Search Documents

  • SME
    Shaft Construction in Toronto Using Slurry Walls

    By Vince Luongo

    PROJECT DESCRIPTION The York Durham Sanitary System (YDSS) Interceptor in the Town of Richmond Hill located just north of Toronto, Ontario, Canada will see the construction of a tunnel extending a

    Jan 1, 2007

  • ISEE
    Fire and Explosion of a Mobile Explosive Manufacturing Unit

    By Jose a. Sanchidrian, Ramon G. Eguren, Javier L. Amigo

    On December 2013 a MEMU exploded at a blasting site in Norway, after burning for more than two hours. This paper describes the analyses made to determine the actual yield of the explosion, the lessons

    Jan 1, 2016

  • DFI
    Keynote Lecture: Axial Design And Lateral Design - Deep Foundations

    By Mike Neill, O&apos

    ? Bypass soft soils near the surface ? Resist uplift loads ? Resist lateral loads ? Bypass scourable soils ? Bypass liquefyable soils ? Mitigate movement of expansive or frozen soils ? "Tu

    Jan 1, 1998

  • SAIMM
    Integrated Furnace Controls: Implementation On A Covered-Arc (Shielded Arc) Furnace At Cerro Matoso

    By T. Gerritsen, R. C. Delgado, J. Janzen, E. R. Veloza

    The paper describes the components of an Integrated Furnace Control system for covered-arc (shielded arc) smelting with results from the recently started 75 MW Cerro Matoso Line 2 Furnace. The paper s

    Jan 1, 2004

  • NIOSH
    Analysis Of Practical Ground Control Issues In Highwall Mining

    By R. Karl Zipf, Suresh Bhatt

    Highwall mining is an important coal mining method. It appears that upwards of 60 highwall miners are presently in operation, and they may account for approximately 4% of total U.S. coal production.

  • CIM
    Industrial Validation of the Functional Performance Equation – A Breakthrough Tool for Improving Plant Grinding Performance

    By Robert E. McIvor

    The Functional Performance Equation for Ball Milling” was first presented in 1988. It now has been used successfully in more than a dozen mineral processing plants. This powerful, yet simple tool prov

    Jan 1, 2005

  • DFI
    Kentucky Route 9 - Licking Pike Widening Design Build Slope Stabilization

    By Frederick W. Slack

    This paper will discuss the inherent value engineering associated with the design and construction of approximately 184,000 SF of anchored tieback wall, installed as part of the widening and drainage

    Jan 1, 2003

  • SME
    Practical Application Of A Partial Cab To Reduce The A-Weighted Sound Level At The Operator’s Station On Surface Drill Rigs (16e0ea79-d925-4b2c-a99c-4b4744e63b41)

    By P. Jurovcik, D. Yantek, D. Ingram

    The National Institute for Occupational Safety and Health (NIOSH) identified hearing loss as the most common job-related disease in the United States in its 1996 National Occupational Research Agenda.

    Jan 1, 2007

  • NIOSH
    An Alarm To Warn Of Overhead Power Line Contact By Mobile Equipment

    By J. C. Cawley, G. T. Homce, M. R. Yenchek, H. K. Sacks

    As in many other industries, such as construction and agriculture, overhead electric power lines are a serious hazard at mining and mining-related operations. Even when excluding injuries that occur

  • NIOSH
    Technology News - No. 517 - New Updates For NIOSH Coal Mine Ground Control Software

    The NIOSH suite of coal mine ground control software addresses nearly every aspect of coal mine ground control planning, including geologic characterization, mine layout, pillar design, and support se

    Jan 4, 2006

  • DFI
    Experimental Study Of Axial Bearing Capacity Of Half-Closed End Steel Pipe Piles ? Synopsis

    By Y. G. Qin

    In this article an experimental study of axial bearing capacity of half-closed steel pipe pile installed at BKSH dock is presented. In comparison with open and closed end piles, half-closed end pile i

    Jan 1, 2010

  • AUSIMM
    Recovery of Sulphur from Smelter Gases at Kalgoorlie

    Some design and feasibility studies have been made into possible methods of economic recovery of sulphur from smelter gases emitted at Western Mining Corporation's Nickel smelter at KalgoorIie in

    Jan 1, 1983

  • SME-ICGCM
    Large Scale Ground Instability Caused By Failure of Underlying Pillars: A Case Study of Dynamic Multiple Seam Interaction

    By Christopher Mark

    Severe dynamic multiple seam interactions can occur when active mine workings are subsided by underlying mining activity. The most dramatic events are usually caused by longwall mining or pillar recov

    Jan 1, 2012

  • DFI
    Unusual Dolphin Monopile Structure

    By C. T. Christensen

    The paper gives an outline of the design, installation and performance of a series of mooring and berthing dolphins for a major ferry berth outside the port of Elsinore, Denmark. The Dolphins are larg

    Jan 1, 1989

  • SME
    Construction of the Big Walnut Augmentation/Rickenbacker Interceptor Tunnel (BWARI, Part 1) —Columbus, Ohio

    By Glen D. Frank, Jeremy P. Theys, Mina M. Shinouda, Gary W. Gilbert

    PURPOSE OF THE PROJECT The Big Walnut Augmentation Rickenbacker Interceptor project began in 1995with the preparation of the Scope of Services for the design of the Rickenbacker Interceptor, with

    Jan 1, 2007

  • SME
    Design and Construction of the DLR Extension to Woolwich Arsenal, London, UK

    By Andy Alder

    The Docklands Light Railway (DLR) Extension to Woolwich Arsenal provides a much-needed public transport link to this area of London. The project includes construction of 5.3mID running tunnels under t

    Jan 1, 2008

  • SME
    Slurry Shield Tunneling in Portland—West Side CSO Tunnel Project

    By James J. Kabat, James A. McDonald

    Impregilo/SA Healy JV recently completed this Project using the first slurry shield TBM’s in the United States. The Project used two TBM’s to mine 18,000 feet in sands, gravels, and silty alluvial mat

    Jan 1, 2007

  • ISEE
    The Effect of Calculated Explosive Energy Output on Blast Design

    By P D. Kasbanis, Lyall Workman

    "The energy output of an explosive is typically calculated using an equation of state and computerapplications. Results are reported as weight and bulk strength, either in absolute terms or relative t

    Jan 1, 1996

  • CIM
    Mining for Space Why now?

    By Michel Doyon

    Canadian Context: Exploration ??Space Exploration is within the unique mandate of the Canadian Space Agency ??Global partnerships ??Maintain close relationship with our partners ??New knowledge

    May 1, 2009

  • DFI
    Response to Load for Four Different Types of Bored Piles

    By Mario Terceros H., Bengt H. Fellenius

    "ABSTRACTFour strain-gage instrumented bored piles were constructed in a sedimentary, dense to very dense, fine to medium sand in Santa Cruz, Bolivia. Two of the test piles were the normally used bore

    Jan 1, 2014