Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
An Innovation Of Practical Underground Stope Design Optimization And Cut-Off Grade CalculationAn incremental analysis based stope design optimization method was developed at Exodus, an underground project located 30 miles north of Carlin, Nevada. Traditional underground stope design methods, b
Jan 1, 2012
-
Laboratory Experiences in the Heat Hardening of Australian High Grade Iron Ore PelletsBy OÆBrien R. T
A small static bed was used to study the thermal cycles required for the heat hardening of pellets based on synthetic magnetite concentrates and a naturally fine hematite. This apparatus can be employ
Jan 1, 1963
-
Environmental Management At Homestake Mclaughlin Mine (PREPRINT 90-23)By R. E. Krauss
The McLaughlin Mine is a world class epithermal gold deposit located in the coastal thrust fault of Northern California, U.S.A. Homestake adopted a proactive strategy in the permitting of the Mine. Ex
Jan 1, 1990
-
RI 4288 Flood-Prevention Projects at Pennsylvania Anthracite Mines Progress Report for Fiscal Year Ended June 30, 1947By W. E. Cassan, W. L. Eaton, James Westfield, W. M. Romisher, Karl Hughes, S. H. Ash
"INTRODUCTION Funds were made available to the Bureau of Mines, United States Department of the Interior, for anthracite investigations during the fiscal year ended June 30, 1945. One of the approved
Apr 1, 1948
-
RI 3526 National Safety Competition of 1939By W. W. Adams, T. D. Lawrence
The National Safety Competition , a safety contest conducted annually by the Bureau of Mines , United States Department of the Interior , to promote safety at mines and quarries , has just resulted in
Jun 1, 1940
-
Mine Production Scheduling Optimization At Newmont?s Twin Creeks MineNewmont?s Twin Creeks Mine, located in northern Nevada, is producing gold ore from surface mining operations. The ore is currently processed at three different on site facilities depending on the ore
Feb 27, 2013
-
OFR-68-73 EM Location System Prototype And Communication Station Modification (3f90e3fe-7df3-4a30-87c7-cb58a9840560)A prototype EM Location System was fabricated and tested at the Geneva Mine near Dragerton, Utah. This system consisted of six manpack transmitters and six manpack receivers covering the frequency ban
Jan 1, 1973
-
Notes on the Geology of the Pinnacles Mine and DistrictA homely simile will serve to epitomise an interpretation of the rock structures and associated phenomena of the block of country under review, as it appears to the writer.Disregarding the many thousa
Jan 1, 1927
-
Design and manufacturing of a teleoperated excavator platform APCOM 2021By M. Salimov, J. Sattarvand
The conventional visualisation method of remote equipment is through the installation of one or more cameras on the machine, and sending a live feed to the operator’s flat display. However, the perfor
Sep 1, 2021
-
IC 9446 - Proceedings: New Technology for Ground Control in Retreat Mining (527573bb-29f1-4fad-af4c-300b18740c2b)By Christopher Mark
This proceedings volume contains papers presented at technology transfer seminars sponsored by the National Institute for Occupational Safety and Health (NIOSH) on New Technology for Ground Control in
Jan 1, 1997
-
A Blueprint for Performance-Driven Operations Management Mining, Metallurgy and ExplorationBy W. F. Visser
The growing availability of information and data analysis capabilities of recent years provides new opportunities for improving the performance of mining operations. By using real-time measurements an
-
OFR-146-80 Environmental Effects Of Slaking Of Surface Mine Spoils Eastern & Central United StatesBy D. E. Andrews
The objective of this study was to investigate the environmental effects of slaking of surface mine spoils. To accomplish this, both field and laboratory programs were undertaken, supplemented by a th
Jan 1, 1980
-
Gold recovery from waste-activated carbon— a comparison between mechano-chemical pretreatment and charcoal augmented oxidationBy W. K. Buah, R. K. Amankwah
Waste-activated carbon generated by gold ore processing plants that employ carbon adsorption technologies may contain very high gold values and represent a potential source of extra revenue. In this r
Jan 1, 2007
-
OFR-160-77 The Hydraulic Transportation Of Oil ShaleBy James M. Link
A program was initiated tinder sponsorship of the U. S. Bureau of Mines to investigate pipeline behavior of raw and spent oil shale slurries. Slurries were recirculated in pipeline loops with 150-mm a
Jan 1, 1977
-
Reserve’s Process Modifications Succeed at Silver BayBy Charles L. Allie
Since Reserve Mining Co. began commercial operations at Silver Bay, MN, some 25 years ago, major improvements in taconite processing technology have become available. In addition, significant new gove
Jan 12, 1980
-
RI 3483 Progress Reports - Metallurgical Division - 35. Electrometallurgical Investigations ? IntroductionBy J. Koster
[In lQ jG thc E'lcct,ro:~(: L7.l :~u..-ic:ll S;%cti ?n of t?c :I. tcIl~tr,-;lcal 3:vi cioa, ?U~CE~U of lv!irtos, bc,~m an 9.ct iv.t In-:?*t ik7;5i GI of r.:ct.l-;c?;is for rccovcrin,; niclrel, co
Jan 1, 1939
-
Production Engineering - Geology and Development of the Paloma Field, Kern County, California (T. P. 1471)By James T. Wood
Stratigraphy, structure and closure of the Paloma field are discussed, with some details regarding the present state of development. The Paloma anticline, a large dome modified by faults, is the large
Jan 1, 1942
-
Production Engineering - Geology and Development of the Paloma Field, Kern County, California (T. P. 1471)By James T. Wood
Stratigraphy, structure and closure of the Paloma field are discussed, with some details regarding the present state of development. The Paloma anticline, a large dome modified by faults, is the large
Jan 1, 1942
-
Tailings Disposal Area Development at Inco Sudbury OperationsBy J. P. Van Cruyningen, M. J. Puro
"A 2400 acre extension to the existing Tailings Area is under development at Inco's Copper Cliff Milling operations.The new area is being developed in stages as production levels dictate thus minimizi
Jan 1, 1987
-
OFR-23(2)-76 A Technical And Economic Study Of Candidate Underground Mining Systems For Deep, Thick Oil Shale Deposits - Final Report, Phase IIBy W. N. Hoskins
This report covers the final results of a two-phase contract study conducted between July 1974 and October 1976. A comprehensive summary of the initial phase of the study is included. Phase I of t
Jan 1, 1976