Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    Field Trials of the Mobile Miner MM130 at Broken Hill

    The Mobile Miner MM130 was delivered to Broken Hill in February 1992. During March the machine was extensively trialled on the surface to test manoeuvrability, climbing ability and muck handling pri

    Jan 1, 1993

  • AUSIMM
    Microstructural Changes During the Reduction of Wustite (0fae6247-cbaa-4434-8050-a887fa11bf4e)

    By Hayes P. C, Matthew S. P

    The product morphologies formed on the reduction of dense wustite crystals are classified into three types, A) porous iron, B) porous wustite covered with dense iron, and C) dense wustite covered with

    Jan 1, 1985

  • AUSIMM
    Water Management in Mining - Is it Important

    By Gillies A. D S, Lee A. H

    Water is an integral component of a mining operation. To-date water management has received a low profile in the overall management of mining operations. To cost effectively meet the requirements of

    Jan 1, 1994

  • AUSIMM
    Experiences eith the Electric Overhead Trolley System at the CSA Mine, Cobar

    By Roberts M. L

    Long Shaft was initially developed using a rail haulage system on every working level comprising battery electric locomotives and granby trucks loaded by rail mounted rocker shovels. Production wa

    Jan 1, 1988

  • AUSIMM
    Application of DDM to Some Rock Pressure Problems in Japanese Deep Coal Mines

    By Ishijima Y, Goto T

    Displacement Discontinuity Method (DDM), which was originally developed by Crouch,S.L., is a powerful tool to calculate mechanical disturbances due to tabular excavations. Three topics on DDM appl

    Jan 1, 1992

  • AUSIMM
    Database of TBM Projects Undertaken Between 1950 and 1990 and an Assessment of Associated Ground Strength Limitations

    A review of all major TBM projects from 1974 to 1990 has been undertaken and the results entered into a database. A similar database was prepared from information obtained from a principal TBM manufac

    Jan 1, 1993

  • AUSIMM
    Minerals - Are They Needed?

    In the 100 years since the formation of The Australasian Institute of Mining and Metallurgy there have been significant changes in all aspects of the mining industry.A number of the changes have been

    Jan 1, 1993

  • AUSIMM
    Computer and Open Pit Mining : Out of the Iron Age

    By Neto J. A N

    Usually there are organisational interfaces between each stage - companies or departments. Each organisation will have different ideas about "optimum" operation. These ideas will be driven by how th

    Jan 1, 1991

  • AUSIMM
    The Impact of Controlled Blending at the Leinster Nickel Concentrator

    By Johnston S

    A blending trial was conducted on 60 per cent Perseverance/40 per cent Rockys Reward underground ore at WMC Resources Leinster Nickel Operations to compare the benefits between batching and blending

    Jan 1, 1997

  • AUSIMM
    Sampling of the Perseverance Nickel Deposit

    By Allchurch P. D

    At Perseverance a reserve of 45 million tonnes at 2% Ni was indicated by drilling. Holes were drilled in trellis pattern on section lines 61m apart to assess shallow mineralization. To explore at

    Jan 1, 1976

  • AUSIMM
    Development of Lancefield Panel Stoping

    A combination of highly structured, fissile stope hangingwalls and high ground stresses have caused difficult mining conditions in the Main Lode Deeps at Lancefield Gold Mine. Cyclic reviews of grou

    Jan 1, 1995

  • AUSIMM
    High Temperature Filtration in Soil Remediation

    By Mance G

    Today there are many different techniques of soil remediation used in Australia and throughout the world. This paper considers the thermal desorption remediation technique and, in particular, the a

    Jan 1, 1995

  • AUSIMM
    The Effect of Run-of-Mine Constituents on the Anodic Depolarisation of Sulphur Dioxide During Copper Electrowinning

    By Hefter G. T, Singh P

    The use of sulphur dioxide (SO2) as an anode depolarizer in place of traditional oxygen evolution reduces the energy costs of copper electrowinning. This paper reports the effect of various metal io

    Jan 1, 1998

  • AUSIMM
    Aluminium

    Aluminium, the third most abundant element in the earth's crust, has been regarded by some people as the metal of the 20th century. A metal symbolising another great leap forward in man's te

    Jan 1, 1985

  • AUSIMM
    Ignition of Elura Lead Concentrate Under Flash Drying Conditions

    By Turner T. M, Jorgensen F. R A

    The tendency of the concentrate to ignite was studied using four techniques, namely, laminar flow furnace, fluid bed, thermal analysis and boat-in-furnace. Exothermic activity occurred at two temp

    Jan 1, 1987

  • AUSIMM
    Analysis of Ball Mill Overload Condition at Bougainville Copper Ltd.

    It is important to prevent the overload ing of mills being operated near maximum tonnage. Changes occurring during overload differ in their usefulness as guides to control action. The Primary Ball

    Jan 1, 1978

  • AUSIMM
    Monitoring of A Railway Tunnel Excavated Through Bouldery Soil

    By Thomson S, Eisenstein Z

    Field instrumentation was installed to monitor ground and lining behaviour during and after construction of the Mount Shaughnessy Tunnel (Rogers Pass Short Tunnel) in Canada. The instrumentation w

    Jan 1, 1987

  • AUSIMM
    Increased Gold Recovery at PT Freeport Indonesia Using Aero« 7249 Promoter

    By Gorken A, Mular M, Stewart A

    PT Freeport Indonesia operates one of the largest copper and gold concentrator complexes in the world. Flotation is used to produce a single copper-gold concentrate. In 1995, PT Freeport Indonesia a

    Jan 1, 1997

  • AUSIMM
    A Generalized Account of the Paraburdoo Iron Orebodies

    By Jackson D. G

    Iron ore mineralisation in the Paraburdoo environs is known to extend almost continuously over a strike length of 55 kilometres. Six formations of the Mount Bruce Supergroup con- tain high grade min

    Jan 1, 1979

  • AUSIMM
    An Estimate of Nickel Solubility in Industrial Slags

    By Biswas AK

    The solubility of nickel in matte smelt- ing slags, both as oxide and in the metallic form, is predicted using the results of a recent experimental work carried out with lime- free iron silicate slag

    Jan 1, 1975