Search Documents

  • CIM
    Chipewyan Granite - a Building-Stone Prospect in Alberta

    By John D. Godfrey

    Geological mapping on the Canadian Shield in northeastern Alberta outlined severalgranitoid rock massespotentially suitable as building stone. A particularly attractive prospect, the Chipewyan Red Gra

    Jan 1, 1979

  • AUSIMM
    FLSmidth Flotation Developments - Dorr Oliver Machines

    By S Vianna, K Caldwell, R Silva, T Olson, D Bell

    Studies to enhance the FLSmidth forced air machine through changes in the design, showed important improvements through changes in the number of Rotor blades, stator designs, rotor air distribution an

    Jul 15, 2013

  • IIMP
    Integración del proyecto Antapaccay con el cierre progresivo de las operaciones de Tintaya

    By Luis Espinoza

    La unidad minera Tintaya al igual que la Unidad Minera Antapaccay, son las operaciones de la división Perú de Xstrata Copper dedicados a la producción y comercialización de concentrado y cátodos de co

    Sep 21, 2013

  • CIM
    A New Potential Standard in Monitoring and Optimizing Deposit Control in Mining Process Waters

    By W. J. González

    "With the increasing demand for minerals, technologies to maximize mineral recovery are paramount to a mine’s economic success. Many mining process waters have the potential to form calcium-based inor

    Jan 1, 2014

  • CIM
    Optimization of Pellet Plant Process Parameters Using Six Sigma Methodology

    By Andrea McGlynn

    Iron Ore Company of Canada, Labrador City 2011?Canada's largest iron ore producer, leading global supplier of iron ore pellets and concentrates ?Rio Tinto (58.7%), Mitsubishi Corporation (26.2%

    May 1, 2011

  • TMS
    Characterizing the Mechanical Properties of Wax-Coated Granular Composites

    By J. W. Bridge

    Triaxial compression tests at various confining pressures and temperatures, as well as tangent modulus tests using ultrasonic waves, were conducted for wax-coated granular composite materials. The mat

    Jan 1, 2010

  • NIOSH
    Assessment And Evaluation Of Noise Controls On Roof Bolting Equipment And A Method For Predicting Sound Pressure Levels In Underground Coal Mining

    By Rudy J. Matetic

    Over-exposure to noise remains a widespread and serious health hazard in the U.S. mining industries despite 25 years of regulation. Every day, 80% of the nation’s miners go to work in an environment

    Jan 1, 2006

  • ISEE
    Blasting Overhangs Close to a Vibration Sensitive Structure

    By R. Franfield

    This paper describes a situation that many drilling and blasting contractors have found themselves in – a client?s fear of the use of explosives. In the summer of 2007 Blasting Services Ltd was asked

    Jan 1, 2009

  • SME
    Towards a More Cost Effective Mining Truck – Preprint 97-55

    By A. W. Dickerson, G. Hollier, F. A. Bartley

    Following on from many years of research aimed at improving the effectiveness of truck haulage operations in mines operated by BHP Minerals, BHP Research developed a concept for an Innovative Large Mi

    Feb 24, 1997

  • CIM
    Commissioning of a Brownfield CDS Plant: Victories and Pitfalls (48th Annual Canadian Mineral Processors Operators Conference)

    By N. Romani, R. Provost

    "Commissioning of a circulating dry scrubber (CDS) plant was recently completed at an existing facility in Québec, Canada. The CDS plant treats the sulphur dioxide off-gas emitted from rotary kilns i

    Jan 1, 2016

  • AUSIMM
    Hydrometallurgical Extraction of Tungsten from Low Grade Residue Dumps

    The alkaline ethylenediamine tetra-acetic acid (EDTA) leach process for extracting tungsten from scheelite (CaW04) ores has been examined for the treatment of low grade (<0.5 per cent WO,) residue

    Jan 1, 1983

  • AUSIMM
    The Future of Mining on Pitjantjatjara Lands

    In 1976 the Pitjantjatjara Council was established under the Associations Incorporation Act 1985 (SA), for the initial purpose of organising and bringing together three similar Indigenous groups. Thes

    Jan 1, 2002

  • AIME
  • CIM
    Blast simulation surface and underground with the SABREX model

    By G. K. Jorgenson, S. H. Chung

    "IntroductionThe SABREX Blast Modelling Program was developed jointly by the companies of the ICI Explosives Group, of which C-I-L Inc. is a member. SABREX (Scientific Approach to Breaking Rock with E

    Jan 1, 1987

  • ISEE
    An Integrated Explosive Management, Blast Design and Loading System

    By Ola Lindahl, Mark Irving, John Hutchings

    "Blasting is a process starting with a geometric description of the block of rock and ending with a pileof fragmented material. A key step in improving the productivity and quality control over the pr

    Jan 1, 1997

  • AUSIMM
    Notes on the Phillips River Gold and Copper Field

    THE Phillips River gold and 'copper field is situated on the south coast of Western Australia, about 200 miles east of Albany, 180 miles west of Esperance, and: 250 miles south of Southern Cross,

    Jan 1, 1917

  • AUSIMM
    Intrusion-Alteration-Mineralisation Relationships in the Frieda River Igneous Complex, PNG

    By R Handfield, G Kary, Frieda Project

    Recent exploration by the Cyprus Amax-Highlands Pacific-OMRD Joint Venture at the Frieda River project, PNG has demonstrated the extent of igneous phases, alteration and mineralisation, and the relati

    Jan 1, 1999

  • AUSIMM
    Increasing Grinding Circuit Robustness with Advanced Process Control

    By A Rantala, K Aberkrom, O Haavisto, P Blanz

    More complex ore bodies with lowering grades increase the challenges of maintaining high throughput, energy efficiency and required particle size for optimal downstream processing in grinding circuits

    Sep 7, 2015

  • NIOSH
    IC 8177 Oil Recovery By Miscible-Phase Displacement: A Bibliography ? Introduction (328bb1d3-3996-4ea1-925a-2089360bbaba)

    By L. K. Weaver

    The Bureau of Mines has started an engineering study of oil recovery by miscible-phase displacement. As a preliminary part of the investigation a literature and patent study was made to prevent duplic

    Jan 1, 1963

  • SME
    8 M Diameter 7 KM Long Beles Tailrace Tunnel (Ethiopia) Bored And Lined In Basaltic Formations In Less Than 12 Months

    By Antonio Raschillà

    On the 2nd of June 2007 SELI S.p.A. started the excavation of Beles Tailrace Tunnel (Ethiopia). The new 8,07 m diameter DS Universal TBM utilized for the tunnel excavation was manufactured by SELI S.p