2016
-
Experimental Studies on Behaviour of Single Pile under Combined Uplift and Lateral Loads (5ae0a39a-734f-4c2b-bd6b-06fe19e6d6ea)By K. Madhusudan Reddy
"Pile response under combined uplift and lateral load is very important and it is imperative to evaluate the effect of combined loading and only few studies were reported on pile behavior under combin
Jan 1, 2017
-
Simplified Model for Increased Lateral Resistance of Deep Foundations Using Soil MixingBy Hubert Law, Dan A. Brown, Kyle M. Rollins
"Soil mixing and jet grouting provide a means to significantly increase the lateral resistance of pile group foundations with relatively little investment of time, effort, and expense compared to the
Jan 1, 2015
-
Cyclic Degradation on Wind Turbine Foundations in Cohesive SoilsBy Yazen Khasawneh, Osvaldo P. M. Vitali, Mohammad Nassim
Wind turbines are subjected to complex form of cyclic loadings with variable amplitudes and frequencies. The cyclic loading and the accumulation of plastic strains with the number of cycles will resu
Sep 8, 2021
-
Nicholson In The Neighborhood: Virginia’S North Hill ProjectBy Dominic Ammon, Mark Rothbauer, Paul Landers P. E.
Across the Potomac River from the location of the DFI47 Annual Conference (October 2022), in Alexandria, VA, two large permanent anchored walls with a decorative shotcrete face were recently construct
Oct 1, 2022
-
Securing of In-Situ Cement Mixing Quality for the Expansive Soil with the ‘Montmorillonite’ InclusionBy Masaru Sakakibara, Ngo Tuan Anh, Mitsuo Nozu
"In the southern region of Vietnam and the southern United States, numbers of Deep Mixing (DM) columns have been installed to increase the stability of slopes and mitigate ground settlement. However,
Jan 1, 2015
-
Emergency Stabilization to Maintain CN Rail ServiceBy Rick Deschamps
"Fountain Slide is located approximately 10 mi (16 km) northeast of Lillooet, British Columbia, Canada, within the Coastal Mountain Range, and has been locally active since the 1970s. The project site
Jan 1, 2017
-
Economic Design Of Piling Platforms On Coarse Grained SubgradeBy Patrick Wong
The design of piling platforms is addressed in BRE (2004) for both fine grained and coarse grained subgrades. However, for coarse grained subgrades, piling platform designs can often be overly conserv
Nov 1, 2022
-
Design, Construction, and Performance of the Temporary Earth Retention System at No. 9 WaltonBy Joel B. Dellaria, Justin R. Lewis
"No. 9 Walton is a new high-rise condominium building located in the Gold Coast area of Chicago. The adjacent building, Walton on the Park, featured 4 levels of below grade parking and utilized a seca
Jan 1, 2017
-
Lessons Learned From Construction Of A Tire Plant In Karst, Ns2 Tires, White, GaBy Robert L. Goehring, Fred Munene
This case history for three major additions to a tire manufacturing plant in north Georgia discusses the impact of highly variable Karst (sinkhole) geology on both foundation design and construction.
-
An Analysis of LRFD for Helical AnchorsBy Ronaldo Luna, Donald Deardorff
"The use of load and resistance factor design (LRFD) is well documented since the 1960s for structural applications when it was first adopted into the American Concrete Institute Building Code in 1963
Jan 1, 2009
-
Constructing Tsunami Walls with Pressed-In Sheet and Pipe Pile Combi-WallsBy Takefumi Takuma, Tsunenobu Nozaki, Masashi Nagano
The city of Naruto in the southwestern part of Japan is situated at the mouth of the mighty Yoshino River. An approximately 1,000m-long levee/bulkhead along one of the river’s tributaries in the city
Sep 8, 2021
-
The Need For Air Control In Down The Hole Hammer Casing Advancement DrillingBy Frank J. Purcell
“Down The Hole” (DTH) hammer drilling is often necessary to advance the casing during pile construction where the test bores have determined difficult drilling conditions with obstructions such as bou
Nov 1, 2022
-
Large Scale Geotechnical Works on Norways Largest Infrastructure ProjectBy Brandon M. Robinson, Osman F. Besler, Dominik Gaechter
With the increase in population over the last decade, and anticipated population growth over the coming years, Norway is making significant investments in the Country’s infrastructure. Part of this in