Search Documents

  • SME
    Numerical Parametric Study of Floor Heave in Gate Roads Caused by Longwall-Induced Abutment Loading

    Floor heave events in underground mining often happen suddenly and cause risk to workers and equipment. Reducing the risk of floor heave must be addressed in mining layout design. To improve that desi

    Jan 7, 2020

  • SME
    Workshop Attendees Compare Ore Modeling and Mine Planning Software Systems

    By Betty Gibbs

    The Ore Body Modeling and Mine Planning Worshop, sponsored by the Society for Mining, Metallurgy, and Exploration, Inc. (SME), was held Feb. 22-24, 1991 before the SME Annual Meeting and Exhibit in De

    Jan 1, 1991

  • AIME
    Natural Gas Technology - Mechanisms by Which Pentane and Hexane Adsorb on Silica Gel

    By H. O. McLeod, J. M. Campbell

    Data analysis of pentane and hexane adsorption from natural gas in a fixed bed of silica gel shows that constant length mass transfer zones form, the curvature of the adsorption isotherm controls the

    Jan 1, 1967

  • AIME
    Mining Geology ? Use of Geology in Search for Ore Increasing Over a Wide Front

    By GEO M. FOWLER

    AN appraisal of the activities of the mining geologists during 1936 clearly indicates the ever in- creasing utilization of geology in the search for ore. Few men with geo- logic training are idle at p

    Jan 1, 1937

  • NIOSH
    Technology News - No. 527 - The Partial Cab: A New Noise Engineering Control For Surface Drill Rigs

    The National Institute for Occupational Safety and Health (NIOSH), in partnership with stakeholders in the mining and surface drilling industries, con-ducted research to develop engineering control te

    Jan 8, 2007

  • ISEE
    Blasting Mitigation Measures Used to Control a Highwall Failure Risk

    By Jean-Sébastien Lambert, Joseph Kabuya, Richard Simon

    Managing a highwall failure risk in an open pit mine by controlling and mitigating the impact of vibrations produced by blasting operations is key to achieving safe and cost-effective operations. The

  • NIOSH
    IC 6869 Asbestos - Milling, Marketing, And Fabrication ? Introduction

    By Oliver Bowles

    This paper is the third of a series of reports on asbestos prepared by the Bureau of Mines. The reports already issued contain general information, including descriptions of deposits throughout the wo

    Jan 1, 1935

  • SME
    Evaluation Of Temperature Effect On P-Wave Velocity, UCS And Elasticity Modulud Of Rocks, Using Newly Developed Apparatus

    Instabilities occurred as a result of climate changes caused to investigate the rock behavior dependency to temperature changes, in this paper. In the natural earth condition, the phase transition of

    Feb 27, 2013

  • DFI
    A Brand New Barrier Wall Installed at Wolf Creek Dam

    By Maurizio Siepi, Fabio Santillan, Lyndon Bedford, Carlo Crippa

    "Abstract: Wolf Creek dam, on the Cumberland River in Kentucky, US, operated and maintained by the Nashville District of the USACE, is the Corps' largest reservoir east of the Mississippi river. The 1

    Jan 1, 2014

  • NIOSH
    IC 7300 Milling And Smelting Operations Of The Magma Copper Co., Superior, Ariz. ? Introduction

    By Edward J. Caldwell

    In 1930 the Bureau of Mines published a description3/ f the concentrating process of the Magma Copper Co. as it had been developed to that time and was then employed. The prevent paper revises the des

    Jan 1, 1944

  • CIM
    Towards Petrophysical Characterization of Comminution Behavior

    By Peter Fullagar, Adel Vatandoost, Steve Walters, Toni Kojovic

    "Traditional comminution tests are a vital component in every mine plant design. Comminution behavior governs both the cost of equipment and its operating efficiency. Most comminution tests are conduc

    Jan 1, 2009

  • SME-ICGCM
    Estimation of in-situ material strength

    By Danell. R. E.

    A drill monitoring system has been developed which measures performance characteristics of a rotary drill and relates this to the material strength and rotary specific energy. The drill monitor is com

    Jan 1, 1989

  • CIM
    Design, Construction and Commissioning of Gold Tailings Plant at Mazowe Mine, Zimbabwe

    By Peter Makuvise, Alain M. Bantshi

    "The Mazowe Gold Mine is managed by Metallon Gold (Zimbabwe) and is situated in the west-central part of the Harare greenstone belt. Orebodies here generally comprise shear zones which are in-filled w

    Jan 1, 2017

  • DFI
    Piled Foundation Design as Reflected In Codes and Standards

    By Bengt H. Fellenius

    "ABSTRACTAn example from a guidelines document for the Eurocode is discussed that addresses design for geotechnical strength of piled foundations in settling soil, generating drag force and downdrag.

    Jan 1, 2014

  • CIM
    Paleoproterozoic Age Relationships in the Three Bluffs Archean Iron Formation-Hosted Gold Deposit, Committee Bay Greenstone Belt, Nunavut, Canada

    By D. W. McDonald, L. M. Heaman, R. A. Creaser, T. Davies, T. Chacko, A. Simonetti

    "The Three Bluffs gold deposit is located in the Committee Bay greenstone belt, which forms part of the Rae domain of the western Churchill province, Nunavut, Canada. Gold mineralization is hosted by

    Jan 1, 2009

  • NIOSH
    RI 8690 Recovery of Zinc and Sulfur From Sphalerite Concentrates by Reaction With Sulfuric Acid

    By H. H. Dewing

    The Bureau of Mines constructed a process research unit (PRU) to demonstrate new technology for extracting zinc from sphalerite concentrates. Up to 9 kg/hr of sphalerite (ZnS) concentrate was reacted

    Jan 1, 1982

  • SME-ICGCM
    New Laminated Displacement-Discontinuity Program: Fundamental Behavior

    By Keith A. Heasley

    In the past, numerous displacement-discontinuity (DD) models of stratified rock masses have been proposed using a homogeneous isotropic elastic overburden. In this paper, it is postulated that a lamin

    Jan 1, 1996

  • SME
    Site Development Over an Abandoned Coal Mine

    By Gennaro G. Marino

    During the preliminary design stages of the Illinois Division of Natural Resources(DNR) building, it was discovered that an old coal mine was present some 70 m (220 ft) beneath the building site. Th

    Jan 1, 2000

  • DFI
    Accessories For Driven Piles ? Synopsis

    By H. W. Hunt

    Accessories are increasingly used to protect and extend H, pipe, precast concrete, timber, and sheet piles for any soils conditions. With point protection, piles can be driven through boulders, layere

    Jan 1, 2010

  • IIMP
    Geología estructural del neógeno en la cordillera negra, implicaciones en la estabilidad de taludes del yacimiento aurifero epitermal de alta sulfuración: pierina

    By Esteban D. Manrique Z.

    El presente texto describe la geología estructural de la mina Pierina, Ancash, donde se resolvió los problemas geotécnicos de dicho yacimiento, producto de la geodinámica externa. Asimismo, señala los

    Sep 12, 2011