Search Documents

  • SME
    Mine Health and Safety at the Turn of the Millennium

    By Raja V. Ramani

    As the new millennium approaches, it is appropriate to assess the progress that has been made in mine health and safety, a matter of concern to management, labor and government. One can hardly look a

    Jan 1, 1999

  • AUSIMM
    Design to closure – construction of detailed rehabilitation designed iron ore waste rock dumps based on upfront site specific assessment

    By A Kemp, I Taylor, S C. Lamoureux

    Detailed landform designs were completed for six (integrated) iron ore waste rock dumps at a Western Australian iron ore mine site to meet closure objectives and to optimise material movements for clo

    Jul 24, 2017

  • AIME
    Mining - Ground Movement and Subsidence from Block Caving at Miami Mine

    By J. B. Fletcher

    The Miami mine first started operations in 1910. For convenience, the history of the orebody can be divided into the following categories (Fig. 1): 1) 1910 to 1925: 24.4 million tons of high grade

    Jan 1, 1961

  • NIOSH
    OFR-149-84 Development And Validation Of A Training Program For Operators Of Noncoal Equipment - Volume I. Final Report

    This report describes the development of training materials for the operators of underground mining equipment in the underground metal and nonmetal mining industry. The objective was to determine the

    Jan 1, 1984

  • AUSIMM
    A Three-Dimensional Section Through the Otago Schist, New Zealand

    By D Craw

    Formation of gold-bearing veins in Otago Schist was intimately linked to the structural evolution of the schist belt. The currently-exploited Macraes gold deposit formed in a regional scale shear zone

    Jan 1, 2001

  • NIOSH
    OFR-46(1)-81 Risk Analysis For Rock Slopes In Open Pit Mines - Final Technical Report - Part I - Distributions Of Rock Mass Properties

    By Herbert H. Einstein

    The thrust of research reported in Part I was to collect in-situ data from exploration programs and the published literature, and to empirically establish distributional patterns for these variables.

    Jan 1, 1979

  • DFI
    Static Uplift and Lateral Load Testing of Piles for a New Power Plant

    By José L. M. Clemente, John R. Davie

    "Abstract An extensive pre-production static and dynamic pile load testing program was conducted for a coal-fired power plant. The static load testing program included axial compression, uplift (tensi

    Jan 1, 2014

  • SME
    Use of high-efficiency electrical submersible pumps for mine dewatering

    By K. Lang

    The use of high-efficiency electrical submersible pumps (ESPs) for large scale, open pit mine dewatering operations provides a good example of how technology, products and services from the oil and ga

    Sep 1, 2013

  • AUSIMM
    Copper Reduction from Solution With Copper Sponge

    The observation of lower-than-predicted Fe/Cu ratios in the cementation of copper on iron in tests at elevated temperatures indicated that some other reaction was contributing to the reduction of cupr

    Jan 1, 1974

  • CIM
    Process Control... And Where Are We Going?

    By Brian Flintoff

    "When I was first asked to prepare this paper and presentation in late June, I thought it might be fun to ""step back and paint the bigger picture."" Having attempted to do this, fun is not the first

    Jan 1, 1998

  • CIM
    Borehole seismic survey for mineral exploration: Case histories from Norman West and Halfmile Lake

    By G. Bellefleur, K. Stevens, E. Adam, D. Synder, G. Perron, C. Müller

    The Downhole Seismic Imaging consortium was initiated by the Geological Survey of Canada and three Canadian mining companies to assess the usefulness of borehole seismic techniques for the exploration

    Jan 1, 2004

  • AUSIMM
    Innovative and Resource-Preserving Washing Processes for Primary and Secondary Raw Materials

    Innovative and Resource-Preserving Washing Processes for Primary and Secondary Raw Materials

    Sep 13, 2010

  • SME
    The Treatment Of Copper Ores And Concentrates With Nitrogen Species Catalyzed Pressure Leaching

    By C. G. Anderson

    Today, with a stringent economic and environmental climate prevailing in the copper business, there is increased interest in evaluating new processing alternatives for production. Hydrometallurgical p

    Jan 1, 2001

  • SAIMM
    Breakage mechanisms and an encouraging correlation between the Bond parameters and the friability value ? Synopsis

    By H. T. Ozkahraman

    It is important to know the breakage mechanism in materials since this knowledge influences the results of subsequent grinding operations. There are two distinct failure mechanisms in breakage: one is

    Jan 1, 2010

  • NIOSH
    IC 9379 Coal Reserves Of The Boltsfork Quadrangle, Kentucky A Coal Recoverability Study

    By Timothy J. Rohrbacher

    This report presents a U.S. Bureau of Mines study that incorporates coal mining factors, coal recovery factors, and economic factors into the definition of an economically recoverable coal resource. T

    Jan 1, 1994

  • SME
    Online Presentation Aids Classroom Teaching

    By Rajive Ganguli

    There are several elements of online pedagogy and information technology that are being used in the University of Alaska Fairbanks’(UAF) course “ES 201: Computer Techniques,” to enhance classroom teac

    Jan 1, 2000

  • NIOSH
    RI 3165 Re-Treatment of Fine Washed Coal from the Black Creek and Mary Lee Beds on Coal Washing Tables

    By R. Q. Shotts, H. J. Hager, A. C. Richardson, G. D. Coe

    "INTRODUCTION In the State of Alabama few mines produce coal clean enough to be marketed directly without being washed. This is particularly true where the coal is to be used for the production of met

    Apr 1, 1932

  • SME
    Exploration Of Exmibal's Nickel Laterite Deposits In Guatemala

    By H. O. Harju

    Inco acquired majority interest in the nickel laterite concessions in eastern Guatemala in 1960 and, through its subsidiary Exmibal, extensively explored the deposits until 1965 to define the site for

    Jan 1, 1979

  • AUSIMM
    Using existing data to improve the delineation of ore at the Olympic Dam Fe-oxide Cu-U-Au-Ag deposit

    By K Ehrig, J Griffith

    An extensive suite of elements are routinely assayed on all resource drill core samples to assist in deposit scale resource definition, local mine scale delineation of ore zones, and ore characterisat

    Sep 20, 2017

  • SME
    Simulation Of Water Seepage Through And Stability Of Coal Mine Barrier Pillars (cd82e376-55f5-444d-97a9-eac4b7728369)

    By Y. Q. Zhang, Y. Luo, S. S. Peng, C. T. Holland

    Barrier pillars in underground coal mines could eventually be subjected to a hydraulic pressure head due to the build-up of mine water in the old workings. The pressure head could not only act as a fo

    Jan 1, 2001